GTR 80218936

Tenders Are Invited For Carrying Out Post-Consolidation Development As Part Of The Task Entitled Consolidation Of Land In The Busówno, Busówno-Kolonia And Pniówno Districts, Wierzbica Commune, Chełm District, Lublin Voivodeship - Stage I

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
80218936
Tendering Authority
Subscribe to view
Tender No
OG.272.1.31.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Carrying Out Post-Consolidation Development As Part Of The Task Entitled Consolidation Of Land In The Busówno, Busówno-Kolonia And Pniówno Districts, Wierzbica Commune, Chełm District, Lublin Voivodeship - Stage I
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
24-05-2024 Closed
Work Detail
1. The Subject Of The Order Includes The Execution Of Construction Works Consisting In: A) Construction Of A Municipal Road From Km 0+000 To Km 0+721.93 (Marked In The Post-Consolidation Development No. I), B) Construction Of An Internal Road From Km 0+000.00 To Km 0+308.66 (Marked In Post-Merger Development No. Ix) Along With The Construction Of An Exit To The Provincial Road No. 841, C) Construction Of An Internal Road From Km 0+000 To Km 0+404.63 (Marked In Post-Merger Development No. Va), D) Construction Of A Municipal Road From Km 3+086.80 To Km 3+908.95 (Marked In Post-Merger Development No. Vi), E) Reconstruction Of An Internal Road From Km 0+000 To Km 1+762.64 (Marked In Post-Merger Development No. Xxv), F) Construction Of A Culvert On Plot No. 468, Busówno District, G) Removal Of Bushes, Removal Of Old Roads And Edges On Plot No. 495, 492, 496, 499, 467, 454, 456, 455, 452, 493, 494, Busówno District, As Part Of The Implementation Of The Investment Project Entitled Consolidation Of Land In The Busówno, Busówno-Kolonia And Pniówno Districts, Wierzbica Commune, Chełm County, Lublin Voivodeship Covering Stage I Of The Task Regarding The Implementation Of Works Related To The Post-Consolidation Development Of The Busówno And Busówno-Kolonia Districts.2. The Scope Of The Planned Works Includes, Among Others: 1) In The Scope Of The Road Marked No. I: A) Preparatory Works On A Section With A Length Of 0.722 Km, B) Felling Of Trees And Bushes Together With Grubbing Up Stumps, C) Demolition Works, D) Earthworks, E) Drainage Of The Road Body, F) Construction Of The Substructure, G) Construction Of A Surface Made Of Mineral And Asphalt Mixtures, H) Construction Of Roadsides, I) Finishing Works, J) Road Marking, K) Reconstruction Of The Telecommunications And Power Grid, L) Securing The Telecommunications And Power Grid. 2) In The Scope Of The Road Marked No. Ix: A) Preparatory Works On A Section With A Length Of 0.309 Km, B) Cutting Down Trees And Bushes Along With Clearing Tree Trunks, C) Demolition Works, D) Earthworks, E) Construction Of The Foundation, F) Construction Of The Surface From Mineral-Asphalt Mixtures, Crushed Aggregate And Concrete Slabs,G) Construction Of Road Drainage Elements,H) Construction Of Roadsides,I) Finishing Works,J) Road Marking,K) Securing The Telecommunications And Power Grid.3) In The Scope Of The Road Marked No. Va :A) Preparatory Works On A Section With A Length Of 0.405 Km, B) Cutting Down Trees And Bushes Along With Grubbing Up Stumps, C) Demolition Works, D) Earthworks, E) Construction Of The Foundation, F) Construction Of A Surface Made Of Crushed Aggregate, G) Construction Of Roadsides ,H) Finishing Works,I) Reconstruction Of The Power Grid.4) In The Scope Of The Road Marked No. Vi:A) Preparatory Works On A Section With A Length Of 0.822 Km,B) Cutting Down Trees And Bushes Along With Grubbing Up Tree Trunks,C) Demolition Works,D) Earthworks,E) Construction Of The Foundation,F) Construction Of Mineral-Asphalt Surfaces,G) Construction Of Roadsides,H) Finishing Works,I) Road Marking.5) In The Scope Of The Road Marked No. Xxv:A) Preparatory Works On A Section With A Length Of 1.763 Km, B) Cutting Down Trees And Bushes Together With Grubbing Up Tree Trunks, C) Demolition Works, D) Drainage Of The Road Structure, E) Mechanical Leveling And Filling Of The Soil. 6) In The Scope Of Clearing Bushes, Liquidation Of Old Roads And Edges, Including: A) Measurement Works, B) Clearing Bushes, Trees And Stumps.3. A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation, Constituting Annex No. 8 To The Swz, Which Consists Of: 1) Construction Designs Or Road Designs, Including: A) Land Development Designs, B) Architectural And Construction Designs, C) Annexes To The Design Construction, D) Inventory Of Greenery Intended For Cutting Down, E) Technical Designs, F) Executive Designs For Removing Conflicts Or Securing The Telecommunications Network, G) Executive Designs For Removing Conflicts Or Securing The Power Grid, H) Road Designs (In The Scope Of Roads Subject To Mechanical Alignment) And Culvert Reconstruction Projects, I) Bush Removal Project, Elimination Of Old Roads And Balks, J) Exit Designs At Junctions To Public Roads, 2) Technical Specifications For The Execution And Acceptance Of Construction Works (Stwior), 3) Permanent Traffic Organization Projects, 4) Bills Of Quantities, 4. The Length Of The Quality Warranty Period For Completed Construction Works And Delivered And Incorporated Materials Is Min. 60 Months From The Date Of Final Acceptance Of Construction Works And Constitutes A Criterion For The Evaluation Of Offers. The Ordering Party Specifies It For A Period Ranging From 60 Months (Minimum Term) To 84 Months (Maximum Term). The Quality Guarantee Covered By The Offer Evaluation Criterion Does Not Cover The Following Minimum Warranty Periods: A) Thick-Layer Horizontal Markings, Markings With Tapes And Reflective Point Elements - The Guarantee Is 60 Months, B) Supporting Structure For Gate And Boom Road Signs - The Warranty Is Issued Individually For Each Supporting Structure. The Minimum Durability Period Of The Supporting Structure Is 10 Years, C) Posts For Vertical Warning, Prohibition, Order And Information Signs With Standard Dimensions And In The Case Of Elements Used To Attach Signs To Other Objects Or Structures, A Warranty May Be Issued For A Delivery Batch And Is 60 Months. The Ordering Party Does Not Require The Contractor To Submit The Said Evidence Along With The Offer.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
aee8c30f-2adb-42e1-8418-022a9d1dd1e4.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders