GTR 80136138
Tenders Are Invited For Reducing Electricity Consumption By Modernizing Outdoor Lighting In The Tarnowo Podgórne Commune - Replacing Luminaires With Led Ones
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
80136138
Tendering Authority
Subscribe to view
Tender No
WOP.271.17.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reducing Electricity Consumption By Modernizing Outdoor Lighting In The Tarnowo Podgórne Commune - Replacing Luminaires With Led Ones
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
14-05-2024
Closed
Work Detail
1. The Subject Of The Order Is To Reduce Electricity Consumption By Modernizing Outdoor Lighting In The Tarnowo Podgórne Commune, I.E. Replacing Road Luminaires Equipped With High-Pressure Lamps With Led Luminaires. The Subject Of The Order Consists Of: A. Preparation Of A Road Lighting Design Along With The Selection Of The Type Of Luminaires For 344 Pcs. Of Road Luminaires In Accordance With The Pn-En 13201:2016 Standard Or Equivalent And With The Lighting Class Indicated In Annex No. 2. Data For The Project Are Included In Annexes No. 4 And 5; B. Dismantling And Disposal Of 344 Road Lighting Fixtures With Discharge Light Sources In The Locations Indicated By The Ordering Party In Annex No. 2; C. Delivery And Installation Of 344 Pieces Of Road Lighting Fixtures In Led Technology Along With A Power Cable From The Cable Connector In The Pole To The Fixture In The Locations Indicated By The Ordering Party In Annex No. 2D. Delivery And Replacement Of 344 Pieces Of Complete, New Izk-Type Cable Connectors With A Fuse (Fuse) For The Installed Road Lighting Fixtures; E. Preparing As-Built Documentation, Including Updating Electrical Diagrams And Single-Line Diagrams Of Modernized Electrical Circuits, And Obtaining The Necessary Decisions And Permits, If Required.2. The Material Scope Of The Task Being The Subject Of The Contract Is Described In Detail In Annexes 2-5 And 7 To The Swz. 3. The Ordering Party Requires That The Subject Of The Order Be Covered By: - A Minimum 60-Month Warranty Period, - A Minimum 60-Month Warranty Period. If The Warranty Period Is Extended, The Warranty Period Is Simultaneously Extended By The Same Period4. The Contractor Must Indicate In Its Offer Which Elements Of The Order It Intends To Entrust To Subcontractors. 6. A Detailed Description Of The Parameters Of The New Led Luminaires Is Provided In Annex 3;7. The Contractor Will Use Materials With Technical, Construction And Operational Parameters Not Worse Than Those Specified In The Swz. The Indications Of The Origin Of The Products Used In The Order Documents Serve To Determine The Standards Of Technical And Quality Characteristics. The Contractor May Use The Indicated Or Equivalent Other Product That Meets The Technical And Quality Requirements And Has Functional Properties Not Worse Than Those Specified In The Ordering Partys Order Documents. A Contractor Who Relies On Equivalent Solutions Is Obliged To Demonstrate That The Supplies, Services Or Construction Works He Offers Meet The Requirements Specified By The Ordering Party. 8. The Contractor Will Use Technical Solutions That Guarantee Compliance With The Conditions Of The Strategic Investment Program Of The Ninth Edition Of Lighting Up Poland, Including, Among Others: Reducing Electricity Consumption By At Least 75% And Meeting The Road Lighting Parameters Indicated By The Ordering Party In Swz9. The Contractor, In Accordance With The Terms Of The I Light Up Poland Program, Is Obliged To Use New Luminaires Manufactured In The European Union To Complete The Subject Of The Order.10. The Contractors Obligation And Expense Also Includes: A) Carrying Out Measurements To Check The Compliance Of Lighting Parameters With The Design Requirements And Electrical Measurements To Check, Including, Among Others: Measurements Of The Effectiveness Of Protection Against Electric Shock, Measurements Of The Insulation Resistance Of Wires Between The Cable Connector In The Pole And The Led Fixture, B) Fees Related To The Disposal Of Lighting Fixtures, Cable Connectors, Cables And Wiresc) Repairs Of Roads And Streets Damaged During The Works By Means Of Transport And Machines Used For Works, As Well As By Persons Employed By The Contractor D) Costs Of Cutting Down Trees And Bushes, E) Compensation For The Destruction Of Crops And Greenery, F) Development And Implementation Of A Road Traffic Design For The Duration Of The Works, G) Making Arrangements With The Owner Of The Roads And Streets On Which Works Will Be Carried Out H) Fees Resulting From Section G)
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d7879ff2-c122-4d7e-90d6-c9d847aa67c9.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.