Consists Of But Not Limited To:This Work Will Consist Of Installing (Open Digging) 3 New Primary Loops And Transformers For A New Development. Work Will Consist Of Installing Approximately 7023 Linear Feet Of 2¿ Conduit. 1/0 Underground Primary Will Be Pulled Into The Conduit At Approximately The Same Linear Distance. There Will Be (4) Single Phase Junction Boxes Installed, One For Each Phase And A 4Th Single Phase Junction Box Will Be Installed For A Future Project. Single Phase Transformers And Concrete Pads Will Be Installed At 19 Locations. Each Transformer Will Need The Primary Cables Terminated With Elbows, (2) 3¿ Sweeps Installed Facing Out The Back Of The Building Transformers For Future Services, And (3) Driven Ground Rods With Grounding Assemblies Installed To Meet Ecg Grounding Spec. Approximately 400 Linear Feet Of 2¿ Conduit Will Be Installed From The Transformer To Close Proximity Of The (7) Garages And Stubbed Up For Future Use. Contractor Is To Backfill And Leave Site Back To Like Or Better.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.