One Drinking Water Package Booster Pump Station, 555 Gpm At 108.6 Feet Tdh Head, B. One Design-Build Pump Station Building, 390 Square Feet, C. 515 Ft. Of 8-Inch C900 Pvc, D. 355 Ft. 12-Inch C900 Pvc, E. Electrical, F. Civil Site Improvements, And G. Contractor Is Responsible For Pump Station Building Permits: Building, Electrical, Fire Marshal, Civil Site And Such Other Local Permits As Required. The Engineer¿S Opinion As To Estimated Project Cost Is $400,000. The Estimated Project Time Is 4 Months. Evaluation Of Proposals Will Be Made According To The Factors Contained In The Rfp Including A Weighted Scoring Of Cost, Qualifications, Value Engineering, Pipe Materials And Schedule. This Project Will Be Partly Funded Using Federal Funds And Comply With Federal Requirements Such As: Federally Assisted State Revolving Funds, American Iron And Steel, Bipartisan Infrastructure Law, Build America Buy America, Davis-Bacon Wages, And Disadvantage Business Enterprises Requirements.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.