GTR 79931807
Tenders Are Invited For Performing Investor Supervision Over The Task Titled: Reconstruction Of District Road No. 2939S In Poniszowice
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
79931807
Tendering Authority
Subscribe to view
Tender No
ZDP/DI/3421/10/2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Performing Investor Supervision Over The Task Titled: Reconstruction Of District Road No. 2939S In Poniszowice
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
08-05-2024
Closed
Work Detail
3. Description Of The Subject Of The Order 3.1. The Subject Of The Order Is To Provide Investor Supervision Over The Execution In Accordance With The Documentation, Bill Of Quantities (Annex No. 3 To The Swz) And With The Technical Specifications For The Execution And Acceptance Of Works On The Task Titled Reconstruction Of District Road No. 2939S Ul. Gliwicka In Poniszowice.3.2. The Construction Works Subject To Supervision Include The Reconstruction Of A Technical Class Z Road On A Section With A Length Of Approximately 1,328.5 M, Including The Construction Of A New Bituminous Surface, Construction Of A Sidewalk With A Length Of Approximately 1,035 M, Construction Of Roadsides With A Crushed Stone Surface, Construction And Reconstruction Drainage (Rainwater Drainage, Ditches) Along With The Reconstruction Of Existing Culverts. The District Road Will Be Drained Into The Reconstructed Or Newly Constructed Storm Sewage System And, In Sections, Into Reconstructed Roadside Ditches. As Part Of The Task, Existing Culverts And Culverts Under The Exits Will Be Rebuilt. A Technological Channel Will Also Be Constructed. The Designed Drainage Of The District Road Will Also Ensure The Collection Of Water Flowing To The Road From Adjacent Areas. Existing Intersections Will Be Rebuilt And The Curves Connecting The Road Edges Of The Included Minor Roads Will Be Corrected. The Bus Bay And Bus Stops With Shelters Will Also Be Rebuilt. The Beginning Of The Study Is Located At The Intersection With The Road To The Former State Agricultural Farm (Non-Public Road) To The Vicinity Of Property No. 1 (Connection With The Dirt Road). The Scope Of Work Includes, Among Others: A) Solutions For Improving Traffic Safety, Such As: - Construction Of Pedestrian Crossing Lighting - Retrofitting Pedestrian Crossings With An Intelligent Pedestrian Identification System - Using Traffic Calming Solutions In The Form Of Island Speed Bumps B) Correcting The Geometry Of Intersections (Or Their Reconstruction) And Other Elements Of The Road C) Construction/Reconstruction Of A One-Sided Sidewalk With A Length Of Approx. 1035.0 M, D) Drainage Of The Entire Section, Including The Adjacent Areas (Including Plot No. 1072/109 Covering The Catchment Area Of The Road Of Ul. Gwiazdacka, As Well As A Drainage Ditch Receiving Water From Existing Culverts From The District Road No. 2939S) E) Reconstruction Of Public And Individual Exits F) Renovation Of The Road Surface On The Section Covered By The Reconstruction G) Construction Of Roadsides With A Crushed Stone Surface H) Reconstruction Of Existing Culverts I) Construction Of Road Drainage Elements (Ditches, Culverts, Sewage System)J) Installation Of Road Traffic Safety Devicesk) Reconstruction Of The Bus Bay L) Reconstruction Of Conflicting Sections Of The Lv Electrical And Lighting Networksm) Construction Of A Technological Duct) Reconstruction Of Conflicting Sections Of Telecommunications Networks. The Task Will Be Implemented On The Basis Of A Permit For The Implementation Of A Road Investment - Decision No. 2/ 23 Of November 20, 2023 (Letter No. Wab.673.00008.2022) Characteristic Parameters Of Building Structures: • Reconstruction Of The Road With A Width Of 5.5 M To 5.8 M And A Length Of 1,328.5 M, • Construction And Reconstruction Of A Sidewalk With 2.0 M Wide And Approx. 1035.0 M Long With A Local Narrowing To 1.25 M • Construction Of Traffic Calming Elements In The Form Of Speed Bumps Made Of Ready-Made Elements Made Of Pvc, • Construction Of A Road Surface At Parkowa Street Made Of Cobblestones Paving,• Reconstruction Of Individual And Public Exits And Intersections With Other Roads,• Reconstruction/Construction Of Storm Sewage Sections;• Designation Of A 4.0 M Wide Pedestrian Crossing With The Construction Of Lighting For This Crossing,• Reconstruction Of The Bus Bay With Replacement Of The Surface,• Reconstruction Of The Lv Power Grid And Telecommunications Network. Due To The Planned Scope Of Works, It Is Necessary To Cut Down 7 Inventoried Trees. The Provisions Of The Nature Protection Act Regarding The Obligation To Obtain A Permit For Their Removal Do Not Apply To The Removal Of Trees Located In The Area Covered By The Zrid Decision. Removal And Related Fees - Act Of July 25, 2008 Amending The Act On Special Rules For The Preparation And Implementation Of Investments In The Field Of Public Roads And Amending Acts (Journal Of Laws U. No. 154 Item 958). The Contractor Will Be Responsible For: • Cutting The Felled Tree Into 30 Cm Long Blocks And Transporting It To The Road Circuit In Pyskowice, Ul. Toszecka 52 • Measuring, Classifying And Pricing The Obtained Wood Raw Material By An Authorized Appraiser Or Classifier. Existing Vertical Markings And Built-In Barriers Energy-Consuming Elements In The Section Covered By The Works Are The Property Of The Employer And Will Be Dismantled By Him Within The Time Agreed With The Contractor Of Construction Works. During The Works, Residents Should Be Able To Access And Access The Property As Well As Access To And Access To Business Facilities And Public Utility Facilities. The Work Site Should Be Marked In Accordance With Applicable Regulations Based On The Approved Traffic Management Design. Preparing The Traffic Management Design And Obtaining Its Approval, As Well As Installing The Signs, Is The Responsibility Of The Construction Contractor. The Method Of Carrying Out Works Within Access Roads To Facilities Where Business Activities Are Conducted And Public Utility Facilities Should Be Agreed Between The Contractor Of Construction Works And The Owners Of The Given Properties. The Employer Recommends That The Works Be Carried Out With Half Of The Road Occupied. In The Event Of Works Being Carried Out With The Road Completely Closed, All Costs Related To Diverting The Traffic Of Public Transport Vehicles Through Diversion Roads, In Particular The Claims Of Carriers Performing Public Passenger Transport, Remain With The Construction Works Contractor (Concerning Ztm Letter No. Op.4174.4.90.2022.Pk.3 Of April 26, 2022). 3.3. The Main Scope Of Construction Works, The Method Of Their Execution And The Quality Requirements For The Main Elements Constituting The Subject Of The Order Were Specified In The Technical Documentation, Bill Of Quantities And Stwiorb Constituting Annex No. 3 To Swz.5. Performing The Function Of A Supervision Inspector Will Concern The Investment Implementation Stage And The Stage After Its Completion - During The Warranty Period Valid For A Maximum Of 72 Months From The Date Of Final Acceptance Of The Construction Works Subject To Supervision Under This Order.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
b891a550-961b-4358-b7dc-f93ea6eef6c0.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.