Construction Work For Highways, Roads – N28 As Mezzaselva - As Klosters West, Belagsarbeiten. The N28 Prätttigauerstrasse On The Section From The Mezzaselva Roundabout To As Klosters West Is In Poor Condition. The Surface Has Cracks And There Are Ruts. The Road Surface In The Büel Underpass, Which Is Covered With A Cold Micro Surface, Also Has Ruts And Potholes. Work: Milling Off The Entire Length Of The Top Layer And Installing A Leveling Layer (Sami) And A New Top Layer. On An Additional 40% Of The Road Surface, The Binder Layer Should Also Be Milled Away And Reinstalled In The Area Of The Existing Cracks In The Pavement. Quantity: Milling Of Pavement Approx. 11100 M² Installation Of Sami 1 Cm Approx. 8100 M² Rolled Asphalt Ac B 22H Approx. 560 T Rolled Asphalt Ac Mr 8 Approx. 820 T
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.