Hydro-Electric Plant Construction Work – Renovation Of The Pressure Shaft At Handeck 1 Power Plant - Construction Work. The Tendered Construction Work Mainly Includes The Following Objects: - Various Installations - Various Demolitions Of Existing Reinforced Concrete Structures And Steel Parts/Armoring/Distribution Lines - Excavation, Securing And Cladding Access Tunnels: Length Approx. 575 M, Excavation Cross Section Approx. 20.8 - 27 M2 - Excavation, Securing And Cladding Of The Access Cavern: Excavation Volume Approx. 3000 M3 - Excavation And Securing Vertical Access Shaft: Depth Approx. 17 M, Excavation Area Approx. 47.5 - 85 M2 - Excavation And Securing Tunnels From The Access Shaft Towards The Valve Chamber Kw Handeck 1: Length Approx. 14 - 16 M2 - Removal Of Excavated Material And Installation In The Griwald Landfill - Back-Concreting Of Steel Armor The Exact Details Can Be Found In The Tender Documents.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.