Bids Are Invited For Tnd0023664 - Hwy. 3:09 Cold Milling, Asphalt Concrete Pavement (Acp) And Other Work. Hwy 3 &Hwy 4/43 St. (Int. 4131) Grading, Granular Base Course (Gbc), Cold Milling, Asphalt Concrete Pavement (Acp), Portland Cement Concrete Pavement, Upgrade Of Traffic Signals, Electrical & Control Systems Upgrades, Street Light Installation And Other Work

Tender Detail

79806607
TND0023664
Self-Funded
Bids Are Invited For Tnd0023664 - Hwy. 3:09 Cold Milling, Asphalt Concrete Pavement (Acp) And Other Work. Hwy 3 &Hwy 4/43 St. (Int. 4131) Grading, Granular Base Course (Gbc), Cold Milling, Asphalt Concrete Pavement (Acp), Portland Cement Concrete Pavement, Upgrade Of Traffic Signals, Electrical & Control Systems Upgrades, Street Light Installation And Other Work
ICB
Northern America
Asia-Pacific Economic Cooperation, APEC,G20,APAC (Asia Pacific)
28-05-2024

Work Detail

Tnd0023664 - Hwy. 3:09 Cold Milling, Asphalt Concrete Pavement (Acp) And Other Work. Hwy 3 &Hwy 4/43 St. (Int. 4131) Grading, Granular Base Course (Gbc), Cold Milling, Asphalt Concrete Pavement (Acp), Portland Cement Concrete Pavement, Upgrade Of Traffic Signals, Electrical & Control Systems Upgrades, Street Light Installation And Other Work . Tender Available Date: Friday, April 26, 2024. Tender Closing Date: Tuesday, May 28, 2024. Project Inquiries: Ikhtiyar Mammadov, Project Procurement Officer, Alberta Transportation And Economic Corridors. E-Mail: Ikhtiyar.Mammadov@Gov.Ab.Ca. Tenders Will Only Be Received By Email At Trans.Tender@Gov.Ab.Ca, Before 2:01:00 P.M., For Construction Of The Following Work: Tnd0023664 Cold Milling, Asphalt Concrete Pavement (Acp) And Other Work 3:09 East Of Hwy. 25 To Hwy. 4:07 / 43 Street Kilometre 1.120 To 8.120 (Ebl) 3:09 East Of Hwy. 25 To Hwy. 4:07 / 43 Street Kilometre 1.020 To 8.120 (Wbl) Grading, Granular Base Course (Gbc), Cold Milling, Asphalt Concrete Pavement (Acp), Portland Cement Concrete Pavement, Upgrade Of Traffic Signals, Electrical And Control Systems Upgrades, Street Light Installation And Other Work 3:09 To 10 Intersection Improvement (Int. 4131) Jct. Of Hwy. 3:09 & Hwy. 4:07 Kilometre 8.120 To 8.745 (Ebl) Kilometre 8.120 To 8.745 (Wbl) Kilometre 0.000 To 0.110 (Ebl) Kilometre 0.000 To 0.440 (Wbl) 4:07 Intersection Improvement (Int. 4131) Jct. Of Hwy. 3:09 & Hwy. 4:07 Kilometre 4.840 To 5.210 (Nbl) Kilometre 5.145 To 5.210 (Sbl) Southern Region Approximate Quantities: Schedule A: Highway 3:09 Ebl/Wbl & Wb Stafford Dr. Off-Ramp 1 Lump Sum Traffic Accommodation 2,225 Cubic Metre Subgrade Excavation 6,770 Square Metre Preparing Granular Surface 1,260 Tonne Granular Base Course Des. 2 Class 25 260 Metre Curb And Gutter (500Mm Gutter) 3,640 Square Metre Topsoil - Supply And Place 233,920 Square Metre Cold Milling Asphalt Pavement - 50 Mm Depth 81,690 Square Metre Cold Milling Asphalt Pavement - 80 Mm Depth 9,530 Square Metre Cold Milling Asphalt Pavement - 200 Mm Depth 50,040 Tonne Asphalt Concrete Pavement - Superpave - Mix Type 100-F-12.5 (Pg 70-28) 51,300 Tonne Supply Of Aggregate - With Option 3,340 Metre Remove And Dispose Of Existing Guardrail 1,940 Metre Remove, Salvage, And Reinstall Strong Post W-Beam Guardrail (Rail Only) 3,604 Metre Strong Post W-Beam Guardrail - Supply And Install 27 Unit Impact Attenuator (Nchrp 350/Mash 2009 Tl-3) - Supply And Install 14.23 Kilometre Durable Inlaid Roadway Lines - White Lane Dividing Lines (100 Mm Thick) 7.72 Kilometre Durable Inlaid Roadway Lines - White Edge / Shoulder Lines (100 Mm Thick) 7.93 Kilometre Durable Inlaid Roadway Lines - White Edge / Shoulder Lines (200 Mm Thick) 45 Message Durable Inlaid Pavement Message - Stop Bar 23 Message Durable Inlaid Pavement Message – Crosswalk Line 29 Message Durable Inlaid Pavement Message - Gore Area Schedule B: Intersection 4131 (Hwy 3 & Hwy 4/43 St) Improvements 920 Square Metre Concrete Surface - Remove And Dispose 6,200 Cubic Metre Subgrade Excavation 10,660 Square Metre Preparing Granular Surface 11,420 Tonne Granular Base Course Des. 2 Class 25 960 Metre Curb And Gutter (500Mm Gutter) 4,900 Square Metre Solid Concrete Medians 270 Square Metre Truck Apron (Portland Cement Concrete Pavement) - Supply And Place 15,050 Square Metre Cold Milling Asphalt Pavement - 200 Mm Depth 10,030 Tonne Asphalt Concrete Pavement - Superpave - Mix Type 100-F-12.5 (Pg 70-28) 2,270 Tonne Asphalt Concrete Pavement - Superpave - Mix Type 100-F-20 (Pg 70-28) 504 Square Metre Portland Cement Concrete Pavement - Eps 1 Lump Sum Temporary Traffic Signals 1 Lump Sum Traffic Signal System - Supply And Install Contractor To Supply All Materials. Contract Completion Date: October 15, 2024.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail