GTR 79800073

Tenders Are Invited For Reconstruction And Renovation Of Residential Premises At Ul. Opolska 26A/6 And 26B/3 In Tarnowskie Góry For The Needs Of Sheltered/Training Apartments

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
79800073
Tendering Authority
Subscribe to view
Tender No
AZ.272.4.4.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction And Renovation Of Residential Premises At Ul. Opolska 26A/6 And 26B/3 In Tarnowskie Góry For The Needs Of Sheltered/Training Apartments
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
17-05-2024 Closed
Work Detail
1. The Project Is Implemented With Financial Support From The Subsidies Fund Under Agreement No. Bsk/23/24/0003005 Concluded With Bank Gospodarstwa Krajowego.2. Building At Ul. Opolska 26A In Tarnowskie Góry Is Entered In The Register Of Monuments Of The Silesian Voivodeship Under No. A/388/12 Of. 19/11/2012 3. The Scope Of The Order Includes: Part A: Reconstruction Of The Residential Premises At Ul. Opolska 26A/6 For The Needs Of A Sheltered/Training Apartment Along With Its General Renovation, Including The Reconstruction Of Internal Installations. In Part A, The Scope Of The Order Includes: - Change Of The Room Layout, - Demolition Of The Partition Wall, - Demolition Of A Hole In The Wall For The Passage To The Designed Kitchen, - Demolition Of Existing Door Joinery, - Demolition Of Floors, - Demolition Of Existing Cladding, - Demolition Of Existing Internal Heating, Gas, Water, Sanitary Sewage (Without Interfering With The Buildings Verticals), Electrical Installations (The Entire Scope Provided For In The Project, Including The Construction Of A New Electrical Switchboard On Corridor With Installation), - Making A Ceiling From Plasterboards In The Bathroom, - Making Plasterboard Partition Walls, - Dismantling Plaster On Parts Of The Walls, - Replacing Osb Boards On The Floors And Making New Floors, - Painting The Walls, - Making Ceramic Wall Coverings ,- Execution Of Electrical Installations, Central Heating, Sanitary Sewage, Water, Gas,- Execution Of White Installation,- Execution Of Lighting,- Execution Of The Scope Of Works Provided For In The Conditions Of Connecting Residential Premises To The Network.4. The Detailed Scope Of The Subject Of The Order, Description Of The Employers Requirements In The Scope Of Implementation And Acceptance For Part A Are Specified In The Following Documents: 1) Land Development Design, Architectural And Construction Design, Executive Design - Residential Premises At Ul. Opolska 26A/6 - Annex No. 5A To Swz, 2) Technical Design - Residential Premises At Ul. Opolska 26A/6 - Annex No. 5B To Swz,3) Bill Of Quantities. - Residential Premises At Ul. Opolska 26A/6 - Construction Industry - Annex No. 6A To Swz, 4) Bill Of Quantities. - Residential Premises At Ul. Opolska 26A/6 - Sanitary Industry - Annex No. 6B To Swz, 5) Bill Of Quantities. - Residential Premises At Ul. Opolska 26A/6 - Electrical Industry - Annex No. 6C To Swz, 6) Stwior - Residential Premises At Ul. Opolska 26A/6 - Construction Industry - Annex No. 7A To Swz,7) Stwior - Residential Premises At Ul. Opolska 26A/6 - Sanitary Industry - Annex No. 7B To Swz,8) Stwior - Residential Premises At Ul. Opolska 26A/6 - Electrical Industry - Annex No. 7C To Swz,9) Decision No. 26/23 Of January 11, 2023. Regarding The Reconstruction And Renovation Of An Apartment At Ul. Opolska 26A - Annex No. 8 To Swz,10) Permit Of The Silesian Provincial Conservator Of Monuments No. K/1533/2022 Of December 20, 2022 For A Residential Premises At Ul. Opolska 26A - Annex No. 9 To Swz, 11) Connection Conditions For A Residential Premises At Ul. Opolska 26A/6 No. Wp/033909/2024/O11r08 Of April 4, 2024. – Annex No. 10 To Swz.12) Draft Provisions Of The Contract - Annex No. 4 To Swz.5. The Required Guarantee And Warranty Period For The Completed Subject Of The Contract Is At Least 3 Years (In Words: Three Years), Counting From The Date Of Signing The Fault-Free Final Acceptance Protocol Of The Works By The Ordering Party, The Investors Supervision Inspector And The Contractor, With The Exception Of Guarantees For Devices Covered By Manufacturers Factory Guarantees. Which Should Be At Least 2 Years. Guarantees For Devices Granted By The Manufacturer Will Be Counted From The Date Signed By The Ordering Party, The Investors Supervision Inspector And The Contractor Of The Fault-Free Final Acceptance Report Of The Works.6. The Ordering Party Requires The Employment Of The Contractor Or Subcontractor Under An Employment Contract Within The Meaning Of The Provisions Of The Act Of June 26, 1974, Labor Code (I.E. Journal Of Laws Of 2023, Item 1465, As Amended) In The Scope Of The Execution Of The Order Of Persons Performing Activities Included In The So-Called Direct Costs. Therefore, This Requirement Applies To People Who Perform Activities Directly Related To The Performance Of Works, I.E. The So-Called Manual Workers. The Requirement Does Not Apply To, Among Others, Persons: Managing Construction Or Works, Providing Surveying Services, Suppliers Of Construction Materials.7. Where A Trademark (Brand), Manufacturer, Supplier, Patent, Origin, Source Or Specific Process That Characterizes The Products Or Services Provided By A Specific Contractor Or Standards, European Technical Assessments, Common Technical Specifications Or Other References Referred To In Art. 101 Section 1 Point 2 Or Section 3 Of The Act, The Ordering Party In Accordance With Art. 99 Section 5 Of The Act Allows The Submission Of An Equivalent Offer Or In Accordance With Art. 101 Section 4 Of The Act, Offering Solutions Equivalent To Those Indicated In The Documentation, Provided That They Ensure Technical Parameters Not Worse Than Those Assumed In The Documentation And Are Consistent In Terms Of: 1) Dimensions And Construction (Size, Type, Physical Properties, Number Of Components) ,2) Functional Character (Identity Of Functions),3) Material Characteristics (Type And Quality Of Materials),4) Technical Parameters (Strength, Durability, Technical Data, Hydraulic Data, Linear Characteristics, Design),5) Safety Parameters Of Use,6) Emission Standards.8. The Contractor, At Each Request Of The Ordering Party, Is Obliged To Present Safety Signs For The Indicated Materials, A Declaration Of Conformity Or Technical Approval Or A Certificate Of Compliance With The Polish Standard Transposing European Standards Or Equivalent Or The Standard Of The Member States Of The European Economic Area Transposing This Standard Or Equivalent Or The Polish Standard Or Equivalent In The Absence Of A Polish Standard Transferring European Ones.9. Whenever Polish Standards Are Mentioned In The Construction Design, Detailed Design, Technical Specification For The Execution And Acceptance Of Works, And Bills Of Quantities, It Should Be Understood As Polish Standards Translating European Or Equivalent Standards Or Standards Of Other Member States Of The European Economic Area Or Equivalent Or Other Standards Or Documents, Referred To In Art. 101 Section 1 Point 2 Of The Act.10. The Materials, Equipment And Devices Used To Perform The Contract Should Meet The Quality Requirements For Products Approved For Trading And Use In Construction Specified In The Act Of July 7, 1994, Construction Law (Consolidated Text: Journal Of Laws Of 2023, Item 682, As Amended). As Amended), The Act Of April 16, 2004 On Construction Products (Consolidated Text: Journal Of Laws Of 2021, Item 1213) And The Requirements Of The Technical Specification For The Execution And Acceptance Of Works And Swz.11. Before Installing The Materials, The Contractor Will Submit Their Patterns And Technical Cards For Approval To The Supervisory Inspector And The Ordering Party, Confirming Compliance Of The Technical Parameters With The Construction And Executive Design.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
8a2075eb-f11d-4ea1-a88e-4f6ac78c002f.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders