GTR 79800013
Tenders Are Invited For Reconstruction Of The Municipal Road - Ul. Ogrodowa In Tuszyn, On Plots No. 358, 383, Precinct 11, Commune. Tuszyn
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
79800013
Tendering Authority
Subscribe to view
Tender No
ZP.2710.6.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of The Municipal Road - Ul. Ogrodowa In Tuszyn, On Plots No. 358, 383, Precinct 11, Commune. Tuszyn
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
16-05-2024
Closed
Work Detail
1. The Subject Of The Order Is The Execution Of An Investment Task Called: Reconstruction Of A Municipal Road - Ul. Ogrodowa In Tuszyn, On Plots No. 358, 383, Precinct 11, Commune. Tuszyn. The Investment Task Is Co-Financed By The Government Road Development Fund In 2024.2. Scope Of The Order. The Task Includes The Construction Of A Pedestrian And Road Surface With A Length Of L = 151.83 M In Ul. Ogrodowa In Tuszyn With Exits To The Properties. The Designed Pedestrian And Roadway Begins At The Edge Of The Street. Strazacka, And Ends At The Border With Plot No. 89. The Road Elements Should Be Made Of Gray Concrete Cubes - 8 Cm Thick, 1:4 Cement-Sand Ballast - 4 Cm Thick, Crushed Aggregate Fraction 0/31.5 Mm - 20 Cm Thick , Sand Stabilized With Rm 2.5Mpa Cement - Thickness 15 Cm. Slopes - Should Be Made Of Gray Concrete Cubes - Thickness 8 Cm, Cement-Sand Ballast 1:4 - Thickness 4 Cm, Crushed Aggregate Fraction 0/31.5 Mm - Thickness 20 Cm, Sand Stabilized With Rm 2.5Mpa Cement - Thickness 15 Cm .3. The Order Should Also Include: - Securing The Technical Infrastructure: (Energy Network, Existing Telecommunications Connection, - Replacement And Height Adjustment Of Box Covers For Valves And Hydrants Of The Water Supply Network, - Height Adjustment Of Gas Network Boxes Under The Supervision Of The Box Owner. 4. Detailed Description Of The Subject The Order Was Described In The Design Documentation, Stwiorb And The Bill Of Quantities. The Order Is Carried Out On The Basis Of The Certificate Of No Objection To The Intention To Perform Construction Works Of December 21, 2018, Reference Number Bign.6743.285.Zp.2018.A.S.5 Take Into Account The Activities And Works Listed Below, As Well As The Related Costs: 1) Carrying Out All Necessary Preparatory, Accompanying And Securing Works Necessary To Perform The Task And Resulting From The Scope Of The Order. 2) The Contractor Is Obliged To Ensure That The Works Covered By This Order Are Performed And Managed By Persons Having Appropriate Professional Qualifications And Construction Licenses.3) After The Protocol Takeover Of The Construction Site From The Ordering Party, The Contractor Is, Until The Moment Of The Final Acceptance Protocol, Liable Towards Third Parties And The Ordering Party For The Transferred Construction Site And For Any Damage Occurring In This Area And The Subject Of The Order.4 ) Compliance With Safety, Occupational Health And Safety, Fire Protection Rules5) Full Construction Site Surveying Services, I.E. Staking And As-Built Surveying Inventory Of The Investment Registered In The District Center For Geodetic And Cartographic Documentation In Łódź - In 3 Copies6) Preparation And Submission Of As-Built Construction Documentation To The Ordering Party - In 2 Copies In Paper Form.7) Preparation Of The Construction Site, Including The Delivery Of All Required Utilities, Access Roads And Footbridges For Passages And Passages To The Construction Site And The Construction Site. All Fees For Used Utilities Are Borne By The Contractor.8) Construction Of Passages And Access Roads To The Property Ensuring Collision-Free Access To The Facilities Used.9) Obtaining, At Its Own Expense, All Administrative Decisions, Certificates, Declarations, Arrangements Or Other Documents Necessary To Carry Out The Works Required By Applicable Law. Construction And Handing Over The Facility For Use Along With Related Costs. 10) Removal Of Possible Collisions With Existing Underground And Above-Ground Utilities To The Extent Necessary For The Proper Performance Of The Task. 11) Incurring Fees And Compensation For Damage Caused In Connection With The Implementation Of The Task. 12) Restoration Of The Site And Construction Facilities To The State At Least Before The Commencement Of The Works. 13) Signage Construction Site In A Manner Consistent With The Provisions Of The Construction Law. 14) The Contractor Is Responsible For The Proper Management Of Waste Generated In Connection With The Performance Of The Subject Of The Order And In Accordance With Legal Regulations. He Is Obliged To Comply With The Provisions Of The Environmental Protection Law And The Waste Act. The Costs Related To The Transport And Management Of Waste Resulting From Demolition, Construction And Assembly Works Are Borne Entirely By The Contractor.15) The Contractor Is Obliged To Provide The Necessary Documents Confirming The Technical Parameters And Required Standards Of The Materials And Devices Used, Including E.G. Results And Test Protocols, Reports And Tests Related To The Subject Of This Order.16) The Contractor Undertakes To Inform The Ordering Party In Writing, Through The Investors Supervision Inspector: A/ About The Need To Perform Additional Or Replacement Works, For This Occasion A Necessity Report Will Be Prepared Specifying The Scope Of The Works And Their Value (According To The Rates Prices From The Offer Cost Estimate), B/ About Threats That May Have A Negative Impact On The Investment Implementation, Quality Of Works, Delay Of The Planned Date Of Completion Of The Works, And To Cooperate With The Ordering Party In Developing Measures To Prevent Threats.17) The Contractor Will Allow The Authoritys Employees To Enter The Construction Site Construction Supervision And Employees Of Units Performing Control Functions And Authorized Representatives Of The Ordering Party.18) The Contractor Undertakes To Inspect Documents Related To The Implementation Of This Order And To Undergo Field Visits At The Place Of Task Implementation And At Its Headquarters, Conducted By Authorized Representatives Of Control Bodies, Both Before The Commencement Of Implementation Investment, During Its Implementation And For A Period Of 5 Years From The Last Payment.19) The Contractor Is Obliged To Know And Apply All Regulations Regarding Environmental Protection And Work Safety While Carrying Out The Works. Fees And Penalties For Exceeding The Standards Specified In The Relevant Regulations Regarding Environmental Protection And Occupational Safety During The Works Are Borne By The Contractor.20) The Contractor Is Obliged To Notify The Water Supply And Sewerage Plant In Tuszyn, Ul. Brzezińska 86A, 7 Days Before The Commencement Of Construction Works, The Date Of Their Commencement And, Together With The Representative Of Zwik In Tuszyn, Reviewing The Condition Of The Existing Infrastructure.21) Implementation Of All Recommendations Resulting From The Documents Agreeing On The Design Documentation.22) Preparation Of A Bioz Plan.23) Reporting The Completion Of Construction Works To The Competent Construction Supervision Authority (If Necessary).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
864bb538-f75f-4f7b-beb0-783e05b810ef.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.