Tenders Are Invited For Creation Of A Rest And Recreation Center For The Inhabitants Of The Village Of Księżpol

Tender Detail

79799966
BGK.271.1.3.2024
Self-Funded
Tenders Are Invited For Creation Of A Rest And Recreation Center For The Inhabitants Of The Village Of Księżpol
ICB
central europe
European Union
10-05-2024

Work Detail

1. The Subject Of The Order Is The Construction Of A Rest And Recreation Center For The Inhabitants Of The Village Of Księżpol, Consisting In The Development Of The Area In Front Of The Gok Building In Księżpol By The Construction Of Small Architectural Objects And The Construction Of A Service And Recreation Building With Infrastructure. The Scope Of The Task Includes: 1) Construction Of A Service And Recreation Building With A Common Space In Front Of The Building Intended For Integration Purposes.A) Building Length - 16.73 M;B) Building Width - 7.93 M;C) Building Height - 4.42 M;D) Volume - 563.97 M3;E) Building Area - 132.67 M2;F) Number Of Floors - 1G) Type Of Building - Public Utility, Recreational Services;H) Construction Of Connections Powering The Building And Internal Installations Of The Building;I) Development Of The Area In Front Of The Building For Integration Purposes2) Construction Of An Earth Fountain (Water And Light) With Sculptures Depicting Swallows. A Fountain With An Underground Technical Chamber And Technological Development Of The Area. Sculptures With Night Lighting.A) Floor Fountain In The Form Of Constant, Vertical Water Jets Illuminated With Light Of Variable Rgb+W Color, Placed In Nozzles;B) Water Jet At A Height Of Approx. 1.5-2 M;C) Number Of Nozzles - 2 X 6 Pcs., 2 Basins Located In Parallel; D) Reinforced Concrete Basins Covered With Granite Slabs The Same As In The Entire Square; E) Basins And A Technical Chamber With Underground Technical Infrastructure; F) Bronze Sculptures Of Swallows - 3 Pcs.; G) Lighting The Sculpture From Below With Ground Luminaires Independent Of The Fountain Lighting. 3) Construction Of Hardened Pedestrian And Road Routes Adapted To The Planned Spatial Layout And Emphasizing The Designed Composition Lines. Roadway With The Planned Public Exit. A) Sidewalk Made Of Paving Stones And Granite Slabs; B) Construction Of Field Stairs With Concrete Steps And Palisades, Respectively, And Granite Steps And Palisades At The Descent To The Street. Przemysłowa;C) Construction Of Hot-Dip Galvanized, Powder-Coated Steel Balustrades;D) Access Road To The Building Made Of Concrete Cubes;E) Back Yard Of The Building Paved With A Geogrid Filled With Grass;F) Construction Of A New Public Exit From The Municipal Road Ul. Przemysłowa.4) Reconstruction Of The Existing And Construction Of New Area Infrastructure, Including A) Water Supply, Sanitary Sewage System, Storm Sewage System With A Rainwater Tank For Reuse; B) Construction Of Area Lighting And Architectural Facilities; C) Power Supply For The Service Building And A Fountain; D) Supply Of Power Consumption Points For The Duration Of Outdoor Events; E) Removal Of Conflicts With Land Utilities; F) Photovoltaic Installation On The Roof Of The Building. 5) Arrangement Of Installation Elements Of Small Architecture, Benches, Waste Bins And Others In The New System In Accordance With The Design Study And Indication Ordering Party. 6) Terrain And Greenery Layout. Ensuring Standard Slopes On Communication Routes, With The Collection And Transfer Of Excess Surface To Places Requiring Elevation. No Interference With The Existing Tree Stand Is Expected. Introduction Of Park Greenery, Pergolas With Climbing Plants. 7) Surveying Services - Post-Construction Inventory. 8) The Detailed Scope Of Work (Description Of The Subject Of The Order) Is Included In The Technical Documentation And Bills Of Quantities Supplementing The Documentation Constituting Annexes To The Swz. When Calculating The Offer Price, The Contractor Should Take Into Account All Requirements And Conditions Required For The Proper Performance Of The Subject Of The Order;9) As Part Of The Order, The Contractor Is Also Obliged To: A) Organize And Manage The Construction Facilities; B) Ensuring Ongoing Geodetic Services By Authorized Geodetic Services, Preparing As-Built Documentation, Including Geodetic Documentation (Post-Construction Inventory) Of All Works, Approved By The Office Of Geodesy And Cartography Appropriate To The Location Of The Works; C) Developing A Safety And Health Protection Plan, Provided That Is Required; D) Marking Of The Construction Site; E) In The Event Of Damage Or Destruction During Works - Repairing Them And Restoring Them To Their Original Condition; F) Ensuring Supervision As Well As Appropriate Occupational Health And Safety Conditions; G) Keeping The Construction Site Free From Traffic Obstacles And Removing Unnecessary Materials, Waste And Garbage On An Ongoing Basis; H) Providing A Warranty For Physical And Legal Defects And A Quality Guarantee For The Completed Construction Works And Built-In Devices For A Period Of Min. 36 Months, Counting From The Day Following The Final Acceptance Of The Task (Regardless Of The Guarantees Issued By Device Manufacturers); I) Participating In Warranty Inspections Requested By The Ordering Party (During The Period Covered By The Guarantee/Warranty); J) After The Completion Of The Works, The Construction Site Must Be Brought To The Condition Primary, Dismantle Temporary Structures, Tidy Up The Area And Hand It Over To The Ordering Party No Later Than The Date Of Final Acceptance.2. Equivalent Solutions.1) When Used In Swz Or Annexes, I.E. Wherever In The Design Documentation And Other Documents For The Execution Of The Order And Acceptance Of Construction Works In Relation To The Standards Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Public Procurement Act, The Contracting Authority Allows Solutions Equivalent To Those Described And Such Reference Is Accompanied By The Words Or Equivalent.2) If Trademarks Are Used In The Swz Or Annexes, It Means That They Are Given As Examples And Specify Only The Minimum Expected Quality Parameters And The Required Standard And Aims To Clarify The Level Of The Ordering Partys Expectations In Relation To A Specific Solution. When Describing The Subject Of The Order, The Ordering Party, When Indicating A Specific Marking Or A Specific Product, Allows Equivalent Products With Quality Parameters And Functional Features At Least At The Level Of The Parameters Of The Indicated Product, Thus Accepting Every Product With The Indicated Parameters Or Better. The Contractor May Use Equivalent Materials Or Devices, But With Technical And Quality Parameters Equal To Those Of The Indicated Product Or Better, The Use Of Which Will In No Way Adversely Affect The Proper Functioning Of The Solutions Adopted In The Design Documentation. Before Construction, The Materials And Devices Will Be Presented To The Ordering Party For Acceptance, Specifying Equivalence.3) Wherever The Subject Of The Order Is Described By Indicating Trademarks, Origin, Source Or Specific Process That Characterizes The Products, Materials, Devices Or Solutions Or A Reference To European Standards Technical Assessments, Approvals, Other Documents, The Ordering Party Allows The Contractor To Use Products, Materials, Devices Or Solutions Equivalent To Those Described In The Design Documentation Or Technical Specification, Provided That They Have At Least The Same Or Better Technical And Functional Parameters And Do Not Reduce Standards Specified In The Design Documentation And Will Have The Required Appropriate Approvals, Certificates Or Approvals For Use And Will Ensure The Execution Of The Order In Accordance With The Ordering Partys Requirements Specified In The Design And Swz. Materials And Devices Will Be Presented To The Ordering Party For Approval Before Construction, Specifying Equivalence.3. Determining The Requirements Regarding The Employment Of Persons By The Contractor Or Subcontractor On The Basis Of An Employment Relationship. 1) The Ordering Party Requires The Contractor And Subcontractor To Employ, On The Basis Of An Employment Relationship, Persons Performing The Activities Specified By The Ordering Party In The Scope Of Contract Execution, If The Performance Of These Activities Involves Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code (Consolidated Text: Journal Of Laws Of 2020, Item 1320, As Amended) The Activities Indicated Below In The Scope Of: A) Performing Any Earthworks; B) Performing Any Works Assembly And Electrical; C) Performing Works In The Field Of Reconstruction Of The Existing And Construction Of New Infrastructure; D) Performing Works In The Field Of Land Development And Fountains; E) Making Surfaces, Strips; F) Operating Machines, Devices And Construction Equipment; G) Finishing Works; H) Transport;I) Other Work Performed Physically As Well As With The Use Of Machines And Construction Equipment Not Listed Above.2) Method Of Verifying The Employment Of Persons And The Contracting Authoritys Rights To Control The Contractors Compliance With The Requirements Related To The Employment Of These Persons And Sanctions For Failure To Meet These Requirements Were Specified In The Contract Template Constituting Annex No. 9 To The Swz.3) The Ordering Party Does Not Specify Other Employment Requirements Referred To In Art. 96 Section 2 Point 2 Of The Public Procurement Law. 4. The Ordering Party Does Not Envisage Carrying Out An On-Site Visit And The Contractors Checking Of Documents Necessary To Complete The Order, Available On-Site At The Ordering Party.5. Pursuant To Art. 100 Paragraph 1. The Employer Requires The Contractor To Take Into Account Accessibility For All Users During The Implementation Of The Works, Including Accessibility Requirements For Disabled People In Accordance With The Design Documentation.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail