GTR 79799888
Tenders Are Invited For Improving Water And Sewage Services In The Płońsk Commune - Improvement Of Station Efficiency
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
79799888
Tendering Authority
Subscribe to view
Tender No
RGP.271.1.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Improving Water And Sewage Services In The Płońsk Commune - Improvement Of Station Efficiency
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
13-05-2024
Closed
Work Detail
Task Descriptionthe Subject Of The Planned Investment Is The Reconstruction Of The Water Treatment Plant, Located On The Plot No. 71/1 In The Town Of Cholewy, Supplying Water To The Inhabitants Of Part Of The Płońsk Commune. Scope Of Works: - Foundation Works Of Expansion Tanks - Installation Of Expansion Tanks With Connection Pipelines And Control Cables - Suction Pipeline Of The Tank Made Of Pe Pipes - Drain Pipelines Of The Tanks Made Of Pe Pipes - Control Cables For Expansion Tanks - Construction Of A New Fence - Dismantling Of The Existing Suw Devices - Raw Water Node - Inflow From The St-1 And St-2 Wells - Installation Of Pressure Filters (Iron Removers, Manganese Removers) - Installation Of A Water Aeration System - Installation Of An Air Filter Rinsing System - Installation Of A Water Filter Rinsing System - Installation Of A Water Disinfection System - Second Stage Pumping Station - Installation Of A Measuring System And Installation For The External Network - Internal Sanitary Installation - Sewerage Of Washing Water - Renovation And Construction Works (Foundations, Floors, Window And Door Joinery, Joinery, Internal Cladding, Fencing, Electrical Installations) - Prefabrication Of The Rg Switchboard - Installation Of Internal Installations In The Water Treatment Plant - Laying Cables For Submersible Pumps And Flushing Water Pumps - Start-Up Of The Pumping System During The Reconstruction Of The Station, It Is Absolutely Necessary To Ensure Continuity Of Water Supply To Recipients. The Ordering Party Requires That Contractors Interested In Submitting An Offer, At The Stage Of Its Preparation, Make An On-Site Visit To The Site Of The Works. The Date Of The On-Site Visit And The Technical Details Of Its Implementation Shall Be Agreed By The Contractor With The Ordering Party. The Costs Related To Carrying Out The On-Site Visit Are Borne By The Contractor. Contact Details Of The Employers Representative Responsible For Carrying Out The On-Site Visit To The Work Area: Mirosław Ziółkowski, Contact Telephone Number: 23 662 56 35 Ext. 47, E-Mail [email protected] A Note Will Be Prepared About The On-Site Visit, Which Will Be Received By Both The Ordering Party And The Contractor And Will Constitute An Annex To The Procedure Protocol. Offer Of The Contractor Who Has Not Made A Documented On-Site Visit Confirmation Of Carrying Out An On-Site Visit, The Template Of Which Is Specified In Annex No. 10 To The Swz, Will Be Rejected From The Proceedings Pursuant To Art. 226 Section 1 Point 18 Of The Act On Public Procurement. General Provisions1. The Contractor Will Provide Comprehensive Surveying Services For The Works Performed By Authorized Surveying Services, Including Marking Out And As-Built Inventory.2. The Contractor Is Obliged To Provide A Quality Guarantee For The Completed Subject Of The Order For The Construction Works Performed And The Materials Used. The Deadline Will Be Counted From The Date Of Final Acceptance Of Construction Works And Signing (Without Comments) Of The Final Protocol.3. In The Event Of Discrepancies In The Quantity Of Materials Between The Design Documentation And The Bill Of Quantities, The Construction Design Is The Superior Document. 4. Conditions For The Implementation Of Works: A) The Subject Of The Order Must Be Performed In Accordance With The Provisions Of The Swz, Construction Design, Technical Specifications For The Execution And Acceptance Of Works, Bill Of Quantities, Applicable Standards, Technical Conditions For The Execution Of Works, Construction Knowledge And Practice, Occupational Health And Safety Regulations , Fire Safety Regulations, Following The Instructions Of The Investors Supervision Inspector. B) Before Installing The Materials (For The Purpose Of Inspection), The Contractor Is Obliged To Provide The Supervision Inspector With Documents Confirming The Parameters Of These Materials. C) The Contractor Is Obliged To Organize And Carry Out The Works In A Safe Manner, Not Posing A Threat To People Staying In The Investment Area, In Accordance With The Attached Information Regarding Safety And Health Protection. D) The Contractor Will Perform The Subject Of The Contract From Its Own Materials. E) After Signing The Contract, The Contractor Will, Within 7 Business Days, Provide The Ordering Party With: • A Simplified Cost Estimate With A Table Of The Values Of Integrated Elements, Which Will Constitute An Annex To The Contract, • A Material And Financial Schedule For Approval, Including The Deadlines For The Implementation Of Individual Stages Of Work, Which Will Constitute An Annex To The Contract, • A Paid Insurance Policy Covering Civil Liability Insurance, And In The Absence Thereof - Another Document Confirming That The Contractor Is Insured Against Civil Liability In The Scope Of Activities Related To The Subject Of The Order For An Insured Amount Not Less Than Pln 500,000.00 (In Words : Five Hundred Thousand Zlotys Zero Groszy). The Insurance Should Cover In Particular The Works Covered By The Contract, Equipment And All Movable Property Directly Related To The Performance Of The Works, Civil Liability For Damages And Consequences Of Accidents Concerning Employees And Third Parties And Arising In Connection With The Works Carried Out, Including The Movement Of Motor Vehicles. The Insurance Should Be Valid For The Entire Period Of Execution Of This Order. The Ordering Party Allows The Submission Of A Policy Issued For A Period Shorter Than The Order Execution Period, Along With The Contractors Written Commitment To Maintain Continuity Of Insurance Throughout The Entire Contract Execution Period. If The Insurance Period Is Shorter Than The Period Of Implementation Of The Subject Of The Contract, Before The Expiry Of The Applicable Policy, The Contractor Is Obliged To Submit To The Ordering Party An Annex To The Policy Or Another Policy Concluded On No Worse Terms And Conditions Within 7 Days Before The Expiry Of The Policy. The Contractor Is Obliged To Provide The Ordering Party With A Copy Of The Insurance Policy Certified Compliance With The Original. F) The Ordering Party, For Its Own Use, Reserves The Right To Request From The Contractor An As-Built Cost Statement And Possibly Other As-Built, Material And Financial Statements, Required E.G. By The Co-Financing Institution. Implementation Of The Task, Including The As-Built Cost Estimate Signed By The Contractor And The Investor Supervision Inspector.5. The Ordering Party Allows The Possibility Of Offering Materials Equivalent To Those Specified In The Design Documentation, I.E. Not Worse Than Those Indicated In The Description Of The Subject Of The Order, But They Cannot Have Parameters Worse Than The Parameters Of The Materials Indicated By The Ordering Party In The Design, Bill Of Quantities, Detailed Technical Specifications. . A Contractor Who Refers To Equivalent Solutions Described By The Ordering Party Is Obliged To Demonstrate That The Construction Materials He Offers Meet The Requirements Specified By The Ordering Party. In Such A Situation, The Ordering Party Requires The Submission Of Appropriate Documents Confirming The Parameters Of These Materials. The Proposed Equivalent Materials Will Be Accepted By The Ordering Party Or The Supervision Inspector And The Designer. All Materials Specified In The Documentation, From Specific Manufacturers, Specify The Minimum Quality Parameters And Functional Features That The Materials Must Meet In Order To Meet The Requirements Set By The Ordering Party. Any Names Of Materials Used In The Procedure Documentation Are Not Binding And It Should Be Assumed That They Constitute Indications/Proposals And Are Intended Only To Clarify The Level Of The Ordering Partys Expectations In Relation To A Specific Solution. Construction Products That Will Be Used To Implement The Subject Of The Order Must Meet The Requirements Resulting From Legal Provisions, In Particular The Act Of April 16, 2004 On Construction Products And The Act Of July 7, 1994 Construction Law.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
cab9dab6-e8c5-4cb7-ad2f-89521aba1002.html
Attachments
Additional Details Available on Click