GTR 79799875

Tenders Are Invited For Construction Of An Underground Retention Reservoir In Kłecko Along With Accompanying Infrastructure Enabling Its Proper Functioning, In The Design And Build Formula

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
79799875
Tendering Authority
Subscribe to view
Tender No
RFZ.271.13.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of An Underground Retention Reservoir In Kłecko Along With Accompanying Infrastructure Enabling Its Proper Functioning, In The Design And Build Formula
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
13-05-2024 Closed
Work Detail
1. The Subject Of This Procedure Is The Construction Of An Underground Storage Tank With The Necessary Infrastructure On The Plots No. 31/4, 36, 37, 6 In Kłecko Under The Design And Build Formula.2. The Task Is Implemented On The Basis Of An Agreement To Grant Aid For Operations Of The Water And Sewage Management Type Entitled Reconstruction Of The Sewage Treatment Plant In Zakrzewo, Purchase Of Pumps For A Sewage Pumping Station In The Sanitary Sewage System In Gorzuchów And Construction Of A Water Supply Network At Ul. Spacerowa In Kłecko, As Well As The Construction Of An Underground Retention Reservoir In Kłecko Together With The Accompanying Infrastructure Enabling Its Proper Functioning - Under The Sub-Measure Support For Investments Related To The Creation, Improvement Or Expansion Of All Types Of Small Infrastructure, Including Investments In Renewable Energy And Energy Saving Covered By The Rural Development Program For 2014–2020.3. The Contractor Will Provide A Warranty For The Subject Of The Order (Construction Works Including Built-In Materials) For A Minimum Period Of 36 Months, Counted From The Date Of Acceptance. Note: The Warranty Period Is The Criterion For Evaluating Offers!4. Detailed Description Of The Subject Of The Order: 1) The Subject Of This Procedure Is The Construction Of An Underground Retention Reservoir In Kłecko Together With The Accompanying Infrastructure Enabling Its Proper Functioning, In The Design And Build Formula. 2) As Part Of This Order, The Following Should Be Performed: Stage I: Development Of Complete Design Documentation The Order Includes: A) Before Starting Design Work, The Contractors Obligation Is To: - Prepare A Technical Opinion Confirming The Possibility Of Carrying Out The Work In Accordance With The Ffu, - If Necessary, Obtain A Derogation From Technical And Construction Regulations In The Field Of Fire Protection Regulations. And Evacuation, - Obtaining The Necessary Consents, Opinions And Arrangements. B) Development Of Complete Design Documentation: Construction Design And Multi-Industry Technical Design (Executive Design), C) Preparation Of Bills Of Quantities, Investor Cost Estimates Divided Into Individual Industries/Specialties, D) Obtaining The Required Decisions Administrative, Including: - Decision On The Location Of A Public Purpose Investment And An Extract From The Local Development Plan, - Decision On A Building Permit For Construction Works For Which Obtaining A Permit Is Required; E) Preparation Of A Geodetic Map For Design Purposes, F) Preparation Of A Construction Design And Obtaining All Required Arrangements, Opinions, Decisions And Permits, Including The Final Decision On The Building Permit, G) Developing Technical Specifications For The Execution And Acceptance Of Works, H) Exercising Authors Supervision, I) Design Documentation Should Be Consistent With The Requirements And All Other Regulations , Standards And Legal Provisions That Must Be Followed When Implementing This Type Of Investment, And In Particular It Must Meet The Requirements Specified In: - The Act Of July 7, 1994 Construction Law (Consolidated Text: Journal Of Laws Of 2023, Item 682, As Amended), Implementing Provisions To This Act, - Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications Execution And Acceptance Of Construction Works And The Functional And Utility Program (Journal Of Laws Of 2021, Item 2454);, Regulation Of The Minister Of Development Of September 11, 2020 On The Detailed Scope And Form Of The Construction Project (Journal Of Laws Of 2022, Item 1679), - Regulation Of The Minister Of Infrastructure Of April 12, 2002 On The Technical Conditions To Be Met By Buildings And Their Location (Journal Of Laws Of 2022, Item 1225);I) As Part Of The Contractors Obligation Is To Obtain All The Data Necessary To Properly Design And Manufacture The Item. The Above List May Not Exhaust All Industry Studies Necessary To Perform The Order Covered By This Documentation, Which Does Not Release The Design Contractor From The Obligation To Complete And Submit The Design Documentation To The Ordering Party. The Scope Of Design Work Also Includes Obtaining All Legally Required Arrangements And Opinions, Administrative Decisions, Construction And Technical Expertise And Other Activities Necessary To Design And Perform Construction Works, J) The Ordering Party Will Consider The Design Stage Completed When The Contractor Submits A Valid Decision To Construction Or Reporting The Performance Of Construction Works For The Investment (To Which The Architectural And Construction Administration Authority Did Not Raise Any Objections). Stage Ii: Construction Of An Underground Retention Reservoir In Kłeck Along With The Accompanying Infrastructure Enabling Its Proper Functioning. The Task Should Include: A) Earthworks, B) Dismantling The Existing Underground Infrastructure (Rainwater Sewage Network With An Inlet To The Watercourse), C) Sanitary Works: External Water And Sewage Installations, Reconstruction Of The Existing Kd400 Rainwater Network, Delivery And Installation Of A Tank With A Capacity V = 225 M³, Delivery And Installation Of A Coalescing Separator With Integrated Sedimentation Tanks, A Sand Settling Tank, D) Construction Of A Rainwater Sewage Outlet To The Mała Wełna River In Kłecko Along With The Required Cleaning Of The Place Of Building The Inlet And Strengthening Of The Slopes Of The Watercourse, E) Construction Of An Underground Retention Reservoir, A Drive-Through Reservoir Vu = 225 M3, F) Construction Of A Coalescing Separator With Integrated Settling Tanks, G) Construction Of A Horizontal Sand Settling Tank, H) Performance Of All Auxiliary Works Related To The Implementation Of The Above-Mentioned Scope And Necessary To Obtain Full Functionality Of The Facility, I) Performance Of Construction And Assembly Works With Delivery Necessary Materials And Equipment,J) Commissioning And Carrying Out Trials And Tests Of All Facilities And Installations Completed Under The Contract,K) Accompanying Works,L) Preparation Of Documents Related To Putting The Facilities And Installations Into Operation (Preparation Of As-Built Documentation, Development Of Occupational Health And Safety Instructions, Development Of Commissioning And Operating Instructions - For All Facilities And Installations Constructed Under The Contract), M) Obtaining An Occupancy Permit On Behalf Of The Ordering Party If Such An Obligation Results From The Obtained Construction Permit.3) A Detailed Description And Scope Of The Order Is Included In Annex No. 8 To Swz, Which Includes: Functional And Utility Program Developed By Mr. Maciej Kanoniczaks Company Along With An Indicative Bill Of Quantities For Works.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a7da13a7-bf4c-4032-b8c9-2b5bb9a6b048.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders