GTR 79797776

Tenders Are Invited For Expansion And Modernization Of The Volunteer Fire Department Building In Czarna Wieś Kościelna - Completion

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
79797776
Tendering Authority
Subscribe to view
Tender No
Or.271.4.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Expansion And Modernization Of The Volunteer Fire Department Building In Czarna Wieś Kościelna - Completion
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
13-05-2024 Closed
Work Detail
Expansion And Modernization Of The Volunteer Fire Department Building In Czarna Wieś Kościelna - Completion As Part Of The Implementation Of The Task Reconstruction And Renovation Of Fire Stations In Czarna Wieś Kościelna And Zdroje And Adaptation Of The Building For The Needs Of The Village Community Center And The Volunteer Fire Department Warehouse In The Village Of Łapczyn. Detailed Description Of The Subject Of The Order, Conditions And Method Of Its Implementation: As Part Of The Task, The Completion Of The Expansion And Modernization Of The Volunteer Fire Departments Fire Station Building Should Be Completed, Consisting Of Completing Insulation Works On The Foundation Walls And Walls Above The Ground, Including Insulating The Ceiling With Rock Wool (The Employers Material On The Facility), Together With A Wooden Grate And Closing The Insulation With Osb Boards On Part Of The Ceiling Surface To Protect The Insulating Material Against Damage And Ensure Communication To The Roof Hatch And The Exhaust Gas Exhaust Fan, Making A Door Opening (The External Aluminum Door Will Be Delivered And Installed By The Manufacturer - Material Purchased In 2023. The Contractor Will Cover The Assembly Costs Within The Time Agreed With The Manufacturer) Along With Installation Of A Lintel, Construction Of A Partition Wall For The Cloakroom, Purchase And Installation Of Doors To The Cloakroom And The Common Room, As Well As Construction Of Suspended Ceilings Made Of Plasterboards In The Common Room, Corridor And Cloakroom, Filling, Priming And Painting, And Installation Of The Above-Mentioned Floors. Rooms And Internal Sanitary And Electrical Installations, Including Exhaust Gas Extraction And Landscaping, At Ul. Wesoła 22 In Czarna Wieś Kościelna, Plot No. Gr. 71/5, Located Within The Geod. Czarna Wieś Kościelna, Commune Czarna Białostocka. In The Years 2014 - 2023, The Fire Station Was Expanded With A Tower For Drying Fire Hoses (Lightning Protection Installation To Be Installed), A Common Room, Knee Walls With Wreaths And A Superstructure For Ventilation And Exhaust Chimneys, A Roof Truss With Covering Of The Fire Station Building, A Boiler Room And An Oil Storage Room, And A Central Heating System In Rooms Existing At That Time. Scope Of Construction Works:• Forging And Preparing A Hole In The External Structural Wall In Order To Mount The Entrance Door With Dimensions 1480X2100 (Doors Purchased In 2023, Delivery To The Facility On An Agreed Date With Possible Assembly By The Manufacturer - The Installation Value Should Be Included In The Calculation),• Embedding Lintels Mentioned Above Entrance Doors, • Insulating External Walls (Filling Gaps In Insulation) With Styrofoam Thickness. 15 Cm, With Gluing The Mesh, Doweling And Priming, Finishing With Thin-Layer Plaster (Lamb, Grain 1.5 Mm Colored In The Mass) - Approx. 95 M2, • Wiping Of The Plasters, Filling, Priming And Finishing With Thin-Layer Plaster (Lamb, Grain 1.5 Mm Colored In The Mass) In Mass) Of The Entire Facade Of The Building, Excluding The Tower - Approx. 220 M2. • Insulation Of The Attic Ceiling With Stone Wool. 15Cm + 10Cm (The Ordering Partys Material Stored On The Attic Ceiling Of The Facility)• Removing The Formwork From Pvc Pipes For The Porch Roof Poles, Filling And Covering With Resin Plaster Like The Buildings Plinth.• Installing A System Doormat With Dimensions Of 80X120cm On The Landing Of The Main Entrance,• Making A Soffit For The Main Entrance Porch Roof With Dimensions 230X390cm, • Preparation Of A Hole For Mounting Internal Double-Leaf Doors Without Thresholds, Aluminum Anti-Burglary Doors, Aluminum Door Structure (180X200cm). Aluminum-Colored Door Frame. Hinges And Handle Made Of Stainless Steel.• Purchase And Installation Of Doors With Dimensions Of 180X200cm - Internal Double-Leaf Doors Without Threshold, Aluminum, Anti-Burglary, Aluminum Door Structure. Aluminum-Colored Door Frame. Hinges And Handrail Made Of Stainless Steel, • Building Partition Walls 12 Cm Thick (Between The Vestibule And The Cloakroom Approx. 12.5 M2; Purchase And Installation Of Doors Measuring 90X200 Cm - Doors Between The Vestibule And The Cloakroom - Reinforced Internal Doors, Class 3, Rebated Or Non-Rebated With A Structure Door Leaves Of Group 1, I.E. Chipboard Reinforced With An Internal Rail And Frame Covered With Gray Hdf Board. Adjustable Door Frame Adapted To The Thickness Of The Walls. Silver Hinges And Door Handle. Left Door Leaf Finishing Works Inside The Building: A) Filling, Priming, Paintingb) Plasterboard Suspended Ceilings In The Cloakroom, Corridor And Common Room, C) Floors (Community Room, Corridor, Cloakroom - Leveling Screed, Priming, Stoneware Tiles With Plinth).• External Works: A) Ramp, B) Landing In Front Of The Main Entrance (With Installation Of The System Doormat), C) Strips Around The Building In The Sidewalk Edge Made Of Gray Concrete Paving Stones - Approx. 39 M2, • In The Attic Part, Above The Cloakroom (Place Of The Hatch To The Attic), Above The Vestibule And The Room/Community Room A Also In The Part Of The Stop To The Roof Hatch And A 1.5 M Wide Access To The Central Part Above The Garage (To The Exhaust Gas Exhaust Fan), Additionally Provide For The Arrangement Of A Wooden Grate Enabling The Installation Of Wool Insulation And A Closing Plaster - A Floor Made Of Osb Boards. 18 Mm• Insulation Of The Attic Elbow Walls With 15 Cm Thick Eps 100-038 Polystyrene With Primer Plaster On A Mesh - Approx. 75 M2. Scope Of Sanitary Works:• Execution Of Central Heating Installation. Made Of Thin-Layer Steel Pipes Connected With Compression Fittings Along With Their Thermal Insulation In The Form Of Mineral Wool In Aluminum Foil Of The Common Room In The Form Of A Power Supply And Control Installation With The Necessary Equipment In The Form Of Valves, Filters, Etc. Along With The Installation Of The Reventon Hc20-3S Water Heater Delivered To The Facility With Installation Of A Speed Regulator With A Thermostat Delivered With The Heater, • Installation Of 2 Radiators With Bottom Connection Type 22/600/400 Located On The Facility, • Delivery And Installation Of Automatic Exhaust Gas Extraction Devices Compatible With The Wpu-K-Type Exhaust Fan Purchased By The Ordering Party 22-3 Filtronik, Which Should Be Installed On The Ceiling Of The Facility, Delivered And Installed A Fire Damper. Ei60 With A Fusible Lock On The Pipe To The Fan, And The Passage Through The Reinforced Concrete Ceiling Should Be Made With A Drilling Rig, The Pipe Should Be Processed Tight, The Exhaust Gases Should Be Removed From The Fan With Spiro Pipes Through The Supplied And Installed Roof Exhaust Vent.• Delivery And Installation Of Exhaust Gas Extraction Control Automatics. Scope Of Electrical Works:• Execution Electrical Installations, Including The Installation Of Basic Lighting With Led Luminaires, Emergency And Evacuation Lighting, Installation Of Plug Sockets And Controls, Grounding And Lightning Protection Installations (Note: Under The Entrance To The Garages, There Is A Band Of Tape With Protruding Ends Enabling The Continuation Of The Installation, Making Control Connectors, Etc.), Equipotential Bonding, Electric Shock Protection, Fire Protection Switch, Measurements And Tests Of Completed Installations, Circuits And Cabinets. The Contractors Tasks Also Include: - Preparation Of Post-Construction Geodetic Inventory - 3 Copies, - Preparation Of Pictograms (Multi-Functional Room, Cloakroom) And Identification (Numbering) Doors To The Buildings Rooms With Described Tags For The Keys Of The Operated Locks, - Ensuring That The Fire Brigade Crews Can Enter And Leave The Fire Station Area, - Carrying Out The Task On The Move Of A Facility Of Strategic Importance In Terms Of Fire Protection. For The Area Of ​​Operation - Implementation Schedule To Be Agreed With The Facility Manager, - Installation Of Two Double Flag Holders In Places Agreed With The Facility Manager, - Obtaining An Occupancy Permit On Behalf Of The Ordering Party (Preparing Notifications To Sanitary And Epidemiological Station And The Fire Department, Participating In Facility Inspections, Removing Detected Defects And Omissions, Incurring Costs And Obtaining Positive Inspection Reports, - The Ordering Party Provides For A Staged - Monthly Settlement Of The Works, Making The Payment For A Specific Stage Of The Works Dependent On The Presented And Accepted Material And Financial Schedule, Their Actual Implementation Confirmed By The Investors Supervision Inspectors, And A Written Notification Of Completion Stage Of Works Submitted To The Ordering Party And After Protocol Confirmation Of This Fact, - The Ordering Party Informs That The Costs Related To The Consumption Of Electricity, Heat Energy, Water And Sanitary Security Are Borne By The Contractor Based On Separate Contracts With Network Operators Or With Specialist Companies Providing Such Services, - Contractor Will: - Carry Out Test Movements Of The Central Heating Installation (Cold And Hot), - Carrying Out Test Movements Of Exhaust Gas Extraction Technology, - Carrying Out Test Movements Of Emergency Evacuation Lighting, From The Above. Appropriate Protocols Should Be Prepared For Trial Movements. Carry Out Trial Movements Until The Positive Effects Assumed By The Project Are Achieved (E.G. Switching On Emergency And Evacuation Lighting, Etc.), - Submitting A Bid Cost Estimate Before Signing The Contract And An As-Built Cost Estimate After Completing The Task, The Investment Should Be Valued And Performed In Accordance With The Design Documentation, The Bill Of Quantities Is Only An Auxiliary Element For Preparing The Offer. The Ordering Party, In Accordance With Art. 101 Section 4 Of The Public Procurement Law Informs That Whenever Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Are Indicated In The Procurement Documentation, Solutions Equivalent To Those Described In The Above Documents Are Also Allowed. Therefore, For The Required Characteristics Of The Material, Product Or Service, The Solutions Indicated In These Documents Or Equivalent Are Acceptable.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
c17b874f-006f-4252-8324-a9520f251e26.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders