Tenders Are Invited For Modernization Of The Municipal Office Building - Stage Ii - Construction Of An Elevator In The Municipal Office Building In Konstantynów Łódzki In Order To Eliminate Architectural Barriers

Tender Detail

79797730
ZP.271.10.2024.AM
Self-Funded
Tenders Are Invited For Modernization Of The Municipal Office Building - Stage Ii - Construction Of An Elevator In The Municipal Office Building In Konstantynów Łódzki In Order To Eliminate Architectural Barriers
ICB
central europe
European Union
14-05-2024

Work Detail

1. The Subject Of The Order Is The Implementation Of Construction Works As Part Of The Investment Task Titled: Modernization Of The City Hall Building - Stage Ii - Construction Of An Elevator In The Building Of The City Hall In Konstantynów Łódzki In Order To Eliminate Architectural Barriers, On The Plot With Registration Number 337/1, Precinct K-10 Konstantynów Łódzki, Konstantynów Łódzki Commune, Pabianice Poviat.2. The Material Scope Of The Order Specified In Point 1, In Accordance With The Design Documentation Constituting Annex No. 9 To The Swz, Includes In Particular: 2.1. Expansion Of The Single-Story Building, 2.2. Construction Of The Elevator Shaft 0.06A,2.3. Reconstruction Of The 0.32 Heating Substation And The Heating Connection, 2.4. Separation Of A Handy Magazine 0.31 (Without The Need To Meet The Requirements Specified In The Design Documentation For The Archive), 2.5. Execution Of Communication 0.06, Vestibule 0.24, Communication 0.25 And Reconstruction Of Staircase Ii 0.K2 On The Ground Floor, Construction Of Corridor 1.15 On The 1St Floor And Corridor 2.14 On The 2Nd Floor.2.6. Construction Of A Toilet For The Disabled 0.03, 2.7. Construction Of A Womens Toilet 0.04 And A Mens Toilet 0.05,2.8. Demolishing The Existing Toilet In Komunikacja I 0.07 And Making The Part Of The Corridor After The Toilets Removed So That It Can Be Used Without Any Problems.3. The Subject Of The Order Should Be Performed In Two Stages: 3.1. Stage Iia Includes The Implementation Of The Works Specified In Points 2.1-2.53.2. Stage Iib Includes The Implementation Of The Works Specified In Points 2.6-2.84. The Detailed Scope Of Works And The Method Of Their Implementation Are Specified In The Design Documentation And Detailed Technical Specifications For The Execution And Acceptance Of Construction Works (Stwiorb), Constituting Annex No. 9 To The Specification Of The Terms Of The Contract (Swz), Taking Into Account Explanations And Changes Made By The Ordering Party During The Contract Award Procedure Public - If They Took Place. Note! The Detailed Design Takes Into Account The Change In The Scope Of Work Related To The Construction Of An Elevator In The Building Of The Municipal Office In Konstantynów Łódzki In Relation To The Original Building Permit And Is Covered By An Alternative Building Permit Decision. It Complements And Details The Replacement Construction Design Titled Superstructure And Expansion Of The Existing Public Administration Building On The Border With Plots No. 343 And 336/1, Demolition Of Farm Buildings, Reconstruction Of The Exit And Entrance To The Plot Along With The Internal Communication System, Thermal Modernization And Expansion Of The Water Supply And Sewage Installations. And Electricity In The Building. In Order To Properly Prepare The Offer And Calculate The Offer Price, The Current Scope Of Construction Works Described In The Detailed Design Should Be Taken Into Account.5. The Contractors Remuneration Is A Lump Sum, Which Is The Equivalent Of The Contractors Benefit Described In The Design Documentation Indicated In Point 4 And In Stwiorb.6. The Bill Of Quantities Is Of An Auxiliary Nature, Which Means That If A Given Type Of Works, Their Dimensions Or Their Scope Has Been Included In The Design Documentation Or In Stwiorb - The Contractor Undertakes To Perform The Type Of Works, Their Dimensions Or Their Scope Indicated Therein In Accordance With The Design Documentation Or Stwiorb As A Lump Sum Remuneration, Even If A Given Type Of Works, Their Quantity Or Their Scope Was Not Included In The Bill Of Quantities.7. All Works Performed And Materials Delivered Will Be Consistent With The Design Documentation And Stwiorb. If The Materials Or Works Are Not Fully Compliant With The Design Documentation Or Stwiorb And This Results In Unsatisfactory Quality Of Construction Works, Such Materials Will Be Replaced With Other Ones, And The Completed Elements Will Be Dismantled And Rebuilt At The Contractors Expense. 8. The Subject Of The Order Should Be Performed In Accordance With The Design Documentation, Stwiorb And Applicable Law, Construction Practice, Technical Knowledge, The Contract Concluded With The Ordering Party, And Arrangements With The Ordering Party Made During The Implementation Of The Subject Of The Order.9. Accessibility Requirements. The Ordering Party Envisages The Construction Of An Elevator Shaft And The Construction Of An Elevator Adapted For Disabled People, Wheelchair Users, Elderly People And Visually Impaired People. The Elevator Will Be Equipped With Buttons With Braille Descriptions. The Elevator Will Comply With The Provisions Of §193 Of The Regulation Of The Minister Of Infrastructure Of April 12, 2002 On The Technical Conditions To Be Met By Buildings And Their Location (I.E. Journal Of Laws Of 2022 Item 1225). And Other Standards And Regulations Regarding Passenger Lifts Adapted For Disabled People Referred To In The Design Documentation. The Elevator Will Have A Location And Size Different Than In The Original Design. These Changes Are Covered By The Design Documentation And The Replacement Building Permit Decision. It Is Also Planned To Construct A Toilet For Disabled People.10. Warranty. The Length Of The Quality Warranty Period For The Completed Construction Works And The Materials/Devices Used/Delivered, Which The Contractor Provides To The Ordering Party, Is One Of The Offer Evaluation Criteria, Which Will Be Assessed In Accordance With Chapter Xxi Point 2.2 Of The Tor. The Ordering Party Sets The Minimum Required Period For The Quality Guarantee Granted By The Contractor For The Construction Works Performed And The Materials/Equipment Used/Delivered For A Period Of 60 Months (5 Years), Counting From The Date Of Final Acceptance Of The Works.11. Equivalent Solutions. In Each Case Of Using Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Public Procurement Law, The Contractor Should Assume That Such A Reference Is Accompanied By The Words Or Equivalent. If References To Standards, European Technical Assessments, Approvals, Technical Specifications And Technical Reference Systems Are Used In The Design Documentation, The Ordering Party Allows Solutions Equivalent To Those Described. When Analyzing The Design Documentation, The Contractor Should Assume That Each Reference Used In The Design Documentation Is Accompanied By The Word Or Equivalent. If Trademarks Are Used In The Design Documentation Or Technical Specification For The Execution And Acceptance Of Works, It Means That They Are Provided As Examples And Only Define Minimum Expected Quality Parameters And The Required Standard. The Contractor May Use Equivalent Materials Or Devices, But With Similar Or Better Technical And Quality Parameters, The Use Of Which Will In No Way Adversely Affect The Proper Functioning Of The Solutions Adopted In The Design Documentation Equivalent Will Be Obliged To Demonstrate During The Execution Of The Order That The Materials And Devices Used By Him Meet The Requirements Specified By The Ordering Party. The Use Of A Label In The Design Documentation Means That The Ordering Party Accepts All Labels Confirming That Given Construction Works, Supplies Or Services Meet The Equivalent Requirements Specified By The Ordering Party. Labels. If The Contractor, For Reasons Beyond His Control, Cannot Obtain The Label Or Equivalent Label Specified By The Ordering Party, The Ordering Party, Within The Deadline Set By Him, Accepts Other Appropriate Means Of Evidence, In Particular The Manufacturers Technical Documentation, Provided That The Contractor Proves That The Construction Works , Supplies Or Services To Be Performed By Him Meet The Requirements Of A Specific Label Or Specific Requirements Indicated By The Ordering Party. The Use In The Design Documentation Of The Requirement To Have A Certificate Issued By A Conformity Assessment Body Or A Test Report Carried Out By This Body As A Means Of Evidence Confirming Compliance With The Requirements Or Features Specified In The Description Of The Subject Of The Order, Offer Evaluation Criteria Or Terms Of Order Execution Means That The Ordering Party Also Accepts Certificates Issued By Other Equivalent Conformity Assessment Units. The Ordering Party Also Accepts Other Appropriate Means Of Evidence, In Particular The Manufacturers Technical Documentation, In The Event That A Given Contractor Has Neither Access To Certificates Or Test Reports Nor The Possibility Of Obtaining Them In An Appropriate Time, Unless This Lack Of Access Cannot Be Attributed To A Given Contractor. , And Provided That A Given Contractor Proves That The Construction Works, Supplies Or Services Performed By Him Meet The Requirements Or Criteria Specified In The Description Of The Subject Of The Order, The Offer Evaluation Criteria Or The Requirements Related To The Implementation Of The Order. If The Description Of The Subject Of The Order Includes A Provision Resulting From The Knr Or Knnr Indicating The Need To Use Specific Equipment With Specific Parameters To Complete The Order. The Ordering Party Allows The Use Of Other Equipment As Long As It Ensures The Achievement Of The Assumed Design Parameters And Does Not Result In The Risk Of Non-Compliance Of The Work Performed With The Technical Documentation.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail