i0700 Efu-10724 Ado Arena, Solar Energy Plant - Procurement Of General Contractor . Ado Swimming Arena Was Built Together With Amalie Skram Upper Secondary School. The Facility Was Built In 2012 – 2014 And Is Jointly Owned By Vestland County Municipality And Bergen Municipality. The Facility Bases Heating Of Pool Water On District Heating, Which Results In A Significant Consumption Of District Heating Energy. A Complete Solar Energy System With Solar Collectors And Solar Cells Will Be Established On The Roof Of The Building, Which Will Be Connected To The Buildings Existing Energy System. The Roof Surface That Is Available Must Be Utilized To The Greatest Extent Possible For Solar Collectors, Secondarily Solar Cells. There Should Be 30-33% Solar Cells In Relation To Solar Collectors. The Roof Surface Is Checked For An Additional Load Of 40Kg/M2. Large Parts Of The Roof Can Withstand This Load, And Can Then Be Used For Solar Collectors. It Is Assumed That Solar Collectors Are Anchored In The Roof, And Not With Ballast. It Has Been Chosen To Carry Out The Procurement As A Turnkey Contract, Where The Competition Is Based On The Fact That The Builder Wants To Let The Market Compete On How Much Energy Can Be Delivered Within The Budget.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.