The Existing 4 Electric Boilers 3 X 28 Kw And 1 X 14 Kw, All Fittings And Technological Accessories Will Be Dismantled And Replaced By 3 Pieces Of Air/Water Heat Pumps With A Maximum Output Of 3 X 20 Kw. The Existing 14 Kw Electric Boiler Will Be Used Again As A Bivalent Source. The Boilers Are Connected In A Cascade, The Common Pipe Is Then Connected To The Distributor And Collector Of Heating Water, From Where 3 Separate Heating Branches Dn 40 Are Led. Pressure Is Provided By A Common Hot Water Circulation Pump. The System Is Pressurized With A Pressure Expansion Vessel.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.