The Contractor Undertakes To Carry Out The Work For The Client: Replacement Of Hot Water Heaters In Apartment Buildings Brno-Bystrc 2024 According To The Project Documentation And The Price Statement Of Dimensions - Dismantling Of The Existing Thermal Insulation Disassembly Of Part Of The Sv, Tuv And Cr Pipes Incl. Fittings Dismantling Part Of The Dhw Heating Pipe Dismantling And Removal Of The Walkway At The Dhw Heating Supply Disassembly Of The 4000L Heater By Cutting Installation Of A New Heater - Car With Hydraulic Arm Heater Pn10/10 2500 L, Heating Insert F10m The Embedded Part Of The Plumbing, Heating And Circulation Pipes Will Be Polyfusion Welded From Ppr Pn 20 Pipes. Dhw Outlet: Inter-Flange Valve Dn 80, Flange Pn16, Screws M16, Collar, Ppr Pipe Pn20 Sv Inlet: Flange Collar And Flange Pn16, Screws M16, Screwing X6/4, Pipe Ppr Pn20, Ball Valve Pn 35 Dn 50 Dhw Circulation: Fitting 40X5/4, Ball Valve Pn35 Dn 32 Drain Valves Dn 15 Thermometers With A Well 0-120°C Safety Valve 10Bar Deformation Pressure Gauge 0-10Mpa Ball Valve Pn35 Dn 25 - Discharge Under The Heater Installation Of Steel Pipes Ut Installation Of New Regulation Incl. Electrical Connection, Up To The Switchboard In The Hallway In The Basement Of The House Installation Of A New Thermostat 20 To 160°C Installation Of A New Pump 25/6 With Filter Incl. Electric Connection Protective Coating Of Steel Pipes Installation Of Thermal Insulation Incl. Gluing The Heater, Insulation Thickness 100 Mm Installation Of Thermal Insulation With Al Layer For Hot Water Heating: 60/30Mm Installation Of Sv Thermal Insulation: Thickness 13 Mm Installation Of Dhw Thermal Insulation And Dhw Circulation: Thickness 20Mm Venting The System Earthing Of The Dhw Heater Removal Of The Heater, Debris, Workplace Cleaning
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.