GTR 79715599

Tenders Are Invited For Construction Consultant And Site Supervision Duties For The Partial Renovation Of Munkkiniemi Parish Hall (Church)

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
79715599
Tendering Authority
Subscribe to view
Tender No
2024-145396
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Consultant And Site Supervision Duties For The Partial Renovation Of Munkkiniemi Parish Hall (Church)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union
Last Date of Bid Submission
23-05-2024 Closed
Work Detail
We Are Asking For Your Offer For The Tasks Of Construction Consultant And Site Supervision (Supervision Of Construction, Building Technology And Geothermal Works) For The Partial Renovation Of The Parish Hall (Church) In Munkkiniemi Based On This Request For Tender And Its Attached Material. If It Is Not Possible To Build A Geothermal System On The Site, The Portion Of Monitoring The Geothermal Work Will Be Deducted From The Ceiling Price. Project Information Munkkiniemi Srk Talo (Church), Tiilipolku 6, 00330 Helsinki. The Target Is The Parish Hall (Church) Designed By Architect Pauli Salomaa, Which Was Built In 1953–54 And Inaugurated On June 27, 1954. A Partial Renovation Was Done In 1998 Based On The Plan Of Architect Kari Hyvärinen. The Building Is Not Protected By The Site Plan, By The Finnish Museum Agency Or By The Church Act, But The Finnish Museum Agency Is Strongly Involved In The Project. The Church In Munkkiniemi Includes The Wing Building And The Church Part. In The Wing There Are Three Apartments And Parish Facilities (E.G. Office And Club Facilities). The Wing Section Has Two Floors And A Basement. The Church Part Has Two Floors (1+1 Basement). Room Area: 1,177 M²gross Area: 1,326 M²volume: 5,964 M³ Schedule The Project Planning Of The Site Will Start In June 2024. The Developer Consultant Will Start The Project In The General Planning Phase In 10/2024 And The Assignment Will End With The Completion Of The Site In 12/2026 (According To The Preliminary Project Schedule ). The Supervisors Will Start Assignments Around 10/2025. The Plans And Contract Calculation Documents Must Be Ready By The Middle Of 7/2025 At The Latest. The Selection Of The Contractor Will Take Place After The Tender Based On The Prepared Plans, So That The Implementation Can Start In The Fall Of 11/2025 According To A Separately Updated Schedule. The Form Of The Contract Is A Fixed-Price Overall Contract. Estimated Contract Period November 2025-December 2026 (The Schedule Will Be Specified As The Planning Progresses After Negotiations With The Client/Main Designer/User/Construction Consultant).Construction Consultant And Site Supervisor The Tasks Required By The Construction Consultant (Later Rap) And Site Supervision In Addition To The Task Lists: Preparation Of The Following Documents: • Site Monitoring Plan And Its Completion• Occupational Safety Document For The Contract (Rap) And Acting As The Clients Occupational Safety Coordinator (Coordinator Construction Supervisor)• Moisture Management Plan (Rap) And Acting As Moisture Control Coordinator (Coordinator Construction Supervisor)• Preparation Of The Contract Program (Entire Contract)• Draft Contract Contract • Request For Tender And Offer Form For The Contract Together With The Clientother Tasks :• Participation In The Contractor Competition (Presentation Of The Work Site, Etc.), Rap• Participation In The Contract Report Negotiations, Rap• Starting The Construction Site, Handing Over The Construction Site To The Contractor (Rap, Supervisors)• Participation In Construction Site Meetings (Supervisors, Rap) And Acting As Meeting Secretary Rap (Approximately 20 Meetings Each 2 Hours /Person)• Approximately 20 Planning Meetings Of 2 Hours Each, Rap Participates• Supervision Tasks And Reporting In Accordance With Task Lists, Job Descriptions And Instructions Given By The Customer (Estimate Of Hours Used For Supervision With Reports, Approx. 6 H/Week/Supervisor)• Separate Customer/User Meetings For Rap And Supervisors At The Customers Office 10 H/Person• Tasks Required By The Building Permit, E.G. Supplementing The Inspection Document• Reception And Warranty Period Tasks With Reception And Post-Inspections• Updating The Maintenance Log Documents With The Contractors Detailed Documents, The Supervisors Make Sure That They Enter The Maintenance Log• Informing E.G. About The Site Situation, Changes To The Customer/User Representative• Project Bank Pris Maintenance (E.G. Export Of Reports, Meeting Minutes, Etc. Prepared By The Developer Consultant And Site Supervisor To The Project Bank)
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
019096fd-2504-4f56-bea7-4ca180a4ffad.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders