2024 Sidewalk Program . • Supply, Place, And Broom Finish Concrete Sidewalk At A Minimum Of 100Mm, Based On Csa Standards. Concrete To Be 35 Mpa At 28 Days, With A Maximum Slump Of 75Mm. • Concrete Curb And/Or Gutter To Match Existing, As Per City Of Lethbridge Dwg. Str 03. • Removal Of Any Surplus Base Material As Required In Order To Achieve Sufficient Concrete Depths. • Supply, Place, And Compact Crushed Aggregate As Required - Minimum 25Mm To A Maximum Of 75Mm. • Expansion Joints To Be Installed As Required. New Sidewalk Panels To Be Doweled Into Existing Sidewalk Panels. • Alleys And Driveway Approaches To Be A Minimum 150Mm Thick With 10M Rebar, Placed Every 45-60Cm In Both Directions And Tied Every Second Rebar Intersection (As Per Csa A23.1 Table 17). • All Intersection Corners Of The Sidewalk To Be Barrier-Free - As Per City Of Lethbridge Dwg. Str 11.0. • Repair The Asphalt Adjacent To The Sidewalk Installation – Matching Adjacent Asphalt Thickness. • Provide Any Surveying If Required. The Town Will Not Provide Survey, All Curb Is To Tie Into Adjacent Curbing. • 1-Year Warranty Must Be Provided On All Work. • Perform All Associated Form Removal And Site Cleanup.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.