GTR 79703379
Tenders Are Invited For Construction Of A Fishing Station In Janikowo
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
79703379
Tendering Authority
Subscribe to view
Tender No
RIT.ZP.271.6.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A Fishing Station In Janikowo
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
09-05-2024
Closed
Work Detail
The Subject Of The Order Is: Construction Of A Fishing Station In Janikowo. The Subject Of The Public Order Is The Construction Of A Fishing Station Building, Constituting The Base For The Activities Of Circle No. 91 Of The Polish Association Of Fishing Associations In Janikowo. The Building Will Be Used In Accordance With Its Intended Purpose. The Designed Facility Is A Fishing Station Building With One Above-Ground Storey, Single-Body, Rectangular In Plan, With A Brick Structure With A Gable Roof With A Slope Angle Of 40º, Covered With Metal Tiles. Colors At The Investors Discretion.1. Characteristic Parameters Of The Facility Building Area M2 75.60 Usable Area M2 57.05 Height M 6.90 Length M 12.20 Width M 6.20 Volume M3 408.20 Number Of Above-Ground Floors 1 Distance From The Nearest Residential Building 280 M2. Installationsthe Building Will Be Equipped With Water Supply, Sewage, Electrical Installations And Gravity Supply And Exhaust Ventilation. Building Heating - Dual-Function Gas Boiler Powered By An Lpg Tank Installation. Exhaust Air - Ventilation Grilles With A Cross-Section Of Min. 400 Cm2 Installed In Ventilation Ducts Made Of Ceramic Ventilation Shapes 19/19. Air Supply - Through Holes Located In The Lower Part Of The Internal Doors. Rainwater Will Be Discharged On The Surface To The Plot Area.3. Construction And Material Data1) Structure - Traditional, Brick;2) Foundations • Existing Foundation Strips - Reinforced Concrete Of B20 Concrete, • Concrete Reinforced Concrete. 10 Cm, • Foundation Walls Made Of Concrete Blocks On Cement Mortar. 3) External And Internal Walls Made Of Aerated Concrete, Thick. 24 Cm, Partition Walls Made Of Aerated Concrete 12 Cm. Partition Walls Should Be Connected To The Load-Bearing Walls Using Interlocking Pieces Or Steel Anchors.4) Rings - Reinforced Concrete Rings Are Designed From C20/25 Concrete, Reinforced With A-Iiin Steel (Rb500).5) Lintels - Over Windows And Doors Made Of Reinforced Concrete, Prefabricated Sbn 120/120 With Lengths Given In The Construction Drawings.6) Chimneys - Ventilation Ducts Made Of Ceramic Fittings 19/19, Ventilation Ducts Should Be Equipped With Cleaning And Inspection Holes, Closed With Doors.7) Roof• Wooden Structure Made Of Prefabricated Lattice Girders According To The Design And Plant Guidelines Prefabrication. Insulate Wooden Elements At The Junction With The Wall Or Ring Beam With A Spacer Made Of Insulating Felt. Attach The Beams To The Beams Using Perforated System Anchors. All Wooden Elements Should Be Protected With Protective Agents Against Fungi, Pests And Fire. • Covering – Metal Roofing Tiles.8) Moisture-Proof Insulation • Foundation Walls: Vertical – Abizol R+P Coating, Horizontal – Weldable Felt, • Floors On The Ground – Weldable Felt, • In The Suspended Ceiling Level – Vapor-Proof Foil, • Insulation Under The Roof Covering – Vapor-Permeable Foil .9) Heat Insulation• Floors On The Ground – Eps Polystyrene 100-038 Gr. 10 Cm,• Soffit Insulation – Expanding Mineral Wool, Thickness. 20 Cm, • Foundation Wall – Styrofoam Eps 80-036 Gr 10 Cm, • External Wall – Styrofoam Eps 80-036 Gr 15 Cm.10) Interior Finishing • Floors – Ceramic, • Plasters – Cement-Lime Or Gypsum. • Ceiling Linings – Suspended System Made Of 12.5 Mm Plasterboard On A Steel Frame Attached To The Roof Trusses, • Window Sills Made Of Conglomerate Or Pvc.11) External Finishing • External Joinery - Steel Doors Made Of Coated Sheet Metal, Pvc Windows, • External Plasters - Structural On A Plastic Mesh Artificial, • Gutters And Downpipes Made Of Coated Steel Sheet, • Window Sills Made Of Coated Steel Sheet.4. Land Developmentthe Plot Includes: - An Lpg Gas Fuel Tank With An Installation Supplying The Building, - A Playground With An Integration Sandbox, Play Equipment And Intelligent Benches, - Solar Park Lighting Lamps With An Led Photovoltaic Panel, - Hotels For Children Were Installed On The Trees. Insects, - Flower Bed With Plants, - Paths For Blind People With Slabs With Protrusions, - Driveway For People With Disabilities, - Information Boards In Braille, - 120 Cm Wide Entrance Gate Adapted For People With Disabilities. The Order Is Co-Financed By Under The Measure Support For Local Development Under The Leader Initiative Covered By The Program In The Development Of Publicly Available And Non-Commercial Tourist, Recreational Or Cultural Infrastructure. Sub-Measure 19.2 Support For The Implementation Of Operations Under The Community-Led Local Development Strategy Covered By The Rural Development Program For 2014-2020. Thematic Scope Of The Operation: 2.1.1 Construction Or Reconstruction Of Tourist And Recreational Infrastructure In The Lds Area By 2023. A Detailed Description Of The Subject Of The Order And A Description Of The Ordering Partys Requirements Regarding Implementation And Acceptance Are Specified In: - A Detailed Description And Method Of Execution Of The Order Are Included In The Design Documentation And Technical Specification Which Constitute Annex No. 7 To The Swz And The Bill Of Quantities (Auxiliary Element) Constituting Annex No. 6 To The Swz, - Contract Template - Annex No. 5 To The Swz. All Requirements Specified In The Documents Indicated Above Are Minimum Requirements And Their Fulfillment Is Obligatory. Failure To Meet The Above-Mentioned Minimum Requirements Will Result In Rejection Of The Offer As Inconsistent With The Terms Of The Contract Pursuant To Art. 226 Section 1 Point 5 Of The Public Procurement Law. Guarantee And Warranty. Required Warranty Period For The Completed Subject Of The Contract - A Minimum Of 36 Months. The Contractor May Propose A Longer Period, Extending The Minimum Period By An Additional 24 Months, Which Will Be Taken Into Account During The Evaluation And Examination Of Offers In Accordance With The Principles Set Out In Chapter Iii, Subchapter 5 Swz. Information Whether, In Relation To The Subject Of The Order, The Ordering Party: A) Took Into Account The Requirements Regarding Accessibility For Disabled People And Design For All Users, In Accordance With Art. 100 Paragraph 1 Of The Act. The Project Provides For Adapting The Infrastructure To The Needs Of Disabled People. B) Defined The Requirements Regarding Performance Or Functionality, In Accordance With Art. 101 Section 1 Point 1 Of The Actnot Applicable C) Requests A Specific Label Or Indicates The Applicable Requirements Of A Specific Label, In Accordance With Art. 104 Of The Actnot Applicable
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
cba9bb52-f4e0-44ac-b44e-e2334141b217.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.