Tenders Are Invited For Adaptation Of The Facility Of The Special Educational And Educational Center No. 2 In Otwock To The Fire Protection Recommendations. Post-Inspections, In Accordance With The Technical Expertise Regarding The State Of Fire Protection. - Stage I
Tenders Are Invited For Adaptation Of The Facility Of The Special Educational And Educational Center No. 2 In Otwock To The Fire Protection Recommendations. Post-Inspections, In Accordance With The Technical Expertise Regarding The State Of Fire Protection. - Stage I
1. The Subject Of The Order Is The Performance Of Construction Works Related To The Implementation Of The Investment Task: Adaptation Of The Facility Of The Special Educational And Educational Center No. 2 In Otwock To Fire Protection Recommendations. Post-Inspections, In Accordance With The Technical Expertise Regarding The State Of Fire Protection. – Stage I.2. The Basic Order Covers The Following Tasks: 1) Renovation Of Fire Protection - Replacement Of The Hydrant Installation In The Building And Implementation Of Fire Protection In The Staircases; 2) Construction Of A Smoke Removal System For Staircases In The Building. 3. The Detailed Scope Of The Subject Of The Order And Quality Requirements Are Specified In The Design Documentation, Which Includes: 1) Characteristics And Assumptions For Cost Estimates 2) Technical Specifications For The Execution And Acceptance Of Construction Works For The Renovation Of Fire Protection In The Building Of The Special Educational And Educational Center No. 2 In Otwock 3) Design For The Renovation Of Security Measures Fire Protection In The Building Of The Special Educational And Educational Center No. 2 In Otwock - Architectural And Construction Industry4) Design Of The Installation Of A Fire Alarm System In The Special Educational And Educational Center No. 2 In Otwock - Electrical Industry5) Technical Design Of The Hydrant Installation In The Building Of The Special Educational And Educational Center No. 2 In Otwock - Sanitary Installations Industry6) Bill Of Quantities - Smoke Removal System For Staircases7) Bill Of Quantities For Separation Of Staircases And Fire-Fighting Water Supply System With Hydrants Note: The Attached Bill Of Quantities Should Be Treated Solely As Auxiliary Materials For Determining The Lump Sum Price Of The Order.4. The Ordering Party In Accordance With Art. 441 Section 1 Of The Public Procurement Law Provides For The Possibility Of Using Additional Construction Works Under The Option Right. The Following Additional Construction Works May Be Commissioned Under The Option Right: - Additional Option 1 (Part I) - Door Closers - Additional Option 2 (Part Ii) - Door In The Basement.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.