GTR 79620127

Bids Are Invited For Consulting Services For Design And Construction Services For Brady Road - Area B

ICB — International Competitive Bid Closed Northern America
Tender Information
GTR Reference
79620127
Tendering Authority
Subscribe to view
Tender No
309-2024
Financer Name
Self-Funded
Work Title
Bids Are Invited For Consulting Services For Design And Construction Services For Brady Road - Area B
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Northern America
Political Region
Asia Pacific Economic Cooperation APEC,G20,APAC Asia Pacific
Last Date of Bid Submission
17-05-2024 Closed
Work Detail
Consulting Services For Design And Construction Services For Brady Road - Area B . Full Title: Professionalconsulting Services For Design And Construction Services For Brady Road Resource Management Facility - Area Bd5. Scope Of Servicesd5.1 The Services Required Under This Contract Shall Consist Of Planning, Design Andconstruction Services For Area B At The Brady Road Resource Management Facility (Brrmf) Includingthe Following:(A) Project Management(B) Geotechnical Investigation(C) Waste Disposal Cells - Preliminary Design(D) Leachate Collection System Design(E) Access Road Design(F) Surface Water Management Plan(G) Waste Disposal Cell - Design & Tender(H) Fill Sequencing Plans(I) Contract Administration(J) Post Construction Servicesd5.1.1 Project Management(A) Provide Project Management Services To Ensure That This Project Is Delivered Within The Scopeof Work Presented In This Rfp.(B) Preparation Of Agenda And Minutes For All Meetings. The Following Meetings Should Be Includedat A Minimum:(I) Project Initiation(Ii) Geotechnical Planning(Iii) Geotechnical Reporting, And Impact On Design Of Area B(Iv) Area B Preliminary Design &Ndash; Excavation Limits(V) Cell Design (3) &Ndash; Preliminary, Detailed, And Final Design(Vi) Construction &Ndash; Pre-Award(Vii) Construction &Ndash; Project Initiation(Viii) Construction (10) &Ndash; Bi-Weekly Site Meetings(Ix) Project Close-Out Meeting(C) Monthly Project Progress Reports, Including Earned Value Management (Evm)Methodologyd5.1.2 Geotechnical Investigation(A) Conduct A Geotechnical Investigation To Assess Subsurface Conditions, Classifying Andunderstanding The Characteristics Of The In Situ Soils And Provide Recommendations For Cell Androadway Development And Design. The Investigation Shall Include:(I) Field Investigation (Drilling Program) And Laboratory Analysis (Soil Testing) Tocharacterize Area B Soils For Correlation To Relevant Waste Disposal Cell And Roadway Designengineering Properties.(Ii) Analysis Of Groundwater Conditions And Pressures, Including A Hydrologic/Hydraulic Review.(Iii) Groundwater Monitoring Well Installations To Measure Groundwater Elevations In Area B.(Iv) Geodetic Survey Documenting Field Investigation And Monitoring Well Locations.(B) The Geotechnical Investigation Shall Be A Minimum Of Two (2) Days Onsite To Advance At Least20 Test Holes.(C) A Minimum Of Three (3) Groundwater Monitoring Wells Shall Be Installed.(D) Prepare A Detailed Geotechnical Summary Report, Including:(I) Area B Clay Thickness (Isopach) Map(Ii) Area B Collector Ditch Modeling And Design(Iii) Assessment Of Basal Heave(Iv) Slope Stability Assessment(V) Soil Consolidation Assessment(Vi) Recommended Waste Disposal Cell Liner Design(Vii) Recommended Roadway Base Structure Design D5.1.3 Waste Disposal Cells -Preliminary Design(A) Prepare A Preliminary (~30%) Design For The Area Depicted As Area B In The Site Mapshown (Appendix A), To Meet The Following Objectives:(I) Maximize Waste Disposal Capacity(Ii) Facilitate Operational Efficiencies(Iii) Minimize Construction Costs(Iv) Minimize Leachate Generation And Optimize Leachate Collection(B) Incorporate Existing Infrastructure (Landfill Gas System, Leachate Tank And Associatedunderground Infrastructure, Administration And Equipment Buildings) In The Preliminary Design Andphasing As Well As Consideration Of Space For Additional Infrastructure That May Be Required (E.G.Secondary Tank);(C) Individual Disposal Cells Shall Each Accommodate Approximately Two (2) Years Of Disposalcapacity.(D) The Preliminary Design Shall Incorporate Surface Water Management, Access Roads (Area Bperimeter Road, &Lsquo;Phased&Rsquo; Internal Roads To Active Disposal Cell), Long-Term Vehicle Access (Trafficmanagement Plan), Leachate Collection And Storage Infrastructure, And Secondary Littercontainment/Management Options.A Road To The Top Of Area B (At Final Elevation) Should Be Included In The Outside Slopes Of Thewaste Disposal Area For Long Term Access And Maintenance.(E) A High-Level Site Phasing Plan Shall Be Developed Indicating Timelines For The Constructionof All Disposal Cells And Infrastructure Within Area B.(F) Soil Balance Calculations Shall Be Completed, With Consideration Towards On Goingconstruction Of Disposal Cells In Area B (E.G. Cell Excavation, Berm Construction, Final Cover)(G) Preliminary Design Drawings Shall Be Completed For Discussions With The Regulator.(H) The Preliminary Design Shall Be Sufficient To Update An Existing Class 3 Cost Estimate (Seebrrmf Master Plan) In Accordance With The City&Rsquo;S Deliverables Maturity Assessment Checklist.D5.1.4 Leachate Collection System(A) Prepare Design Drawings And Specifications For The Construction/Installation Of Leachatecollection System Piping Around The Perimeter Of Area B, Based On The Preliminary Design Of Wastedisposal Cells In Area B.Construction/Installation Of Leachate Collection System Piping Shall Be Tendered In The Samecontract As The Waste Disposal Cell Contract.(B) The Leachate Collection System Shall Be Consistent And Compatible With The Existing Leachatecollection System Designed For Area A (I.E. Gravity Drainage, Pneumatic Pumps In Lift Stations).(C) Estimated 1,800 Metres Of Leachate Piping Is Required For Area B; Length Of Pipe Tenderedfor Installation Will Depend On Estimated Price Relative To Available Capital Construction Budget.(D) A Class 1 Cost Estimate Is Required At Least Six (6) Weeks Prior To Issuing The Tender Forconstruction.D5.1.5 Access Roads(A) Prepare Design Drawings And Specifications For The Construction Of Perimeter Access Road Forarea B, Based On The Preliminary Design Of Waste Disposal Cells And Surface Water Management Planfor Area B.Construction Of The Perimeter Access Road Shall Be Tendered In The Same Contract As The Wastedisposal Cell Contract.(B) Prepare Preliminary Design Drawings For The Construction Of &Lsquo;Phased&Rsquo; Internal Access Roads Towaste Disposal Cells Within Area B, Based On The Fill Sequencing Plan For Area B. A Road To The Topof Area B (At Final Elevation) Should Be Included In The Outside Slopes Of The Waste Disposal Areafor Long Term Access And Maintenance.Separate Access Roads Are Required For Customers And Operations (E.G. Heavy Equipment).(C) Estimated 1,200 Metres Of Roadway Is Required For The Perimeter Of Area B; Length Of Roadwaytendered For Construction Will Depend On Estimated Price Relative To Available Capital Constructionbudget.(D) A Class 1 Cost Estimate Is Required For The Perimeter Access Road At Least Six (6) Weeksprior To Issuing The Tender For Construction.D5.1.6 Surface Water Management Plan(A) Develop Revised Surface Water Management Plan For Area B Based On The Existing Surface Watermanagement Plan For Brrmf And Preliminary Design For Surface Water Management In Area B (See Brrmfmaster Plan).The Final Design Requires Changing The Use Of An Existing Brrmf Drainage Ditch Along Charette Roadfrom Conveying Clean Water To Impacted Water.(B) Prepare Design Drawings And Specifications For The Construction Of Perimeter Drainage Ditchesfor Area B, Based On The Preliminary Design Of Waste Disposal Cells And Revised Surface Watermanagement Plan For Area B.(C) Construction Of The Perimeter Drainage Ditches Shall Be Tendered In The Same Contract As Thewaste Disposal Cell Contract; The Length Of Ditching Tendered For Construction Will Depend Onestimated Price Relative To Available Capital Construction Budget.(D) Prepare Preliminary Design Drawings For The Construction Of &Lsquo;Phased&Rsquo; Internal Drainageditches Within Area B, Based On The Fill Sequencing Plan For Area B And The Revised Surface Watermanagement Plan.D5.1.7 Waste Disposal Cell - Design & Tender(A) Prepare Design Drawings And Specifications To Tender A Contract For The Construction Of Awaste Disposal Cell, Perimeter Leachate Collection System Piping, Drainage Ditches, And A Perimeteraccess Road In Area B.(B) The Waste Disposal Cell Shall Accommodate Two (2) Years Of Waste Disposal Capacity In Area B.Based On An Assumed Large Cell Footprint, The Design Shall Consider A Phased-Use Of The Cell (E.G.Internal Sacrificial Berms) To Manage Leachate Generation.(C) Alternative Leachate Collection System Materials And Designs (E.G. Tire Derived Aggregate)Shall Be Considered To Manage Construction Costs.(D) Prepare An Excavation Plan To Minimize Double Handing Of Soils During Construction (E.G.Excavated Material May Be Used To Construct Berms And Access Road Subgrade).(E) A Class 1 Cost Estimate Is Required At Least Six (6) Weeks Prior To Issuing The Tender Forconstruction.(F) Develop Tender Documents Using City&Rsquo;S Construction Contract Template. The City Will Post Thetender Documents On Merx. The Consultant Will Be Identified As The Contract Administrator In Thetender Documents And Shall Respond To Questions And Prepare Addenda As Required During The Tenderperiod.(G) Assist The City With Tender Evaluations And Provide A Recommendation Towards The Award Of Theconstruction Contract.D5.1.8 Fill Sequencing Plan(A) Develop Quarterly Fill Sequencing Plans For Area B Based On The Preliminary Design Of Area Bdeveloped Under D5.1.3, Current And Projected Tonnages, Current Airspace Utilization (Provided Bythe City), And Required Soil Cover.(B) The Fill Sequencing Plan Will Incorporate And Integrate With The &Lsquo;Phased&Rsquo; Internal Accessroads Developed Under D5.1.5.(C) Fill Sequencing Plan Shall Include Considerations Towards The Management Of Vectors, Odours,Litter, And Adjacent Land Uses.D5.1.9 Contract Administration(A) Provide Contract Administration Services For The Duration Of The Construction Contractawarded Under D5.1.7. Contract Administration Services Will Include Resident And Non-Residentservices In Accordance With The Definition Of Professional Consultant Services (See Appendix C).(B) Resident Services Shall Be Based On The Following Estimated Construction Schedule:(I) Fourteen (14) Weeks Part Time Site Attendance;(Ii) Two (2) Weeks Full Time Site Attendance For Hdpe Liner Installation (If Applicable);(Iii) Four (4) Weeks Full Time Site Attendance For Granular Drainage Blanket Installation;(C) Material Testing During Construction Shall Include Leak Location Testing Of The Hdpe Liner(If Included In The Design).(D) Daily Construction Reports Are Required, Using City Templates. Construction Progress Reportsshall Be Included In Bi-Weekly Construction Meeting Minutes.(E) The City Will Conduct Gps-Based Surveys To Support The Consultant&Rsquo;S Construction Services Onan As-Required Basis.D5.1.10 Post Construction Services.(A) The Consultant Shall Provide Post Construction Services, Including:(I) A Liner Qa/Qc Report For Submission To The Province;(Ii) A Final Construction Report;(Iii) Record Drawings (As Per City Standard) For Submission To The Province Within Six (6)Months Of Substantial Performance;(Iv) Warranty Inspections.D5.1.11 The City Will Provide All Required Surveying Resources And Data For This Project(Design & Construction), Unless Stated Otherwise (E.G., Geotechnical Investigation). However, Theconstruction Contractor Shall Be Assigned Surveying And Layout Tasks Required For Construction.D5.1.12 While The Consultant Will Be Required To Provide Supporting Documentation, Thecity Will Manage All Required Regulatory Correspondence With The Province.D5.2 The Services Required Under D5.1 Shall Be In Accordance With:(A) Appendix C: Definition Of Professional Consultant Services;(B) The City&Rsquo;S Project Management Manual Http://Winnipeg.Ca/Infrastructure/Asset-Management-Program/Templates-Manuals.Stm#2 And Templateshttp://Winnipeg.Ca/Infrastructure/Asset-Management-Program/Templates-Manuals.Stm#4 .Notwithstanding The Foregoing, The Consultant Is Being Engaged By The City For Their Professionalexpertise; The Consultant Shall Bring To The Consulting Contract Administrator&Rsquo;S Attention Anyaspect Of The City&Rsquo;S Project Management Manual Or Templates Which The Consultant Is Of The Opinionis Not Consistent With Good Industry Practice;(C) The Current Environment Act License For The Brady Road Resource Management Facility; And(D) The City&Rsquo;S Computer Assisted Drafting (Cad) - Geographic Information System (Gis) Standardshttps://Legacy.Winnipeg.Ca/Waterandwaste/Dept/CadGis.Stm.D5.3 All Cost Estimates Shall Be In Accordance With The Association For The Advancement Ofcost Engineering (Aace) International Recommended Practice No.18R-97 And The City&Rsquo;S Deliverablesmaturity Assessment Checklist (Dmac) For Class Definition.D5.4 The Funds Available For This Contract Are $750,000.00
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
5b0fbd90-1e24-4f2c-9d96-f122033e088f.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders