Monitoring And Control Services – Evr - Quality Assurance, Approved Monitoring Body (Züs), Expert Services (Awsv, Whg). The Bsr Intends To Build And Operate New Systems At The Mhkw Ruhleben Site As Part Of The “Energy Utilization Ruhleben” (Evr) Implementation Project. In The Future, The Companys Own Electricity Needs And, To A Large Extent, The Plants Internal Heat Needs Will Be Covered By A Regulated Extraction Condensation Steam Turbine Based On The Principle Of Combined Heat And Power. The Steam Turbine System With All The Necessary Auxiliary Equipment And Systems (Turbo Set, Air-Cooled Condenser (Luko), Water-Steam Circuit, Circuit-Condensate Cleaning System And Ve System Will Be Integrated Into A New Machine House To Be Built And Integrated Into The Existing System Of The Mhkw. The Subject Of The The Service Advertised Is The Provision Of Services From An Approved Monitoring Body (Züs), Services To Ensure Quality As Well As Services In The Regulatory Area Of The Awsv And Whg As Part Of The Evr Energy Utilization Ruhleben Project.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.