GTR 79437133

Tenders Are Invited For Execution Of Construction Works Related To The Reconstruction, Renovation And Finishing Of Some Rooms In The Fire Station Of The Volunteer Fire Department Blanowice As Part Of The Task Reconstruction Of Rooms (..) In The Fire Station Of The Volunteer Fire Department Blanowice (..)

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
79437133
Tendering Authority
Subscribe to view
Tender No
WIZP.271.15.2024.KW
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Execution Of Construction Works Related To The Reconstruction, Renovation And Finishing Of Some Rooms In The Fire Station Of The Volunteer Fire Department Blanowice As Part Of The Task Reconstruction Of Rooms (..) In The Fire Station Of The Volunteer Fire Department Blanowice (..)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
06-05-2024 Closed
Work Detail
1. The Subject Of The Order Is: Performance Of Construction Works Related To The Reconstruction, Renovation And Finishing Of Some Rooms In The Building Of The Fire Station Of The Volunteer Fire Department In Blanowice As Part Of The Task Entitled: Reconstruction Of Rooms With Internal Electrical Installation For The Entire Facility And Water And Sewage Installation For The Sanitary Facility In The Fire Station. Volunteer Fire Department In Zawiercie-Blanowice, Together With An Opinion On The Facility In Terms Of Fire Protection.”2. The Subject Of The Order Will Be Carried Out Only Inside The Facility. The Investment Is Located On Plot No. 692/1 [2416021 Zawiercie, 0001 Blanowice], Ul. Olendry, 42-400 Zawiercie. 3. The Scope Of Construction Works Includes The Following Works Inside The Facility: Reconstruction Of Sanitary Rooms [Room 1/14, 2/02, 2/08] And Adapting One Toilet For Disabled People [Room. 2/02] Cleaning Rooms [2/03] And Cloakrooms [2/04] Along With The Construction Of Ventilation Ducts; Widening The Room. Wc [1/02] - Adapting The Dimensions Of A Toilet Intended For Disabled People - Cutting A Hole In The Structural Wall, Installing Steel Lintels, Making A Reinforced Concrete Foundation For The Fire Separation Wall; Reconstruction Of The Sanitary And Cloakroom Facility For Users Of The Fighting Area [Room. 1/05, 1/06] Together With The Construction Of Ventilation Ducts With An Exhaust Fan To The Existing Chimney Passages And The Construction Of Internal Reinforced Concrete Stairs From The Garage Room To These Rooms [Room. 1/04]; Bricklaying Of Partition Walls And Fire Separation Walls, Construction Of Walls In The Plasterboard Wall Structure; Construction Of New Stairs In A Monolithic Reinforced Concrete Structure Meeting The Requirements For Escape Routes In Public Buildings; Demolition Of Existing Internal Stairs; Execution Of Construction Works In Existing Walls In The Form Of Drilling Holes, Widening Openings And Installing Steel And Prefabricated Concrete Lintels; Replacing Internal Joinery - Dismantling Existing And Installing Panel Doors, Fire Doors. Aluminum, Feed Window; Replacing Floors With Ceramic Tiles On Self-Leveling Screed In Rooms According To Project Including The Dismantling Of Existing Floors; Replacement Of Floors On The Ground Along With The Replacement Of The Substructure In Rooms According To Project Including The Dismantling Of Existing Floors; Liquidation Of The Car Duct In The Room. Garage [1/03]; Construction Of A Construction Board For The Designed Internal Stairs; Construction Of New Wall Coverings (Ceramic Tiles, Plasters And Painted Plasters) Along With Preparation Of Walls For The Above-Mentioned Works In The Rooms According To Project; Installation Of System Cassette Ceilings And Plasterboard Ceilings In Rooms According To Project; Construction Of A New Water And Sewage System In The Rooms According To The Design; Installation Of Sanitary Equipment; Purchase And Installation Of An Alarm And Call System For The Toilet For Disabled People On The Ground Floor Of The Building; Implementation Of Visual Signaling In The Form Of Contrast And Warning Tapes. Detailed Scope Of Works Are Specified In The Design Documentation, Technical Specification For The Execution And Acceptance Of Construction Works And The Bill Of Quantities, Which Constitute Annexes To The Terms Of Reference (Hereinafter Referred To As Swz). Attention! The Design Documentation Attached To This Procedure Covers A Wider Scope Of Construction Works In The Zawiercie Volunteer Fire Department Building - Blanowice Than Was Intended To Be Performed Under These Proceedings. As Part Of These Proceedings, The Ordering Party Limited The Scope Of Construction Works To Be Performed In Relation To The Attached Design Documentation Only To The Works Indicated In The Bill Of Quantities.4. Moreover, The Contractors Obligations Related To The Implementation Of The Order Are Also Specified In The Draft Provisions Of The Contract Attached To The Swz, Which Will Be Introduced Into The Content Of The Public Procurement Contract.5. The Prepared Offer Must Be Consistent With The Subject Of The Order, Design Documentation And Technical Specifications For The Execution And Acceptance Of Works.6. Where A Trademark (Brand), Manufacturer, Supplier, Patent, Origin, Source Or Specific Process That Characterizes The Products Or Services Provided By A Specific Contractor Is Indicated In The Swz, Including Design Documentation, Technical Specification For The Execution And Acceptance Of Works Or Other Procurement Documents Or Standards, European Technical Assessments, Common Technical Specifications Or Other References Referred To In Art. 101 Section 1 Point 2 Or Section 3 Of The Act, Public Procurement Law, The Ordering Party In Accordance With Art. 99 Section 5 Of The Public Procurement Law Allows The Submission Of An Equivalent Offer Or In Accordance With Art. 101 Section 4 Of The Public Procurement Act, Offering Solutions Equivalent To Those Indicated In The Documentation, Provided That They Ensure Technical Parameters Not Worse Than Those Assumed In The Documentation And Are Consistent In Terms Of: A) Dimensions And Construction (Size, Type, Physical Properties, Number Of Components ),B) Functional Character (Identity Of Functions),C) Material Characteristics (Type And Quality Of Materials),D) Technical Parameters (Strength, Durability, Technical Data, Structure),E) Safety Parameters Of Use,F) Emission Standards, And Under Provided That The Contractor Proves In Accordance With Art. 101 Section 5 Or 6 Of The Pzp.7 Act. In The Case Of Using Materials, Devices, Products Or Equivalent Solutions Within The Meaning Of Art. 99 Section 5 Or Art. 101 Section 4 Of The Public Procurement Law, The Contractor Is Obliged To Indicate Them In The Offer And To Submit, Together With The Offer, Technical Sheets Or Other Documents Confirming That The Offered Offer/Equivalent Solutions Meet The Requirements Of The Ordering Party Described In The Subject Of The Order. If The Contractor Does Not Submit The Above-Mentioned Documents Or The Submitted Documents Will Be Incomplete (Thus Not Confirming The Equivalence Of The Offer In The Scope Described In The Description Of The Subject Of The Order, The Ordering Party Will Not Request Their Submission/Supplementation).8. If Labels Or Certificates Are Required In The Design Documentation And Stwiorb, The Ordering Party Accepts All Labels Confirming That Given Construction Works, Supplies Or Services Meet The Equivalent Requirements Of The Label Specified By The Ordering Party And Certificates Issued By Equivalent Conformity Assessment Bodies.9. At Each Request Of The Ordering Party, The Contractor Is Obliged To Present Safety Signs For The Indicated Materials, A Declaration Of Conformity Or Technical Approval Or A Certificate Of Compliance With The Polish Standard Transposing European Standards Or The Standard Of The Member States Of The European Economic Area Transposing This Standard Or The Polish Standard In The Absence Of A Polish Standard Transposing This Standard. European.10. Whenever The Technical Specification For The Execution And Acceptance Of Works And Design Documentation Mentions Polish Standards, It Should Be Understood As Polish Standards Transposing European Standards Or Standards Of Other Member States Of The European Economic Area Or Other Standards Or Documents Referred To In Art. 101 Section 1 Point 2 Of The Pzp.11 Act. The Materials And Equipment Used To Perform The Contract Should Meet The Quality Requirements For Products Approved For Trading And Use In Construction Specified In The Act Of July 7, 1994, Construction Law (Consolidated Text: Journal Of Laws Of 2022, Item 1768), The Act Of April 16, 2004 On Construction Products (Consolidated Text: Journal Of Laws Of 2021, Item No. 1213 And The Requirements Of Technical Specifications, Execution And Acceptance Of Works And Swz.12. Before Installing The Materials, The Contractor Will Submit Their Patterns, Technical Cards, Approvals Or Certificates For Approval To The Supervision Inspector Confirming Compliance Of Technical Parameters With The Design Documentation. 13. The Valid Form Of Remuneration Is The Cost Estimate. Due To The Cost Estimate Nature Of The Remuneration For The Execution Of The Subject Of The Order, The Settlement Of The Works Will Be Based On The As-Built Cost Estimate, I.E. The Actual Measurements Of The Works Performed. 14. The Contractor Is Obliged To Provide A Warranty For The Subject Of The Contract For A Period Of Not Less Than 36 Months From The Date Of Final Acceptance Of The Works.15. The Warranty Period For The Subject Of The Order Is 60 Months.16. Obligation To Employ Under An Employment Contract. In Order To Fulfill The Obligations Specified In Art. 95 Of The Public Procurement Act, The Ordering Party Requires That, As Part Of The Implementation Of The Contract, Activities Directly Related To The Subject Of The Contract Falling Within The So-Called Direct Costs Resulting From The Bill Of Quantities Attached To The Swz Were Performed By Persons Employed Under An Employment Contract In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code (Consolidated Text, Journal Of Laws Of 2023, Item 1465, As Amended), Regardless Of Whether The Work Will Be Performed By The Contractor, Subcontractor Or Further Subcontractor (So-Called . Manual Workers). This Requirement Does Not Apply To, Among Others: Persons Managing Construction Or Works, Persons Performing Transport Services, Suppliers Of Construction Materials, Equipment, Devices, Surveying Services, Natural Persons Running A Business, Incumbent Members Of The Contractors Management Or Supervisory Bodies, Partners Of A General Partnership Or Partnership To The Extent To Which They Will Personally Perform Works For The Ordering Party Or The Contractor. The Requirements Regarding The Method Of Documenting The Employment Of People Under An Employment Contract, The Ordering Partys Control Rights And Sanctions For Not Employing People Under An Employment Contract Are Specified In Detail In The Draft Contractual Provisions Constituting An Annex. No. 4 To Swz. Due To The Garden Number Of Characters, Continued In Section Ix Other Information.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
f3145f11-6aca-4715-8bc5-32ed5a8c8c79.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders