Tenders Are Invited For Renovation Of The Feeding Block At Kindergarten No. 201 At Ul. Wilczy Dół 4 In Warsaw.

Tender Detail

79391788
34/WZP/2024
Self-Funded
Tenders Are Invited For Renovation Of The Feeding Block At Kindergarten No. 201 At Ul. Wilczy Dół 4 In Warsaw.
ICB
central europe
European Union
30-04-2024

Work Detail

The Subject Of The Order Is The Renovation Of The Feeding Block At Kindergarten No. 201 At Ul. Wilczy Dół 4 In Warsaw. Kindergarten Building No. 201 At Ul. Wilczy Dół No. 4 In Warsaw Has Been Fully Qualified For Renovation. The Electrical And Sanitary Installations Need To Be Replaced And The Walls And Floors Need To Be Renovated. The Order In Question Concerns Only Renovation Works In The Rooms Of The Feeding Block, Which Were Planned On The Basis Of The Inspection And Assessment Of The Technical Condition Of The Rooms Intended For Renovation. During The Above-Mentioned The Inspection Revealed: - Defective Drainage Troughs In The Floor Of The Kitchen Proper (Linear Drainage Troughs Not Intended For Kitchen Rooms), - Destruction Of Ceramic Floor Coverings Around The Drainage Troughs, - Destruction And Losses Of Ceramic Coverings Of Walls And Floors, - Corrosion Of Door Frames And Swelling Of Door Leaves As A Result Of The Impact Of Moisture, General Significant Technical Wear And Tear Of The Finishing Elements Of The Rooms. Scope And Technology Of Execution Of The Works. The Works To Be Performed Include The Renovation Of The Feeding Block Together With The Kitchen, Dishwashing Room, Food Preparation And Kitchen Facilities In The Following Scope: A) Tight Separation Of The Area Carrying Out Renovation Works Due To The Active Part Of The Facility (Educational Facility), B) Disassembly Of Kitchen Equipment Along With Removal To A Separate Room And Securing It, And Reassembly After Renovation. The Valuation Should Include All Materials Necessary To Reconnect Devices And Equipment (Valves, Fittings, Hoses, Cables, Etc.), C) Disassembly Of Equipment Elements (Soap Dispensers, Handles, Dryers, Etc.), Along With Disconnection Of Kitchen And Sanitary Equipment, D) Dismantling Of Ceramic Wall Coverings, E) Dismantling Of Floor Coverings, F) Partial Dismantling Of Casings Of Installation Risers Made Of Plasterboards, G) Dismantling Of Internal Door Joinery With Frames In Kitchen, Storage And Sanitary Rooms And Social Facilities, H) Dismantling Of Grate Approaches And Drainage Troughs, I) Disassembly And Reassembly Of Ventilation Grilles, Circular Diffusers, J) Blinding (Protection) For The Duration Of Renovation Of Channel Inlets After Dismantling Grilles And Various Sizes Of Diffusers, K) Dismantling Of Service Windows With Concrete Terrazzo Window Sills, L) Dismantling And Reassembly Of Internal Lighting Fixtures And Electrical Installation Accessories (Fluorescent Fixtures, Emergency And Evacuation Lighting, Installation Connectors, 2-Pole Flush-Mounted Plug Sockets With Grounding In Boxes, Led Lighting Fixtures, Minimum Required: Lp42, Ugr 22, Illuminance W 500Lux, Assembly Single-Pole Bakelite Splash-Proof Connectors),M) Disassembly Of Worn-Out Cast Iron Radiators With Valves,N) Disassembly And Reassembly Of New Sanitary Equipment In The Back-Up Rooms, I.E.: Approaches For Grates And Drainage Troughs, Draw-Off Valves, A Sink For A Bucket, Standing Taps, A Shower Tray, Washbasins , Compact Toilet Seats,O) Disassembly And Reassembly Of The Hood In The Dishwashing Room,P) Installation Of An Inverter For The Ventilation Installation Of Kitchen Hoodsq) Disassembly And Reassembly Of Steel Sheet Ventilation Ducts In The Kitchen Room R) Replacing Roller Blinds In Two Serving Windows,A ) Mechanical Cutting Of Grooves For Recessed Cables In The Brick - For Installation Cables After Dismantled Electrical Installation Strips, Installation Of Sockets For Connecting Devices, B) Scraping And Washing Off Old Paint From The Surface Of The Ceiling And Walls, C) Removing Rubble And Materials From Demolition, D) Leveling Ceiling Surface (Floor) For The Application Of Insulating Layers, E) Underfloor Waterproofing On The Ceiling Made Of Kmb Bituminous Masses, Including The Implementation Of Sealing Collars, F) Sealing Of Pipe Penetrations And Sewage Systems When Exposed To Moisture Using Kmb Bituminous Mass In A Concrete Base, G) Execution Flooring Layers, Leveling Layers Sharply Troweled Under Floors Made Using Miksokret, H) Execution Of Horizontal Moisture-Proof Insulation Using Foil And Sealing Slurries Applied Manually On A Leveled Substrate Up To The Height Of The Tiles, I.E. 2.00 M, I) Execution Of Drainage Approaches For Grates And Troughs Sewage,J) Installation Of Stainless Steel Grates And Drainage Troughs With Drain Along With The Material (Grid And Basket),K) Installation Of Window Joinery (Serve Windows, 2 Pieces) Together With Window Sills/Counters Made Of Acid-Resistant Stainless Steel,L) Installation Of Internal Joinery Door (Pcs. 22) - Measurement Of Doors Should Be Made By Nature, M) Execution Of Wall Coverings With Ceramic Tiles (Walls, Plinths), N) Execution Of Floor Coverings With Ceramic Tiles, Tile Abrasion Class Min. 5, Thickness Min. 8 Mm, Anti-Slip Class Min. R11 (Be Careful About Slopes Towards Drainage Channels), O) Construction Of Plasterboard Casing For Installation Pipes In All Rooms, Including Installation Of Inspection Doors And Ventilation Grilles In The Casings, P) Repair Of Damaged Plaster Coatings On The Surface Of The Ceiling And Walls, Q) Painting Of Walls And Ceilings In The Feeding Block Rooms With Latex Paints (Painting Materials With A Certificate Allowing For Use In Mass Catering Rooms),R) Painting The Walls Twice With Polyurethane Varnish Up To The Height Of The Paneling,S) Painting Visible, Unbuilt Installation Pipes Twice With Oil Paint,T) Replacing The Floor In The Room (Intendent) Made Of Plastic Roll Coverings With An Insulating Layer Along With The Installation Of Polyvinyl Chloride Wall Strips,U) Double Painting Of The Cement Floor Surfaces In The Utility Room With Epoxy Paints,V) Protection Of Convex Corners With Aluminum Angles,W) Installation Of Plastic Pipelines About Welded Connections On Internal Walls Along With Inlet Connections, Valves With Hose Nozzles, Malleable Cast Iron Tees, Branching Of The Gas Installation To Devices, Two-Way Gas Ball Valve - At Devices), X) Installation Of Sanitary Devices (Porcelain Washbasins With Siphons, Under-Basin Valves , Standing Washbasin Or Dishwasher Taps, Porcelain Pedestals, Toilet Bowls, Plastic Shower Tray),Y) Installation Of New Double-Plate Steel Radiators With Valves - Radiators In A Hygienic Version,Z) Installation Of Supporting Structures Screwed To The Ceiling - Structure To Stabilize The Water Installation And Gas,Aa) Checking And Measuring The Complete 1; 2; 3-Phase Low Voltage Electrical Circuit,Bb) Installation Of Equipment (Soap Dispensers, Towel Containers, Paper Containers, Handles, Dryers, Etc.),Cc) Connection Of All Kitchen And Sanitary Equipment.S) Demolition, Preparatory And Cleaning Works Inside The Building; Before Commencing Direct Renovation Works, Preparatory Work Should Be Taken Into Account In The Rooms Being Renovated. In The Rooms Of The Entire Feeding Block, All Necessary Disassembly And Protection Of Equipment Elements Requiring Disassembly Should Be Carried Out, Along With Moving Them To The Place Indicated By The Ordering Party. Their Protection Should Be Taken Into Account For The Duration Of The Works And Their Reassembly After The Renovation Is Completed. The Area Where The Works Are To Be Carried Out Should Be Tightly Separated From Rooms Not Intended For Renovation Due To The Active Part Of The Facility (Educational Facility). Social Clauses: 1) In The Proceedings In Question, The Ordering Party Applies A Social Clause Pursuant To Art. 95 Section 1 Of The Act Of September 11, 2019 Public Procurement Law. 2) The Contractor Undertakes To Ensure That Activities Related To The Execution Of The Construction Works Contract, Throughout The Period Of Performance Of The Subject Of The Agreement, Will Be Performed By Persons Employed Under An Employment Contract Within The Meaning Of The Labor Code By The Contractor Or Subcontractor. 3) The Condition Referred To Referred To In Section 2 Will Be Met By Employing New Employees Under An Employment Contract Or Appointing Already Employed Persons To Perform The Order In The Field Of Construction Works, Including In Particular Preparatory And Dismantling Works, Sanitary, Electrical And Finishing Works.4) Detailed Employment Requirements Based On Employment Relationship, In The Circumstances Referred To In Art. 95 Of The Public Procurement Law Are Included In The Draft Provisions Of The Contract Constituting Annex No. 2 To The Swz. A Detailed Description Of The Subject Of The Order Is Specified In: Designed Provisions Of The Contract - Annex No. 2 To The Swz; Description Of The Subject Of The Order - Annex No. 5A To The Swz; Work Execution Technology - Annex No. 5B To The Swz; Work Organization Plan - Annex No. 5C To The Swz;  Technical Specification For The Execution And Acceptance Of Works - Annex No. 5D To The Swz; Bill Of Quantities - Annex No. 5E To The Swz; Template Of Information Materials - Annex No. 5F To The Swz;

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail