GTR 79391672
Tenders Are Invited For Insulation Of The Facade Of Building No. 2 Along With Partial Replacement Of Windows In The Facility At Ul. Lompy 10A In Chorzów
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
79391672
Tendering Authority
Subscribe to view
Tender No
ZP.26.1.4.2024.TP
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Insulation Of The Facade Of Building No. 2 Along With Partial Replacement Of Windows In The Facility At Ul. Lompy 10A In Chorzów
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
02-05-2024
Closed
Work Detail
Functional And Spatial Solutionsthe Building Is Intended For Social Purposes (Locker Rooms, Baths) And Belongs To The Group Of Public Utility Facilities. A Building With Box Architecture. The Shape Of The Building Is Multi-Body. The Individual Elements Of The Building Constitute One Whole On A Plan With Dimensions Of ~50 X 8 M. (Basement Approximately 20 M Long, First Floor Cube Measuring ~12 X 10 M) A Building Of Traditional Construction, Brick. Roofs Covered With Thermally Weldable Felt. Sheet Metal Flashings Made Of Galvanized Sheet Metal. Mostly White Pvc Joinery - Good Condition, Partly Old Aluminum, Single One - To Be Replaced - Room On The First Floor. Scope Of Work: Dismantling Of The Lightning Protection System, Gutters And Downpipes And Other Treatments Dismantling Of The Old Roof Covering Demolition Closed Chimney Demolition Of The Ramp At The Back Of The Building Replacement Of Old Aluminum Windows With New White Pvc Windows With U-Value = 0.9 Earthworks - Exposure Of Basement And Foundation Walls Insulation Of Basement And Foundation Walls (Styrofoam + Dimple Foil) Execution Insulation Of External Walls With Polystyrene Foam 10Cm Roof Insulation With Thick Polystyrene. 10Cm Covering The Roof With A Layer Of Thermally Weldable Felt Installation Of Gutters, Downpipes And All Sheet Metal Flashings Installation Of A Lightning Protection System Construction Of A Band Around The Building Construction Of A Fence In A Panel System The Area Around The Building After The Completion Of The Works Should Be Tidied Up And Restored To Its Original Condition. Before Starting The Works The Contractor Will Develop: - A Health And Safety Plan (Bioz Plan), A Detailed Description Of The Subject Of The Order Is Included In The Annexes To The Swz, Which Constitute Its Integral Part, I.E.: - Bill Of Quantities - Illustrative - Specifications Of The Technical Execution And Acceptance Of Construction Works - Description Of The Subject Of The Order. Has An Ornithological Opinion On The Nesting Of Protected Species, With Particular Emphasis On Birds And Bats, In The Building Where Renovation Works Will Be Carried Out. The Opinion Shows That No Breeding Habitats Of Protected Species Have Been Found In The Building - The Opinion Is Attached - Annex No. 13.3. The Offer Must Include All Additional Costs Related To The Implementation Of The Scope Of The Task Covered By The Bill Of Quantities, Such As Preparation Of The Work Site, Organization Of Work Facilities, Tidying Up The Area After Completion Of The Works And Securing It During The Works Until The Investment Is Handed Over To The Ordering Party.4. The Quality Of Materials And Works Should Be Tested And Monitored On An Ongoing Basis During The Execution Of The Works And After Completion (If Applicable). The Results Of All Tests And Inspections Should Be Included In The Protocols Attached To The Acceptance Documentation. The Cost Of Testing And Inspection Will Be Borne By The Contractor.5. The Works Must Be Made Of Materials Provided By The Contractor In Accordance With The Technical Specification For The Execution And Acceptance Of Construction Works, Applicable Standards And Technical Conditions For The Execution And Acceptance Of Works. The Contractors Obligation Is To Provide The Required, Up-To-Date Approvals And Certificates Of All Materials And Devices Used. 1) If The Description Of The Subject Of The Order Indicates Any Trademark, Patent Or Origin, Source Or Specific Process That Characterizes The Products Or Services Provided By A Specific Contractor, It Should Be Assumed That The Ordering Party Provided Such A Description In Order To Determine The Minimum Parameters That The Products Must Meet In Order To Meet The Requirements Set By The Ordering Party And They Constitute Only A Quality Standard Of The Subject Of The Order. The Ordering Party Allows Equivalent Products Provided That The Subject Of The Offer Is Functionally Identical And As Close As Possible In Terms Of Structure, Materials And Dimensions To The Sample Products. A Contractor Who Refers To Equivalent Solutions Is Obliged To Attach To The Offer A List Of Substitute/Equivalent Materials/Goods Along With Their Parameters. The Contractor Must Prove To The Ordering Party That The Proposed Material, Product, Technology Or Solution Is Equivalent By Presenting All Documents, Calculations, Opinions, Etc. . Confirming Equivalence. 9. The Contractor Is Obliged To Perform Construction Works In Accordance With Construction Practice, Applicable Laws And Standards, And In Compliance With Occupational Health And Safety And Fire Protection Regulations. The Contractor Also Guarantees The Execution Of The Subject Of The Order Under The Supervision Of Persons With The Required Professional Preparation To Perform Independent Technical Functions In Construction.10. The Ordering Party Informs That Construction Works Will Take Place At An Active Sports Facility. During Construction Works, The Contractor Must Secure The Work Area And Provide Access To The Rooms In The Building.12. Pursuant To Art. 95 Section 1 Of The Public Procurement Law, The Ordering Party Requires The Contractor, Subcontractor Or Further Subcontractor To Employ Persons Performing All Activities Included In The So-Called Direct Costs Under An Employment Contract In The Scope Of Order Execution, If The Performance Of These Activities Involves Performing Work In The Manner Specified In § 1 Of Art. 22 Of The Act Of June 26, 1974 - Labor Code (Journal Of Laws Of 2020, Item 1320) And Covers The Following Types Of Activities: Construction Works [Activities Specified In Detail In The Bill Of Quantities],
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
3cbf4cf6-7a75-4f2c-8266-c45cffaea003.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.