Renovation Of Basements After Flooding In The Building Of The Zus Inspectorate In Kutno, Ul. Jagiełły 12. The Required Features Of The Construction Works Are Described In The Design Documentation (Bills Of Quantities, Plan Of The Buildings Basement And Drawing No. Is 48 Months. The Quality Warranty Period Begins On The Day The Final Acceptance Report Is Signed. A Detailed Description Of The Subject Of The Order Is Attached As Annex No. 12 To The Swz (Design Documentation And Stwiorb).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.