Tenders Are Invited For Extension Of District Road No. 1509D In Ul. Wądoły On The Section From Ul. Moniuszki To Ul. Energy

Tender Detail

79307768
ZP.261.2.2024
Self-Funded
Tenders Are Invited For Extension Of District Road No. 1509D In Ul. Wądoły On The Section From Ul. Moniuszki To Ul. Energy
ICB
central europe
European Union
30-04-2024

Work Detail

1. The Subject Of The Order Is The Expansion Of The District Road 1509D Ul. Wądoły On The Section From Ul. Moniuszki To Ul. Energetyczna In Oleśnica.2. The Task Is Implemented With Co-Financing Under The Investment Financing Program From The Governmental Polish Governance Fund: Strategic Investment Program No. Edycja8/2023/4445/Polskilad.3. Scope Of The Order: 1) The Scope Of The Order Includes The Reconstruction And Expansion Of District Road No. 1509D Ul. Wądoły On The Section From Ul. Moniuszki To Ul. Energetyczna In Oleśnica. The Length Of The Designed Road Section Is Approx. 257.74 M. The Beginning Of The Study Is Located On The Edge Of Municipal Road No. 102555D - Ul. Energetyczna, End Of Development On The Edge Of The Newly Rebuilt Viaduct Over The Railway Line. As Part Of The Investment, The Section Of Municipal Road No. 102555D - Ul. Is Also Subject To Reconstruction. Energetyka With A Length Of Approx. 147 M, Including: - Reconstruction Of The Road; - Construction Of A Sidewalk; - Construction Of Bicycle Paths (One-Way And Two-Way); - Construction Of Bus Bays; - Reconstruction Of Individual Exits; - Reconstruction Of Public Exits; - Construction Of A Rainwater Drainage System; - Reconstruction Of A Section Of The Storm Sewage System With An Outlet To A Drainage Ditch; - Reconstruction Of Culverts Located On The Drainage Ditch; - Reconstruction Of The Sanitary Pressure Sewage System; - Reconstruction Of The Water Supply Network; - Reconstruction Of Road Lighting; - Construction Of Lighting For Pedestrian Crossings; - Reconstruction Of The Electricity Network; - Construction Of A Technological Channel; - Cleaning Works. - Marking.2) The Scope Of The Investment Will Include The Following Plots: - 021407_1 Ol E Ś N I C A – M I A S T O B R Ę B 0004 Wą D D O Ł Y, Am 85, Dz. No. 2*- 021407_1 O L E S N I C A – M I A S T O B R Ę B 0004 Wą D D O Ł Y, Am 85, Oj. No. 1/6- 021407_1 O L E S N I C A – M I A S T O B R Ę B 0004 Wą D O Ł Y , Am 85, Oj. No. 1/2- 021407_1 O L E S N I C A - M I A S T O B R Ę B 0004 Wą D O Ł Y , Am 85, Oj. No. 26*- 021407_1 O L E S N I C A – M I A S T O B R Ę B 0004 Wą D O Ł Y , Am 85, Oj. No. 1/8*- 021407_1 O L E S N I C A – M I A S T O B R Ę B 0004 Wą D D O Ł Y, Am 85, Oj. No. 1/7- 021407_1 O L E S N I C A – M I A S T O B R Ę B 0004 Wą D O Ł Y , Am 85, Oj. No. 3*- 021407_1 O L E S N I C A – M I A S T O B R Ę B 0004 Wą D D O Ł Y, Am 85, Oj. No. 9- 021407_1 O L E S N I C A – M I A S T O B R Ę B 0004 Wą D D O Ł Y, Am 85, Oj. No. 11- 021407_1 Ol E Ś N I C A – M I A S T O B R Ę B 0004 Wą D D O Ł Y, Am 85, Oj. No. 8/1- 021407_1 O L E S N I C A – M I A S T O B R Ę B 0004 Wą D O Ł Y , Am 84, Oj. No. 7- 021407_1 Ol E Ś N I C A – M I A S T O B R Ę B 0002 Ol E Ś N I C A, Am 73, Oj. No. 1/4**- 021407_1 O L E S N I C A – M M I A S T O B R Ę B 0002 O L E S N I C A , Am 75, Oj. No. 5/1*** - Plot Subject To Division** - Closed Area (Pkp)3) The Basic Scope Of The Investment Includes The Following Works: Road Industry Preparatory And Demolition Works - Measurement Works On Linear Earthworks - Road Route In Plain Terrain 437 M - Milling Bituminous Surface 2,537 M2 - Demolition Of The Existing Surface Made Of Concrete Materials 184 M2 - Demolition Of The Existing Surface And Substructure Made Of Stone Cubes 1,349 M2 - Demolition Of Curbs 1,030 M2 Earthworks And Accompanying Works: - Excavations 2,088 M3 - Forming And Compaction Of Embankments 3,592 M3 Works Construction And Surface:  Soil Stabilization 4994 M2  Foundation Made Of Unbound Mixture Thick. 15, 20 Cm 4406 M2 - Concrete Base - Bays 258 M2 - Base Made Of Mineral-Bitumen Mixture 2110 M2 - Surface Made Of Mineral-Bituminous Mixture 2782 M2 - Surface Made Of Concrete Cubes 16/16 258 M2 - Surfaces Made Of Concrete Paving Stones 8 Cm Thick - Sidewalk 898 M2 - Surface Made Of Mineral-Bituminous Mixtures - Bicycle Path 1043 M2 - Curbs 905 M - Edges 1228 M Greenery - Clearing Of Greenery 1 Set - Construction Of Carpet Lawns 2829 M2 Other Works - Construction Of All Road Safety Barriers - Barrier Rails (Energy-Absorbing) 1 Set .Traffic Organization  Implementation Of Temporary Traffic Organization 1 Set.  Taking Into The Field The Approved Permanent Traffic Organization Design (Including Thick-Layer Horizontal Markings) 1 Set. Electrical Industry - Lighting Construction  Earthworks 191 M3  Disassembly Of Lighting Poles And Fixtures 10 Pcs. Laying Multi-Core Cables 395 M, Installation Of Lighting Poles - 6 M Pole, 3 Pcs., Assembly Of Lighting Poles - 7 M Pole, 14 Pcs., Installation Of Lighting Fixtures 19 Pcs., Necessary Measurements Of The Power Grid, 1 Set. Sanitary Industry - Rainwater Drainage. Demolition Works - Dismantling Of Culverts. At Wed. 30 Cm 10.8 M - Dismantling Of Concrete Pipelines. Cup Sizes On Wed. Nominal 500 -600 Mm 128 M - Disassembly Of Inspection Wells From Concrete Rings 1200 Mm 2 Pcs. Earthworks - Earthworks 1214 M3 Inspection Wells And Street Inlets - Inlet With Sedimentation Tank 18 Pcs. - Wells 1000 8 Pcs. - Wells 1200 4 Pcs. Separator Of Petroleum Substances, 1 Set - Cleaning Well With A Stainless Steel Screen, Diameter 800 Mm, 3 Pcs. Rainwater Channels - Channels Made Of Pvc Pipes 160 85 M - Channels Made Of Pvc Pipes 250 156 M - Channels Made Of Pvc Pipes 315 143 M - Channels Made Of Pvc 500 Pipes 108 M Channels Made Of Pvc 600 Pipes 19.5 M Retention And Depressurization Tank 1 Set Reconstruction Of Culverts 11 M Reinforced Concrete Abutment Walls 5 Pcs. Prefabricated 9 Pcs. Greenery  Planting Trees And Bushes 7391 Pcs.  Construction Of A Flower Meadow By Sowing 1858 M Other  Disassembly And Construction Of The Fence In The Scope Of Permanent Occupation Of Plot No. 85.26 Wądoły District 1 Set  Disassembly And Construction Of The Fence In The Scope Of Permanent Occupation Of Plot No. 85.1/ 8 Wądoły District 1 Set 4. Additional Conditions: 1) All Elements Included In The Descriptive Part But Not Shown In The Drawings And Shown In The Drawings But Not Included In The Descriptive Part Of The Specification Should Be Treated As If They Were Included In Both.2) The Contractor Is Obliged To Perform Control Measurements Before Commencing Construction Works. In Terms Of Situation And Altitude. In The Case Of A Utility Network, The Elevations At Conflicting Crossings Along The Entire Length Of The Designed Network Should Also Be Checked. 3) Before Cutting Down The Trees To Be Removed Within The Scope Specified In The Design Documentation In Order To Limit The Cutting, The Contractor Will Qualify The Trees Necessary For Removal And Present Them To The Ordering Party For Approval. Tree Removal Is Possible After Obtaining The Employers Approval. 4) The Contractor Will Install Control Benchmarks And Conduct Geodetic Monitoring Of The Works Performed. 5) The Contractor Will Make A Detailed Inventory Of The Technical Infrastructure In The Work Area, Including The Execution Of Manual Inspection Trenches In Order To Avoid Damage To The Network And Devices. 6) In The Event Of Any Discrepancies Between The Location In The Plan And The Height Elevations Of The Designed Elements In Relation To The Existing Condition Determined According To The Map For The Purposes Of Design, The Contractor Is Obliged To Immediately Notify The Investor In Order To Enable Possible Correction Of The Design Solutions By The Authors Supervision. 7) Resolution Of Possible Collisions Should Be Carried Out Under The Supervision Of Utility Users. 8) After Completion Of The Works, Technical And Geodetic Acceptance Should Be Carried Out, Including With The Owners Of Individual Networks, And The Contractor Is Obliged To Prepare As-Built Documentation.5. The Detailed Scope Of The Task And Obligations Of The Parties Are Specified In: 1) Design Documentation (Appendix No. 8 To The Swz), 2) Technical Specification For The Acceptance And Execution Of Construction Works (Stwiorb) (Appendix No. 9 To The Swz), 3) This Swz, 4) Draft Contract (Appendix No. 7 To The Swz), 5) Bill Of Quantities (Appendix No. 10 To The Swz). Two Bills Of Quantities Have Been Attached, The Contractor Is Obliged To Evaluate Both Scopes. The Ordering Party Informs That The Bills Of Quantities Are Only Of Auxiliary Nature. The Offer Should Price All Works Included In The Design Documentation, Which Is An Annex To The Procedure, As Well As The Works Described In The Description Of The Subject Of The Order.

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy