Tenders Are Invited For Structural Steelworks – New Building Climate Chamber Center At The Mpi For Molecular Plant Physiology In Potsdam - Steel Construction Work
ICB — International Competitive Bid
Closed
Western Europe
Tender Information
GTR Reference
79283191
Tendering Authority
Subscribe to view
Tender No
221802-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Structural Steelworks – New Building Climate Chamber Center At The Mpi For Molecular Plant Physiology In Potsdam - Steel Construction Work
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union,G20
Last Date of Bid Submission
23-05-2024
Closed
Work Detail
Structural Steelworks – New Building Climate Chamber Center At The Mpi For Molecular Plant Physiology In Potsdam - Steel Construction Work. Steel Hall Construction Made Of 6,369 Kg Purlin Ipe 180, 3,934 Kg Steel Frame Ipe 300, 5,222 Kg Steel Frame Ipe 400, 8 Haunched Frame Corners, 4,029 Kg Steel Beam Ipe 500, 1,498 Kg Steel Support Hea 200, 674 Kg Steel Support Ipe 330, 4,687 Kg Steel Support Heb 200, 1,903 Kg Steel Beam Hea 200, Approx. 250 Kg Wall Bracing, 688 Kg Roof Bracing; 17,553 Kg Steel Beam Ipe 240, 8,100 Kg Steel Beam Ipe 500, Approx. 327 M² Gratings, 120 Folding Gratings, 615 M² Roof Covering Sandwich Panels Including Connection Plates, 8 Pieces Rwa Light Dome Incl. Control Unit, Rain Alarm System; Approx. 831 M² Facade Cladding Sandwich Panels Including Connection Plates, Steel External Staircase Made Of 35 Kg Steel Support Hq80-4, 152 Kg Cantilever Arm Ipe 200, 5900 Kg Stairwell, 2 Pcs Landings, Approx. 64 Pcs Grating Steps. Approx. 8 Pieces Of Horizontal/Vertical Railing, 85 Kg Support Foot, 277 Kg Cheeks; 4 Pcs Climbing Ladders, 55 M Maintenance/Access System + Rope Safety System, 9 M Maintenance/Access System With Railing On One Side, 4 M Maintenance/Access System With Railing On Both Sides, Hall Railing Made Of 895 Kg Railing Posts, 460 Kg Knee Rail, 378 Kg Baseboard, 395 Kg Round Rods , 160 M Handrail, 176 Pcs Handrail End Caps; 55 M Overhead Rail Safety System. The Execution Must Begin: Within 12 Working Days After Receipt Of The Request From The Client (§5 Para. 2 Sentence 2 Vob/B); The Request Will Come To You In Advance. To Be Received By December 13Th, 2024. The Service Must Be Completed (Ready For Acceptance): Within 46 Working Days Of The Deadline Specified Above For The Start Of Execution. Working And Rest Times On The Construction Site, See Other Special Contractual Conditions (Wbvb). “Special Note Regarding Bidding Questions Due To Special External Events (E.G. Sars-Cov-2 Or Ukraine War): When Preparing Your Offer, Please Take Into Account Any Possible Or Recognizable Impairments, E.G. With Regard To The Availability Of Materials And Products, Workers, A Possible... . Delayed Provision Of Required Evidence, Effects On Any Subcontractors, Etc. We Ask That Any Questions That Arise In This Context Be Asked In Good Time Before The Offer Deadline Via The E-Procurement Messaging System.”
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
142408a6-0b3a-43fa-a500-71d865b4a952.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.