Replacement V/A-Skogbrukets Hus . : __________The Client Is Planning To Replace The Waste Water And Storm Water Pipes In The Area By The Forest Services House, At The Same Time We Will Take The Water Pipe That We Pass With Us. The Wires Are To Be Replaced From The Underside Where They Cross The Old E6 Fagerlidal Road And All The Way Down To Where They Cross The Current E6. The Replacement Stops Just Before The Crossing Of The E6 As The Cables Are Under A Concrete Cover Under The E6. The Replacement Starts Again Directly On The Underside Of E6 And Up To A Basin To Be Replaced. Existing Lines Are Uncovered To Enable Connection To The New Sump, And The Replacement Stops At This Sump Sp4. Existing Sumps And Lines Must Be Excavated And Rehabilitated And New Sumps Delivered And Installed. Existing Lines Must Be In Operation Under The Plant, Or Be Temporarily Re-Routed.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.