GTR 79224721
Tenders Are Invited For Modernization Of The Facade Of The City Palm House In Gliwice - Pavilion No. Ii Cacti And Succulents
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
79224721
Tendering Authority
Subscribe to view
Tender No
MZUK-EPZ.50.21.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Modernization Of The Facade Of The City Palm House In Gliwice - Pavilion No. Ii Cacti And Succulents
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
26-04-2024
Closed
Work Detail
The Subject Of The Order Is The Modernization Of The Walls Of The Facade Of The Cacti And Succulents Pavilion Of The Municipal Palm House In Gliwice - Pavilion No. Ii. The Order Includes The Replacement Of All Wall Panels With Polycarbonate Panels, The Replacement Of Window Frames And The Vestibule, As Well As The Modernization Of Ladders, Technical Platforms And The Renovation Of The Internal Plinth. / External Scope Of Works: Security And Demolition Works: 1. Protecting Plants With Foil.2. Securing The Façade With White Mesh For The Duration Of The Works.3. Dismantling Of The Facade Covering And Vestibule.4. Dismantling The Transom And Gusset Plates.5. Mechanical Cleaning To The 3Rd Degree Of Cleanliness Of Grid Structures And Nodes.6. Waste Collection And Disposal. Facade Works:1. Painting Structure Nodes With Primer, Intermediate And Topcoat Paint.2. Installation Of An Aluminum Supporting Structure For The Installation Of Polycarbonate Façade Panels.3. Construction Of The Façade Casing From Polycarbonate Panels, With Window Frame Filling.4. Installation Of Structures And Window Opening Mechanisms.5. Installation Of Sheet Metal Flashings At The Top Of The Walls.6. Installation Of Vestibule And Door Joinery. Platforms And Ladders:1. Dismantling Of Working Platforms And Steel Ladders.2. Sandblasting, Strengthening, Hot-Dip Galvanizing And Reassembly Of Ladders And Platforms.3. Delivery And Assembly Of A Mountaineering Rail System For Specialized Works. Renovation Of The Plinth, Sealing Of The Connector Roof: 1. Hydro-Sandblasting Of The Concrete Plinth, Removal Of Loose Fragments, Cleaning Of The Substrate.2. Anti-Corrosion Protection Of Exposed Reinforcement And Reprofiling Of The Concrete Substrate.3. Filling Concrete Surfaces And Protecting The Surface With Glaze Paint.4. Complementing Titanium Zinc Sheet Metal Flashings.5. Reprofiling Of The Internal Plinth With Epoxy Filler And Painting With Epoxy Paint. An Integral Part Of This Specification Are:1. Construction And Executive Design For The Reconstruction And Renovation Of The Facade Of The Cacti And Succulents Pavilion - The Municipal Palm House In Gliwice (Documentation For Pavilion Ii).2. Technical Specification For The Execution And Acceptance Of Construction Works - General And Detailed Requirements.3. Bill Of Quantities: Modernization Of The Wall Covering Of The Municipal Palm House In Gliwice - Pavilion Ii - Cacti And Succulents. Note: All Components Of The Documentation Constitute A Complete Set. The Bill Of Quantities Is Only Of Auxiliary Nature. When Preparing The Tender Offer And Implementing The Subject Of The Order, All Elements Of The Documentation And Comments From The Swz Should Be Considered Together. Important Conditions Of The Order: 1. All Components Of The Documentation, I.E. Technical Description, Drawing Part, Technical Specification And Bill Of Quantities, Constitute A Complete Set. When Preparing A Tender Offer And Implementing The Subject Of The Contract, All Elements Of The Documentation Should Be Considered Together. The Valuation Bases Provided In The Bill Of Quantities Are Not Binding For The Contractor.2. To Perform The Works, Materials Specified In The Technical Specification Or Equivalent Should Be Used, Comparable In Terms Of Strength, Technical And Quality Parameters, Adhesion To The Substrate, Chemical Composition, Durability, Warranty And Intended Use, Having Current Certificates And Approvals As Well As Declarations Of Compliance With The Polish Standard Or Technical Approval. .3. The Bidder Should Include In The Offer All Costs Resulting From The Organization Of Works And The Construction Site, Industry Supervision, Transport, Etc.4. Final Acceptance Will Be Carried Out By A Committee Appointed By The Ordering Party. The Committee Will Assess The Quality Of The Works Performed On The Basis Of The Submitted Documents, Visual Assessment And Compliance Of The Works With The Design, Technical Specifications And Bill Of Quantities.5. During The Implementation Of The Works, The Contractor Is Obliged To: - Carry Out The Works Under The Supervision Of A Person With Appropriate Construction Qualifications, - Constantly Maintain Law And Order On The Construction Site, - Manage Waste Generated During The Performance Of The Works In Accordance With Applicable Regulations In This Regard, - Marking And Appropriate Securing Materials Necessary To Perform The Works, - Ongoing Removal Of Rubble And Waste From Demolitions, - Marking And Securing Work Sites In Accordance With Applicable Occupational Health And Safety Regulations, - Reporting Works That Are Disappearing And Covered, And Participating In Partial And Final Acceptance.7. Special Conditions For Performing Works On The Premises Of The City Palm House: - During The Works, The Plants In The Pavilion Must Be Protected To The Maximum Extent Possible, - Storage Of Materials And Parking Of Cars May Only Take Place In Places Designated By The Ordering Party, - Works Should Be Carried Out In The Period Before The Technological Break In Operation Of The Palm House And During It, I.E. From June 28 To August 30, 20248. To Accept The Works, The Contractor Is Obliged To Present The Following Documents: - Certificates, Attestations And Declarations Of Conformity For The Installed Materials, - Partial Acceptance Reports, - Statement Of The Construction Manager And Construction Log, - Documents For Transferring Waste To The Landfill, - As-Built Technical Documentation, - Test Reports And Electrical Measurements. During The Implementation Of The Works, The Contractor Is Obligated To:1. Constantly Maintaining Order And Order On The Construction Site.2. Marking And Appropriate Protection Of Materials Necessary To Perform The Work.3. Current Removal Of Waste And Debris From Demolitions.4. Marking And Securing Work Sites In Accordance With Applicable Occupational Health And Safety Regulations.5. Participation In The Acceptance Of Works That Are Disappearing, Covered, Partial Acceptance And Participation In The Final Acceptance.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
a79edf6a-9425-4ae9-9db6-9c58b8259fce.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.