GTR 79224590

Tenders Are Invited For Construction Of A Fire Station Building For The Volunteer Fire Department In Łaz, Commune. Annexation

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
79224590
Tendering Authority
Subscribe to view
Tender No
GKN.271.5.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A Fire Station Building For The Volunteer Fire Department In Łaz, Commune. Annexation
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
26-04-2024 Closed
Work Detail
1. Subject Of The Order: The Order Covers The Implementation Of The Task Titled: Construction Of A Fire Station Building For The Volunteer Fire Department In Łaz, Commune. Partition.”2. The Subject Of The Contract Will Be Implemented With The Use Of Funds From The Government Fund Polish Order - Strategic Investment Program Edycja6pgr/2023/776/Polskilad. 3. The Detailed Scope Of The Subject Of The Contract Is Specified In The Design Documentation, Which Constitutes An Integral Part Of The Specification Of The Terms Of The Contract (Appendices No. 4 To The Swz) And The Bill Of Quantities - Annexes No. 5. The Bill Of Quantities Is Attached Only As An Aid. Construction Design Approved By The Decision Of The Staroste Of Zielona Góra On Building Permit No. 123/2024 Of March 18, 2024. 4. The Scope Of Works To Be Carried Out Includes Works Resulting From The Design Documentation And Necessary For The Proper Performance Of The Contract, Including, Among Others: A) Works General Construction - Preparatory And Earthworks, Surfaces - Foundations And Foundation Walls, - Ground Floor Construction Walls And Partition Walls, - Ceiling With Insulation, - Roof With Covering, - Sheet Metal Work, Including Gutters And Downspouts, - Building Insulation With Plastering Smooth Plastering In Ral 7035, Floors On The Ground Floor And Attic, Finishing Works Inside The Building, Installation Of Pvc Windows, Installation Of Internal And External Doors, B) Electrical Works, I.E.: Installation Of The Main Switchboard, External Power Supply Line To The Main Switchboard Of The Building, - Electrical Installation: Sockets, Lighting, Grounding, - Photovoltaic Installation, C) Sanitary Works, I.E.: - Internal Cold And Hot Water Installation, - Internal Sanitary Sewage System, - White Assembly, Including : Installation Of Handles And A Mirror In A Room Intended For Disabled People, A Washbasin And A Toilet Bowl, A Sink With A Standing Cabinet, Shower Trays, Urinals, - Central Heating System Powered By Electricity, - Cooling System, - Water Supply And Sewage Connections To The Building, - Rainwater Drainage  Assembly And Erection Of A Pole For Drying Hoses - Mast Structure Attached To Swz5. As Part Of The Implementation Of The Subject Of The Order, The Works Must Be Carried Out Taking Into Account The Requirements Arising From The Act Of July 19, 2019 On Ensuring Accessibility For Persons With Special Needs (Journal Of Laws Of 2020, Item 1062), In Particular Regarding The Elimination Of Architectural Barriers .6. The Contractor Will Carry Out The Works Using New Materials And Own Equipment, Which He Will Purchase And Deliver To The Construction Site At His Own Expense And Risk. The Cost Of Purchase And Delivery Of All Materials And Equipment Used To Complete The Subject Of The Order Is Included In The Contractors Remuneration. The Materials And Devices Used During The Execution Of The Works Must Be Approved For Use In Construction, In Accordance With The Applicable Legal Regulations. Demolition Materials Are The Property Of The Ordering Party.7. The Subject Matter Of The Contract, To The Extent That It Is Described By Indication Of Trademarks, Patents Or The Origin, Source Or Specific Process That Characterizes The Product Or Services Provided By A Particular Economic Operator, Should Be Read Together With The Words Or Equivalent. Therefore, It Is Allowed To Use Materials And Devices Other Than Those Indicated By The Manufacturers Names And Symbols, Provided That They Are Characterized By Equivalent, I.E. Not Worse, Parameters Important From The Point Of View Of The Use Of These Materials, And It Is The Contractors Obligation To Demonstrate The Equivalence Of These Parameters . 8. If The Description Of The Subject Of The Contract Includes References To Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Section 1 Point 2 And Section 3 Of The Public Procurement Law, The Ordering Party Allows Solutions Equivalent To Those Described. 9. The Information On Parameters And Functions Contained In This Swz Together With The Annexes Is The Minimum Data - The Ordering Party Allows The Offer Of Products With Extended Functions And Better Parameters, Provided That They Meet The Minimum Requirements Specified In This Order. 10. The Ordering Party Reserves The Right To Agree And Approve Material Solutions At Every Stage Of Order Execution.11. All Other Parameters Regarding The Scope Of Construction Works Covered By The Order Are Specified In The Design Documentation And Bill Of Quantities.12. The Contractor Is Obliged, Throughout The Entire Period Of Implementation Of The Subject Of The Order, To Employ Persons Performing Activities Related To The Implementation Of The Subject Of The Order, I.E. Direct Performance Of Construction Works In All Industries - All Manual Workers Performing Construction Works On The Construction Site, Technical Construction Staff, With The Exception Of The Construction Manager, Manager Works Only On The Basis Of Employment Contracts Within The Meaning Of The Provisions Of The Act Of June 26, 1974, Labor Code (Journal Of Laws Of 2023, Item 1465). 13. When Performing The Subject Of The Order, The Contractor Is Obliged To Respect The Law, In Particular The Provisions Of The Act Of July 7, 1994 Construction Law - (Journal Of Laws Of 2023, Item 682, As Amended), And The Provisions Of This Specification Terms Of Order (Swz).14. The Ordering Party Does Not Allow The Submission Of Variant And/Or Partial Offers.15. Reasons For Not Dividing The Contract Into Lots: All Works Covered By The Subject Of The Contract Constitute Closely Related Elements Of The Contract. Moreover, In Accordance With Recital 78 Of The Preamble To Directive 2014/24/Eu Of The European Parliament And Of The Council Of 26/02/2014 (Hereinafter Referred To As The Directive), Public Procurement Should Be Adapted To The Needs Of Smes. The Directive States That Member States Should Encourage Contracting Authorities To Share Large Orders For Parts. In Accordance With The Above-Mentioned Directive, The Ordering Party May Divide The Order On A Quantitative Basis - So That The Size Of Individual Orders Better Corresponds To The Capabilities Of Smes, Or On A Qualitative Basis, Taking Into Account The Various Industries And Specializations Involved, So As To Better Adapt The Content Of Individual Orders To Specialized Sme Sectors. The Directive Further States That The Contracting Authority Should Be Obliged To Consider The Advisability Of Dividing Contracts Into Lots, While Retaining The Freedom To Make Autonomous Decisions On Any Basis It Deems Appropriate, Without Being Subject To Administrative Or Judicial Supervision. As Reasons For Not Dividing The Contract Into Lots The Directive Provides, For Example, The Following Circumstances: The Contracting Authority Could Find That Such A Division Would Pose A Risk Of Restricting Competition Or Excessive Costs Of Performing The Contract, Or The Need To Coordinate The Activities Of Different Contractors Performing Individual Parts Of The Contract Could Seriously Jeopardize The Proper Performance Of The Contract. The Estimated Value Of This Contract Is Lower Than The Eu Thresholds Referred To In Art. 3 Of The Public Procurement Law. Taking This Into Account, It Should Be Stated That This Procedure Does Not Fall Into The Category Of Large Contracts. Therefore, By Its Nature It Is Addressed To Smes, Which Means That The Basic Assumption Of The Directive That The Contract Should Be Adapted To The Needs Of Smes Is Met.16. The Ordering Party Does Not Provide For The Possibility Of Awarding Single-Source Contracts Referred To In Art. 214 Section 1 Point 7 And 8 Of The Act. 17. The Ordering Party Will Not Select The Most Advantageous Offer Using An Electronic Auction.18. The Ordering Party Does Not Require Submitting An Offer In The Form Of Electronic Catalogs Or Attaching Electronic Catalogues.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
03c39426-e55c-421f-adda-74429a38149b.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders