Tenders Are Invited For Modernization Of The Heating Plant Of Bpec Sp. Z O. O. Stage I By Adding A Zero-Emission Heat Source With A Heat Pump Recovering Heat From Sewage And A Photovoltaic Installation.
Tenders Are Invited For Modernization Of The Heating Plant Of Bpec Sp. Z O. O. Stage I By Adding A Zero-Emission Heat Source With A Heat Pump Recovering Heat From Sewage And A Photovoltaic Installation.
4.1. The Subject Of The Design And Build Order Are Construction Works Consisting In The Design And Construction Of A Heat Source Based On Heat Pumps Using As A Lower Heat Source Treated Sewage From The Nearby Public Utilities Company Spółka Z O.O. In Biłgoraj (Pgk Biłgoraj) Along With Accompanying Installations And A Photovoltaic Installation With A Capacity Of Approx. 190 Kwp With Details: 1) Design Works In The Scope Of: Construction Design, Executive Designs In All Industries, As-Built Design In All Industries.2) Works Construction To Build A Heat Pump Building And Pumping Station, 3) Construction Works To Build A Retention Tank For Treated Sewage, 4) Delivery And Installation Of A Water-Water Heat Pump System, 5) Delivery And Installation Of A Photovoltaic Installation, 6) Work Related To The Inclusion Of New Devices And Installations Into The Existing Technological Systems Of The Heating Plant, 7) Delivery And Installation Of Electrical Systems And Instrumentation, Excluding Works Resulting From The Obtained Conditions For Transferring Power To The Network, Which Will Be Covered By A Separate Procedure, 8) Development Of The Adjacent Area, Including The Construction Of Hardened Surfaces.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.