GTR 79224546
Tenders Are Invited For Renovation Of The Roof Covering In The Building Of The School Complex No. 129 At Ul. Koncertowa 4 In Warsaw.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
79224546
Tendering Authority
Subscribe to view
Tender No
29/WZP/2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of The Roof Covering In The Building Of The School Complex No. 129 At Ul. Koncertowa 4 In Warsaw.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
26-04-2024
Closed
Work Detail
The Subject Of The Order Is The Renovation Of The Roof Covering On A Complex Of Buildings That Are Part Of The Educational Buildings Connected By Connectors: Primary School No. 303. Fryderyk Chopin And Clxvi Secondary School With Sports Departments In The School Complex No. 129 At Ul. Koncertowa 4 In Warsaw, Together With The Building Of The Psychological And Pedagogical Counseling Center No. 18. The Renovation Works Were Planned On The Basis Of The Inspection And Assessment Of The Technical Condition Of The Roof Covering, Sheet Metal Flashings And Elements Draining Water From The Roof. The Detailed Scope Of The Subject Of The Order Is Determined By: Technical Specification For The Execution And Acceptance Of Works And The Bill Of Quantities. The Works To Be Performed Include: 1) Tearing Off The Existing Roof Covering With 6 (Six) Layers Of Thermally Weldable Felt, 2) Repairing The Concrete Base For Insulating Coatings And New Roofing Felt, 3) Demolition And Reconstruction Of Chimneys With Damaged Bonds Of Ceramic Masonry Elements, 4) Disassembly And Reconstruction Of Chimney Caps, 5) Removal And Reconstruction Of Burnt Plaster Of Chimney Walls, 6) Demolition Of Sheet Metal Workings Intended For Replacement, 7) Partial Dismantling And Reconstruction Of Skylight Sheet Metal Workings Roofing (Recycled Material). The Demolition Of Skylight Flashings Should Be Carried Out Under The Supervision Of The Skylight Renovation Contractor - Renovation Performed In 2023 And Covered By Warranty. 8) Replacement Of Roof Drains, 9) Installation Of A Two-Layer Roof Covering With Thermally Weldable Felt, 10) Coverage Of The Forum Roof With A Jointless Waterproofing Membrane, 11) Installation Of Pressure Strips Around Chimneys And Skylight Walls, 12) Installation Of Styrofoam Isoclines, 13) Installation Of Waterproof Osb Boards (Gr. .18 Mm) For Sheet Metal Flashings, 14) Installation Of Sheet Metal Flashings 15) Dry Asphalt Roofing Insulation For Sheet Metal Flashings (Attic Flashings), 16) Disassembly Of 3 Pcs. Of Polycarbonate Roof Skylights With A Steel Substructure, 17) Installation Of 3 Pcs. Roof Skylights With An Aluminum Mullion-Transom Supporting Structure. Tempered Outer Glass, Tempered And Laminated Inner Glass. U-Value=1.7W/M2k. One Skylight Section Opened By An Electric Actuator. (The Price Includes The Processing Of Skylights Inside The Rooms Along With The Construction Of Plasterboards And Mineral Wool). 18) Replacement Of The Lightning Protection System On The Roof Along With The Implementation Of A Full Resistance And Grounding Measurement Protocol As Well As Connection Continuity. The Ordering Party Has An Archived Design For The Replacement Of The Lightning Protection System Along With A Projection Of The Roof With The Lightning Protection System Marked: A) Disassembly Of Horizontal And Vertical Air Terminals As Well As Spacing Brackets And Control Connectors Of The Installation Before The Roof Renovation, B) Installation Of Horizontal And Vertical Air Terminals Of The Installation Mounted On Brackets Placed After The Completed Roof Renovation . Connect Dfezn ᴓ 8 Mm Galvanized Steel Wire Cables To The Existing Designed Measurement Connectors Connected To The Existing Building Grounding, C) Perform The Tensioning Installation Using Roman Tension Holders, D) Control Measurements Of The Rim, E) Installation Of Free-Standing Masts (Weight 27130 Fi12 / Fi8 X 2000 Mm And 27150 Fi12 / Fi8 X4000mm)F) Installation Of Chimney Spiers. Obligations Arising From The Social Clause, The Act On Electromobility And Alternative Fuels And Regarding Accessibility For People With Disabilities.1. Social Clauserequirements Related To The Implementation Of The Contract In Terms Of Employment By The Contractor Or Subcontractor On The Basis Of An Employment Relationship Of Persons Performing Activities Indicated By The Ordering Party In The Scope Of Contract Execution: 1) In The Proceedings In Question, The Ordering Party Applies A Social Clause Pursuant To Art. 95 Section 1 Of The Public Procurement Law. 2) The Contractor Undertakes To Ensure That Activities Related To The Implementation Of The Construction Works Contract Throughout The Entire Period Of Performance Of The Subject Of The Contract Will Be Performed By Persons Employed Under A Full-Time Employment Contract Within The Meaning Of The Labor Code By The Contractor Or Subcontractor. 3) Condition Referred To In Point 2) Will Be Fulfilled By Employing New Employees Under An Employment Contract Or Appointing Already Employed Persons Performing Activities In The Field Of Construction Works To Carry Out The Order, Including In Particular The Following Works: • Preparatory Works, • Roofing Works, • Electrical And Sanitary Installation Works4) A Detailed Description Of The Obligations Arising From The Social Clause Can Be Found In The Draft Provisions Of The Contract - Annex No. 2 To The Swz.2. Obligations Arising From The Act On Electromobility And Alternative Fuels. The Contractor Is Obliged To Meet The Requirement Specified In Art. 68 Section 3 Of The Act Of January 11, 2018 On Electromobility And Alternative Fuels (Journal Of Laws Of 2020, Item 908). Therefore, The Contractor Undertakes To Provide The Ordering Party, At Each Request Of The Ordering Party, With A Written Declaration Of Its Fulfillment. Failure To Submit A Written Declaration Within The Prescribed Deadline Will Be Treated By The Ordering Party As Failure To Meet The Requirements Of The Act In Question. Submitting The Declaration Referred To Above Does Not Exclude The Ordering Partys Right To Verify Compliance With The Above. Requirement In A Manner Chosen By The Ordering Party, In Particular By Requesting The Production Of Vehicles Or Documents Relating To Vehicles.3. The Ordering Party Does Not Include Any Requirements Regarding Accessibility For People With Disabilities As Part Of The Order In Question. A Detailed Description Of The Subject Of The Contract Is Specified In This Swz And: 1) Designed Provisions Of The Contract - Annex No. 2 To The Swz; 2) Technical Specification For The Execution And Acceptance Of Works - Annex No. 5A To The Swz, Which Is Also Annex No. 2 To The Draft Provisions Of The Contract; 3) Bill Of Quantities – Annex No. 5B To The Swz; 4) Description Of The Subject Of The Order – Annex No. 5C To The Swz;
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
387b4f79-eaeb-451e-900c-3deef26c1f96.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.