GTR 79224389
Tenders Are Invited For Construction Of A Double Office Of The Dębowiec Forestry And Poraj Forestry.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
79224389
Tendering Authority
Subscribe to view
Tender No
S.270.4.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A Double Office Of The Dębowiec Forestry And Poraj Forestry.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
25-04-2024
Closed
Work Detail
1) The Subject Of The Order Is The Construction Of A Double Office Of The Dębowiec Forestry And Poraj Forestry. The Building Is A Single-Story Building With An Attic, Without A Basement, With A Hipped Roof With An Inclination Angle Of 30°. Only An Office And Social Zone Is Planned On The Ground Floor. Functionally, The Facility Is Divided Into 2 Premises Constituting Office Zones And Utility Rooms. The Building Is Constructed Using Wooden Frame Construction Technology. Partition Walls Made Of Wooden Frames Finished With Wainscoting Boards Or Plasterboards On A Steel Grid Filled With Mineral Wool. The Roof Truss Structure Is Designed From C24 Wood In A Rafter-Collar Beam System. The Roof Slopes Will Be Covered With Metal Roof Tiles. Subject Matter And Scope Of Works1) Preparatory Works2) Earthworks3) Works Structural - Construction Of A Reinforced Concrete Beam And Slab4) Construction Of Horizontal Insulation Of A Vertical Beam And A Reinforced Concrete Slab5) Construction Of Walls With A Wooden Structure6) Construction Of A Wooden Roof Structure With Roof Covering And Sheet Metal Work According To The Design Documentation7) Installation Of Windows And Doors8) Construction Of Dry Plasters And Wall Cladding9) Construction Of Floors10) Construction Of The Facade11) Hardening Of The Sidewalk With Concrete Cubes, Construction Of An Access Road And Parking Spaces With Concrete Cubes12) Installation Of A Fence And A Gate13) Installation Of Cold And Hot Water14) Installation Of Sanitary Sewage15) Installation Of Multi Split Air Conditioning16) Water And Sanitary Sewage Connections17) Electrical Installation : Lighting, Plug Sockets, Anti-Shock Protection And Equipotential Bonding, Overvoltage Protection, Heating, Internal Wlz-Et Power Line From The Cable And Measurement Connector, External Lighting Basic Technical Data Of The Double Office Building: Plot Development Area - 364.31 M2 Designed Building Area - 87.02 M2 Designed Usable Area Building - 69.83 M2 Volume - 425.60 M3 Height - 5.74 M2) General Information Regarding The Execution Of The Order: As Part Of The Lump Sum Remuneration, The Contractor Took Into Account: - In The Case Of Using Subcontractors, Coordinating The Works Of Subcontractors, Taking Full Responsibility For Them; Performance Of Work Taking Into Account All Conditions And Orders Arising From Agreements And Mutual Obligations; Ensuring The Proper Condition And Order Of The Work Site, As Well As In The Event Of Using Roads, Real Estate, Facilities, Devices That The Contractor Disturbs In Order To Perform The Subject Of The Order, Repairing Any Damage Related To The Work Caused To Third Parties Or Damage To Property; Costs Of All Utilities Necessary To Complete The Order (Electricity, Water, Etc.) Surveying Services, Waste Management In Accordance With The Provisions In The Bills Of Quantities And Descriptions In The Project; Terms Of Contract Execution, Contractors Obligations: Requirements For The Works - All Works Should Be Carried Out In Accordance With Applicable Regulations, Applicable Standards, Technical Conditions, Occupational Health And Safety And Fire Protection Regulations, Swz Guidelines And Other Appendices. Terms Of Warranty And Guarantee: A) For The Entire Item Completed Order, The Contractor Will Provide The Ordering Party With A Warranty Of At Least 36 Months. B) The Warranty Period Will Be Counted From The Date Of The Fault-Free Final Acceptance Report Of Construction Works. C) The Warranty Periods Granted By Subcontractors Must Correspond, At Least, To The Period Granted By The Contractor And Will Be Counted From The Date Of The Fault-Free Final Acceptance Report Of Construction Works. D) The Contractor Is Obliged To The Ordering Party Under The Warranty For Physical Defects Of The Subject Of The Contract For A Period Of 5 Years From The Date Of Preparation Of A Fault-Free Final Acceptance Report Of The Subject Of The Contract.3) The Ordering Party Allows Including In The Offer And Then Applying Equivalent Solutions - Involving The Use Of Materials And Devices Other Than Those Specified In The Design Documentation, Provided That Ensuring All Parameters Are No Worse Than Those Specified In This Documentation. In Such A Situation, The Ordering Party Requires The Submission Of Documents Containing A Description Of The Materials And Equipment Proposed By The Contractor As Equivalent. The Contractor Relying On Equivalent Solutions Must Demonstrate (Prove) That The Offered Materials And Devices Meet The Requirements Specified By The Ordering Party In The Documentation. In The Event Of Offering Equivalent Materials Or Techniques For Performing Construction Works, The Contractor Must, Together With The Oferta Form, Present The Offered Materials Or Techniques For Performing Construction Works And Attach Documents Confirming Technical Parameters And A Comparative Analysis, Which Clearly Shows That They Are Fully Equivalent To Solutions Indicated In The Procedure Documentation. If The Contractor Does Not Submit Documents Regarding The Use Of Other Materials And Devices In The Offer, It Is Understood That The Materials And Devices Proposed In The Technical Documentation For This Procedure Were Included In The Calculation Of The Offer Price. The Term Parameters Means Functional And Quality Properties (Including Compliance With The Standards Referred To In The Documentation Describing The Subject Of The Order), Intended Use, Materials, Safety And Durability. In The Case Of Offering Equivalent Solutions Referred To Above - The Offer Must Be Accompanied By Documents (E.G. Technical Descriptions, Catalog Cards, Declarations Of Conformity) Describing The Proposed Materials And Devices To Confirm That The Use Of The Materials And Devices Proposed By The Contractor As Equivalent Meets Requirements Specified By The Ordering Party.4) The Ordering Party Allows Solutions Equivalent To The Standards, Technical Assessments, Technical Specifications And Technical Reference Systems Described In The Order Documentation, In Accordance With Art. 101 Section 4 Of The Public Procurement Law. A Detailed Description Of The Order Includes: - Design Documentation (Annex No. 10); - Technical Specification For The Execution And Acceptance Of Construction Works (Annex No. 11). The Detailed Scope Of Work Is Included In The Bill Of Quantities (Annex No. 12), However, The Bill Of Quantities Is Only Of Auxiliary Nature, Enabling The Contractor To Estimate The Planned Works. The Investor Does Not Expect To Increase The Scope Of Works Beyond What Was Included In The Bill Of Quantities And The Technical And Land Development Description. Required Order Completion Date: Up To 24 Weeks From The Date Of Conclusion Of The Contract,
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
572cd76c-b9aa-4a37-a440-b755f11e7ab9.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.