GTR 79028158
Tenders Are Invited For Construction And Reconstruction Of Roads, Improvement Of Detailed Drainage Parameters With The Construction Of New Culverts And Land Reclamation As Part Of The Operation Consolidation Of Land In The Villages Of Kryłów Kolonia, Prehoryłe In The Commune. Mircze
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
79028158
Tendering Authority
Subscribe to view
Tender No
PR.272.12.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction And Reconstruction Of Roads, Improvement Of Detailed Drainage Parameters With The Construction Of New Culverts And Land Reclamation As Part Of The Operation Consolidation Of Land In The Villages Of Kryłów Kolonia, Prehoryłe In The Commune. Mircze
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
22-04-2024
Closed
Work Detail
1. The Subject Of The Order Is The Preparation Of Design Documentation And Obtaining The Necessary Decisions, Opinions And Permits, As Well As The Performance Of Construction Works For The Investment Called Construction And Reconstruction Of Roads, Improvement Of Detailed Drainage Parameters With The Construction Of New Culverts And Land Reclamation As Part Of The Operation Consolidation Of Land In The Villages Of Kryłów Kolonia, Prehoryłe In The Mircze Commune In The Hrubieszów Poviat.2. The Scope Of The Contractors Services Includes: 1) Development Of Design Documentation In Accordance With The Functional And Utility Program - Hereinafter Referred To As Pfu (Annex No. 1 To Swz), Containing: A) Construction Design Developed In Accordance With The Construction Law, Regulation Of The Minister Of Development Of September 11, 2020. On The Detailed Scope And Form Of The Construction Design And In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program - In Paper Form (5 Copies) And In Electronic Form On Cd/Dvd (2 Copies); B) Executive Designs For The Entire Scope Of The Order Prepared In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications Of The Execution And Acceptance Of Construction Works And The Functional And Utility Program (Journal Of Laws Laws Item 2454). - In Paper Form (3 Copies) And In Electronic Form On Cd/Dvd (2 Copies); C) Investor Cost Estimate Prepared In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On Determining The Methods And Basis For Preparing The Investor Cost Estimate , Calculating The Planned Costs Of Design Works And The Planned Costs Of Construction Works Specified In The Functional And Utility Program - In Paper Form (2 Copies) And In Electronic Form On Cd/Dvd (2 Copies); D) Technical Specification For The Execution And Acceptance Of Works In Accordance With The Regulation The Minister Of Development Of September 11, 2020 On The Detailed Scope And Form Of The Construction Design And In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Program Functional And Utility - In Paper Form (2 Copies) And In Electronic Form On Cd/Dvd (2 Copies); E) Temporary Traffic Organization Design For The Duration Of The Works.2) Obtaining Legally Required Decisions, Opinions, Arrangements And Checks Of The Design Documentation For The Planned Project, Including An Environmental Decision; 3) Obtaining A Building Permit Or Submitting A Notification Of The Intention To Perform Construction Works (In Accordance With The Conditions Arising From The Construction Law) And Other Necessary Administrative Decisions, 4) Carrying Out Construction Works Based On The Completed Design Documentation Prepared In Accordance With The Pfu Constituting Annex No. 1 To The Swz, Including In Particular The Performance Of The Following Works: A) Roads To Be Constructed: - Dirt Roads Marked No.: 2K, 2P With A Total Length Of 0.703 Km Are Planned For The Construction Of Surfaces Made Of Mechanically Stabilized Crushed Aggregate With A Road Width Of 3.5 M.;- Dirt Road No.: 17C With A Length Of 0.3 Km Is Designed For Construction With A Surface Of Reinforced Concrete Slabs Of The Jomb Type (100X75x12cm) With A Width Of 3.5 M.B) Roads To Be Reconstructed With A Surface Of Asphalt Concrete With A Width Of 3.5 M: - Road No. 3, 1.128 Km Long; - Road No. 3A (Part), 0.820 Km Long, And No. 9, 0.390 Km Long; - Road No. 4 (Part), 0.950 Km Long, 5 0.346 Km Long, 7 Long 0.784 Km, 8 (Part) Long 0.500 Km, 11 Long 0.685 Km, 11A (Part) Long 0.722 Km, 16 Long 1.008 Km, 18 (Part) Long 0.375 Km, 20 (Part) Long 0.444 Km ;- Road No. 17A, 0.332 Km Long;- Road No.: 7A (Part), 0.150 Km Long, 12 0.333 Km Long, 12A 0.197 Km Long, 13 0.487 Km Long, 15 0.425 Km Long, 15A ( Part) 0.248 Km Long, 18 (Part) 1.163 Km Long, 21 (Part) 0.054 Km Long;- Road No. 4 (Part) 0.317 Km Long, 7A (Part) 0.642 Km Long, 8 (Part) 0.270 Km Long, 11 (Part) 0.317 Km Long. C) Roads To Be Reconstructed With A Surface Made Of Mechanically Stabilized Crushed Aggregate, 3.5 Wide - Road No. 3A (Part) 0.390 Km Long. - Road No. 10, Long. 0.990 Km.- Road No. 15A (Part) 1.255 Km Long, 17B 0.343 Km Long, 21 (Part) 0.132 Km Long- Road No. 20 (Part) 0.308 Km Long. D) Surfaced Roads For Reconstruction Made Of Asphalt Concrete 5.5 M Wide: - Road No. 6 With A Length Of 0.864 Km, 6A With A Length Of 0.735 Km, 7A (Part From The East) With A Length Of 0.125 Km And 23 With A Length Of 3.316 Km; - Road No. 18 ( Part) With A Length Of 0.310 Km. E) Other Works: - Reconstruction Of Dirt Roads Indicated In The Graphic Attachment On A Scale Of 1:10,000 In Yellow With A Total Length Of Approximately 9.900 Km Are Planned To Be Leveled With A Grader On A Width Of 3.5 M Along With Mechanical Compaction And With The Transport Of Soil To Low-Lying Areas In The Area. - Reclamation Of Land With An Area Of Approximately 1 Ha Will Consist In Clearing The Road Lane And Possibly Adjacent Land And Disposal/Removal Of Cut Bushes. - Improving The Water Drainage Parameters Over A Length Of Approximately 1.5 Km Will Consist In Clearing The Bushes And Desilting Some Of The Ditches (Main Ones), And Mechanically Spreading The Spoil Extracted From The Bottom Of The Ditches. The Ditches To Be Cleaned Are Marked In Blue In The Graphic Attachment. - It Is Planned To Build 10 Culverts With A Diameter Of 0.8 M And A Length Of 8 M. In The Case Approved By The Designer, Also Abutments For The Culverts. 5) Carrying Out Authors Supervision By The Authors Of The Project 6) Providing Surveying Services; 7) Obtaining On Behalf Of The Ordering Party A Non-Final Occupancy Permit Or A Certificate Of Lack Of Grounds For Objection To The Notification Of The Construction Supervision Authority About The Completion Of Construction. 3. Detailed Conditions For The Implementation Of The Agreement And Its Scope, Including The Scope Of Design Work And Works, Are Specified In The Functional And Utility Program (Hereinafter Also Referred To As: Ffu) - Annex No. 1 To The Swz, And The Contract Template - Annex No. 2 To The Swz
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
ff001370-669c-4a46-89e0-6116cfb39b77.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.