GTR 78981583

Tenders Are Invited For Post-Consolidation Development Of The Village Of Strzelce Wielkie, Szczurowa Commune As Part Of The Operation Called Consolidation Of Land Located In The Area Strzelce Wielkie Village, Szczurowa Commune

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
78981583
Tendering Authority
Subscribe to view
Tender No
ABR.272.4.2024.MS
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Post-Consolidation Development Of The Village Of Strzelce Wielkie, Szczurowa Commune As Part Of The Operation Called Consolidation Of Land Located In The Area Strzelce Wielkie Village, Szczurowa Commune
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
26-04-2024 Closed
Work Detail
1. The Subject Of The Order Is The Post-Consolidation Development Of The Village Of Strzelce Wielkie, Szczurowa Commune As Part Of The Operation Called Consolidation Of Land Located In The Area Of ​​The Village Of Strzelce Wielkie, Szczurowa Commune.2. The Order Includes, Among Others, The Following Scope: Newly Designed Roads For Construction (Ballast Surface). Km 8,496 Roads Newly Designed For Construction (Soil Surface). Km 10,664 Newly Designed Roads For Construction With Drainage (Rubble Surface). Km 1,283 Roads Newly Designed For Construction With Drainage (Soil Surface). Km 0.833Roads To Be Reconstructed (Rubble Surface). Km 4,398Roads To Be Reconstructed (Soil Surface). Km 2.895Roads To Be Reconstructed With Drainage (Improvement Of The Crushed Stone Surface). Km 0.436Roads To Be Reconstructed With Drainage (Improvement Of The Parameters Of Drainage Ditches). Km 1,781Ditches In Agricultural Areas To Correct The Course And Improve Technical Parameters. Km 43.958Ditches In Forest Areas To Correct The Course And Improve Technical Parameters. Km 6.471Improvement Of Technical Parameters Of Water Drainage Devices By Cutting Out Bushes. Km 3.801 Area Reclamation In Connection With Closed Roads. Ha 2,568 Area Reclamation In Connection With Liquidated Ditches. Ha 0.24 Reclamation Of The Area In Connection With The Conditions Of Taking Possession. Ha 46,577Construction Of Culverts. Art 102Planned Trees And Shrubs (Rows Of Trees). Art 98Planned Trees And Shrubs (Buffer Zone). Ha 0.393. A Detailed Description Of The Subject Of The Order Is Included In The Design Documentation, Technical Specification For The Execution And Acceptance Of Works, Bill Of Quantities And Decisions, Arrangements And Technical Conditions Of The Network - Constituting Annex No. 2 To This Swz, Decision No. 90/2024 Of March 18, 2024 On The Approval Of The Development Project Area And The Architectural And Construction Design And Granting A Building Permit, Constituting Annex No. 9 To Swz, Work Notification Abr.6743.7.17.2024.Wb Of February 14, 2024, Constituting Annex No. 10 To Swz.4. The Contractor, With Its Own Efforts And At Its Own Expense, Is Obliged To: A) Accept The Construction Site And Secure It; B) Arrange And Develop The Construction Site And Organize Construction Facilities; C) Provide Civil Liability Insurance For Damages That May Occur During The Implementation Of The Project. Of This Agreement; D) Ensure, Using Your Own Efforts And At Your Own Expense, The Construction Manager And Managers Of Industrial Works; E) Carry Out Construction Works In Good Order, And After Their Completion, Tidy Up The Construction Site (Restoring It To Its Original Condition) And Hand It Over To The Ordering Party Within The Deadline Determined During The Final Acceptance; F) Maintaining Order On An Ongoing Basis At The Site Covered By The Works, Ensuring Proper Organization Of The Works And Carrying Out Security Works; G) Informing The Employer / Supervision Inspector, E.G. By Making An Entry In The Construction Log, About The Date Of Execution/Acceptance Of Disappearing Works And Covering The Works Undergoing Covered, In Advance Allowing For Their Verification, I.E. 3 Business Days. The Contractor Will Immediately Notify The Ordering Party / Supervision Inspector About The Above Fact. The Inspection Will Take Place No Later Than Within 3 Business Days From The Date Of Notification. If The Contractor Has Not Made The Notification Referred To Above, He Is Obliged To Discover The Works Or Perform Other Activities Necessary To Examine The Works, And Then Restore The Works To Their Previous State At His Own Expense; H) Provide The Ordering Party / Supervision Inspector Without Additional Request With All Approvals And Certificates Required By Law And Technical Specifications For The Materials Used, Under Penalty Of The Ordering Partys Refusal To Accept The Works Performed By The Contractor;I) Allowing Employees Of The State Construction Supervision And Other Authorized Persons To Perform The Tasks Specified In The Law And To Provide Them With Data And Information Required By Law Regarding The Works Carried Out On The Construction Site;J) Immediate Execution Of Safety Works In The Event Of A Threat Of Construction Disaster Or Destruction And Immediate Notification Of This Fact To The Ordering Party/Supervision Inspector;K) Carrying Out The Works In A Way That Does Not Cause Damage To The Above-Ground And Underground Infrastructure And Property Third Parties, And In The Event Of Any Damage, To Repair It;L) Keep An Up-To-Date Construction Log;M) Interrupt The Work At The Request Of The Ordering Party And Therefore Secure The Completed Works Against Destruction;N) Ensure Appropriate Surveying Services For The Construction Works Being Carried Out And To Reconstruct Geodetic Control Network Points In The Event Of Their Destruction;5. If, In Order To Perform The Subject Of The Order, It Will Be Necessary To: A) Enter The Area Or Use Other Properties Or Facilities Of Third Parties, The Contractor Is Obliged To Obtain The Appropriate Consent Of Their Owners, Agree On The Scope And Dates Of Their Use And Bear All Related Costs; B) Seizure Road, The Contractor Is Obliged To Obtain The Appropriate Consent Of The Road Manager, Develop A Temporary Traffic Organization Design For The Duration Of Construction And Bear All Related Costs. 6. The Contractor Will Perform Construction Works Constituting The Subject Of The Order In Accordance With Decision No. 90/2024 Of March 18, 2024 On The Approval Of The Construction Design And Granting A Construction Permit, As Well As The Decisions, Arrangements And Technical Conditions Of The Network - Contained In Annex No. 2 To This Swz , Works Notification Abr.6743.7.17.2024.Wb Of February 14, 2024 And From Own Materials, I.E. Products Approved For Use In Construction Within The Meaning Of The Act Of July 7, 1994 Construction Law (Journal Of Laws Of 2023, Item 682, As Amended) And The Act Of April 16, 2004 On Construction Products (Journal Of Laws Of 2021, Item 1213).7. The Contractor Provides A Warranty For The Subject Of The Contract For A Period Of Not Less Than 36 Months From The Date Of Fault-Free Final Acceptance Of The Subject Of The Contract.8. The Warranty For Defects In The Subject Of The Contract Is 60 Months From The Date Of Fault-Free Final Acceptance Of The Subject Of The Contract.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d4679cbc-4bf4-4590-8632-c4c24ba09c7c.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders