GTR 78771492

Tenders Are Invited For Iin Municipality Dock Contract 2024

ICB — International Competitive Bid Closed Western Europe
Tender Information
GTR Reference
78771492
Tendering Authority
Subscribe to view
Tender No
2024-144393
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Iin Municipality Dock Contract 2024
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Western Europe
Political Region
European Union
Last Date of Bid Submission
12-04-2024 Closed
Work Detail
The Request For Tender Concerns The Planning And Implementation Of The Vihkosaari Beach And Vatung Harbor Wharf Projects Located In The Municipality Of Ii, And As A Possible Option The Construction Project Of The Kaakkurinniemi Boat Launch Ramp, The So-Called Turnkey. In Vihkosaari, A New Swimming Pier Will Be Renewed In Place Of The Old Pier. According To The Sketch, The Total Dimensions Of The Pier Are Approximately 33 M X 10 M. The New Swimming Pier Must Be Suitable For Open Swimming In Addition To Summer Swimming. The Contract Includes The Design And Construction Of The New Swimming Pier At Vihkosaari Beach, Including The Design And Construction Of The Piers Lighting. The Contract Also Includes The Purchase Of A Winter Swimming Site Thawing Pump And The Design And Implementation Of The Quay Surface Thawing System For Winter Swimming Use, As Well As The Possible Dredging Of The Wharf Areas Waterways (<500M3ktr), Including The Transportation Of The Dredged Masses To The Place Indicated By The Customer At A Distance Of Less Than 1 Km. The Existing Pier Will Be Dismantled In Those Parts That Cannot Be Used In The New Pier (E.G. Stairs). The Disassembled Parts Are The Property Of The Customer And They Will Be Stored At The Location Indicated By The Customer, Approximately 1 Km Away. The Pier Must Include A Floating Overhang Like A Pier, On Which The Illuminated Corten Steel Ii Logo Manufactured By Iin Konepaja Oy Will Be Placed, The Preliminary Dimensions Of Which Are Shown In The Observation Picture. In The Winter Swimming Area, Heating For Defrosting And Steps From The Pier To The Water Must Be Planned And Built. As Part Of The Contract, The Winter Swimming Area Will Be Equipped With A Pump System That Keeps The Swimming Area Warm, Which Can Be Closed With A Local Switch During Swimming. For The Swimming Lanes, A Swimming Lane Boom Must Be Installed, Which Can Be Removed For The Winter. The Distance Between The Booms Is Thought To Be 2.5 Meters. Several Years Ago, A Pier In Poor Condition Was Removed From Vatungi Port, Which Also Served As A Breakwater Harbor Basin. A New Pier Will Be Designed And Built To Replace This Removed Pier. The Wharf Must Be A Floating, Anchored Boat Wharf On Concrete Pontoons (A So-Called Heavy Concrete Wharf) And It Must Have Dimensions Of Approximately 35 M X 2.5...3 M, Equipped With 6-Meter-Long Ramps For 10 Boat Berths, With Red Teardrop-Shaped Floats At The End. The Boat Berths At The Pier Are Equipped With Boat Lashing Loops Suitable For Seawater Conditions. The Pier Must Have A Concrete Surface And Be Equipped With A Set Of Rescue Equipment. The Contract Includes The Design And Construction Of The Pier, Procurement Of Materials (Pier Elements With Boat Fastening Solutions), Construction Of The Ground Support (The Ground Support Of The Dismantled Home Boat Dock Can Be Used If The Contractor Determines That It Is Possible), Installation Of The Footbridge Leading From The Land To The Pier (The Footbridge Of The Dismantled Home Boat Dock Is Temporarily Stored In The Area, Which May Be Used As Is) And The Numbering Of Boat Berths. Option Item: A Plan Has Been Drawn Up For The Harbor Area Of ​​Kaakkurinniemi, But In This Contract Only The Boat Launch Ramp Would Be Implemented According To The Preliminary Plan In The Attached Files. Changes Have Been Made In The Area Since The Time Of The Plan, Which Is Why E.G. The Planning Of The Placement Of The Boat Launch Ramp Is Included In The Contract. The Contract Also Includes The Planning And Improvement Of The Construction Site Traffic Route Using The Current Route. The Customer Decides On The Construction Of The Option Site Within The Budget.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
d061d056-768a-46ef-afd7-77935ea0cebb.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders