GTR 78765500
Tenders Are Invited For Reconstruction And Expansion Of The Water Treatment Plant In Drzeniów
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
78765500
Tendering Authority
Subscribe to view
Tender No
ZUK.ZP.1.1.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction And Expansion Of The Water Treatment Plant In Drzeniów
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
18-04-2024
Closed
Work Detail
1. The Subject Of The Order Are Construction Works Consisting In The Reconstruction And Expansion Of The Water Treatment Plant In Drzeniów - Commune. Cybinka, Plot Registration Number: 98/11, Area: Drzeniów (In The Design And Build Mode), The Scope Of The Order Includes: 1) Task I - Development, Based On The Functional And Utility Program Provided By The Ordering Party, Of The Design Documentation Necessary For The Implementation Of The Project Along With Obtaining Necessary Administrative Decisions Enabling The Implementation Of Works In Accordance With The Provisions Of The Construction Law (Decision On A Building Permit Or Notification Of The Execution Of Construction Works) And Any Other Necessary Decisions, Opinions And Arrangements Necessary For The Proper Implementation Of The Investment,2) Task Ii - Execution Of Construction Works Based On Developed Design Documentation, Completed With The Preparation Of As-Built Documentation.2. The Subject Of The Order Includes The Development Of Design Documentation And Obtaining The Necessary Decisions, Opinions And Permits, Including A Decision On A Building Permit Or Notification Of Construction Works And The Performance Of Construction Works In The Field Of Reconstruction And Expansion Of The Water Treatment Plant In Drzeniów, Including:1) Scope Of Work As Part Of The Implementation Of Task I - I.E. Development Of Design Documentation In Accordance With The Pfu (Annex No. 6 To The Swz) Containing, Among Others: A) Preparation Of A Conceptual Design (Program And Spatial Concept) Proposed Design Solutions (Including Solutions Regarding The Proposed Materials And Devices) For The Approval Of The Ordering Party - In Paper Form (2 Copies) And In Electronic Form On Cd/Dvd (1 Copy); B) Preparation Of A Map For Design Purposes Covering The Investment Area - 1 Copy C) Obtaining On Behalf Of And For The Ordering Partys Decision To Determine The Location Of A Public Purpose Investment - If Required, D) Construction Design Developed In Accordance With The Construction Law, The Regulation Of The Minister Of Development Of September 11, 2020 On The Detailed Scope And Form Of The Construction Design, The Regulation Of The Minister Of Development And Technology Of October 27, 2023 Amending The Regulation On The Detailed Scope And Form Of The Construction Design And In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional Program Utility - In Paper Form (4 Copies) And In Electronic Form On Cd/Dvd (1 Copy); E) Detailed Design Prepared In Accordance With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program, Taking Into Account Possible Protection Or Removal Of Conflicts Between The Existing Technical Infrastructure Network And The Planned Land Development (2 Copies) And In Electronic Form On Cd/Dvd (1 Copy); F) Investors Cost Estimate Prepared In Accordance With With The Regulation Of The Minister Of Development And Technology Of December 20, 2021 On Determining The Methods And Basis For Preparing An Investors Cost Estimate, Calculating The Planned Costs Of Design Works And The Planned Costs Of Construction Works Specified In The Functional And Utility Program - In Paper Form (1 Copy) And In Electronic Form On Cd/Dvd (1 Copy); G) Detailed Technical Specifications For The Execution And Acceptance Of Works (Hereinafter Referred To As Stwiorb) Developed In Accordance With The Regulation Of The Minister Of Infrastructure Of September 11, 2020 On The Detailed Scope And Form Of The Construction Design And In Accordance With Regulation Of The Minister Of Development And Technology Of December 20, 2021 On The Detailed Scope And Form Of Design Documentation, Technical Specifications For The Execution And Acceptance Of Construction Works And The Functional And Utility Program - In Paper Form (1 Copy) And In Electronic Form On Cd/Dvd (1 Copy).H) Development Of Information Regarding Health And Safety (Bioz) Taking Into Account All Industries Involved.I) Obtaining, On Behalf Of The Ordering Party, The Legally Required Decisions, Opinions, Arrangements And Checks Of The Design Documentation For The Planned Project, Including The Development Of A New Water Law Report For Groundwater Abstraction Along With Obtaining A Final Decision.J) Obtaining The Employers Approval In The Above-Mentioned Scope. Documentation Before Submitting An Application For A Building Permit Or Reporting The Performance Of Construction Works, K) Obtaining A Building Permit On Behalf And On Behalf Of The Ordering Party Or Reporting The Intention To Perform Construction Works (In Accordance With The Conditions Arising From The Construction Law), Including Obtaining A Letter Of No Objection To Notification Of Construction Works That Do Not Require A Building Permit.2) Scope Of Work As Part Of The Implementation Of Task Ii - Execution Of Construction Works Based On The Design Documentation Prepared In Accordance With The Ffu, In The Scope Of Reconstruction And Expansion Of The Water Treatment Plant In Drzeniów, Including: A) Preparatory Works, Demolition Of The Existing Casings Of Deep Wells, Demolition Of The Existing Fence, Demolition Of Existing Hardening With Edges, Curbs, Etc., Demolition Of The Existing Rinsing Water Settling Tanks (4 Reinforced Concrete Wells), Demolition Of The Existing Horizontal Treated Water Tank Along With The Embankment; B) Reconstruction Of The Main Building Along With All Technological And Electrical Equipment As Well As Control And Measurement Equipment And Automation (Water Treatment Unit Capacity 15.00 M3/H), C) Reconstruction Of The Sw-2 And Sw-1B Deep Wells By Building A New Above-Ground Well Casing With Complete Equipment And Pipelines , Pumps And A Power Supply And Measurement Installation, D) Construction Of New Inter-Facility Networks Of The Wwtp Along With Decommissioning Of Existing Pipelines, E) Construction Of A Clean Water Tank With A Usable Capacity Of 150 M3, F) Construction Of A System For Discharging Technological Sewage To A New Settling Tank And Further To The Receiver In Accordance With The Decision Water Permit, G) Construction Of A Neutralizer From A Chlorination Plant With A Capacity Of 3 M3, H) Construction Of A New Fence For The Water Treatment Plant And Deep Water Intakes, I) Construction Of New Roads, Squares, Internal Sidewalks, J) Construction Of Power Supply, Control And Lighting Installations, K) Delivery Of A Power Generator With An Ats System, L) Preparation Of As-Built Documentation In Accordance With The Requirements Of Construction Law Along With The Provision Of Surveying Services; Including Post-Construction Geodetic Inventory - In Paper Form (1 Copy) And In Electronic Form On Cd/Dvd (1 Copy).3) The Contractor Is Obliged To Perform Authors Supervision As Part Of The Entire Order, I.E., Among Others: Explaining Doubts Regarding The Design Documentation And The Solutions Contained Therein, Determining In The Course Of Construction Works The Compliance Of The Implementation With The Design Documentation, Agreeing On The Possibility Of Introducing Alternative Solutions To Those Provided For In The Design Documentation, Reported By The Construction Manager Or The Investors Supervision Inspector).3. Design Documentation Should Be Developed In Accordance With The Requirements Specified In The Fup, Legal Provisions And Arrangements Resulting From The Terms Of The Contract Between The Ordering Party And The Contractor. Each Part Of The Documentation Must Have A Declaration By The Designer And The Checker That It Is Made In Accordance With Applicable Polish Regulations And Design Guidelines And Is Complete From The Point Of View Of The Purpose It Is To Serve. The Design Documentation Must Include The Contractors Declaration Of Verification, Approval And Readiness For Implementation.4. The Detailed Scope Of The Subject Of The Order (Detailed Conditions For The Implementation Of The Order And Its Scope, Including The Scope Of Design Work And The Scope Of Works To Be Performed) Is Specified In The Functional And Utility Program Together With The Conditions For The Execution And Acceptance Of Works And The Bill Of Quantities (Hereinafter Referred To As Pfu) Constituting Annex No. 6 To Swz And The Draft Agreement Constituting Annex No. 5 To The Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
5e719c3e-5a51-4861-8861-e0fc92e63ddf.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.