4.1. The Subject Of The Order Are Construction Works Consisting In The Design And Subsequent Construction Of A Water Supply And Sewage Network In The Kamie Commune In The Design And Build System Based On The Functional And Utility Program Constituting Annex No. 1 To Swz.4.3. The General Scope Of The Subject Matter Of The Contract, Divided Into Tasks: 4.3.1. Task No. 1: Expansion Of The Water Supply Network In The Towns Of Kamie , Natalin, Strachos aw. The Scope Of The Order Includes The Design And Construction Of The Water Supply Network, Connection To The Existing Network, Along With The Accompanying Shut-Off And Fire Protection Infrastructure. The Assumed Length Of The Dn100 Water Supply Network Is: Pe 100Rc 125/11.4 Sdr11 Approx. 1531.0 M, Hp80 6 Pcs, Flanged Gate Valve Dn100 9 Pcs.4.3.2. Task No. 2: Expansion Of The Sanitary Sewage System At Ul. The Scope Of The Order Includes The Design And Construction Of A Sanitary Sewage System, Connection To The Existing Sanitary Sewage System (Wells In The Network) Along With The Accompanying Infrastructure. The Assumed Length Of The Dn200 Sewage Network In Kamie In Individual Sections Is: Dn200 (Ul. Malinowa) Approx. 198.0 M + Inspection Well Dn1000 8 Pieces, Dn200 (Ul. Levelkowa) Approx. 162.0 M + Inspection Well Dn1000 4 Pcs, Dn200 (Ul. Jagodowa) Approx. 60.0 M + Inspection Well Dn1000 3 Pcs, 4.3.3. Task No. 3: Expansion Of The Water Supply Network And Sanitary Sewage System At Ul. Diamentowa In The Town Of Kamie . The Scope Of The Order Includes The Design And Construction Of A Water Supply Network And Sanitary Sewage System, Integration Into Existing Networks, Along With Accompanying Infrastructure. The Assumed Length Of The Dn200 Sewage Network In Kamie In Individual Sections Is: (Road In Plot No. 959/4, 961/3, 962/4) Approx. 78.0 M + Inspection Well Dn1000 3 Pieces, (Road In Plot No. 923/6, 923/12, 924/4, 957/2, 961/1, 962/10) Approx. 75.0 M + Inspection Well Dn1000 4 Pcs, (Road In Plot No. 921 /3, 923/9, 923/15, 924/2) Approx. 67.0 M + Inspection Stage Dn1000 - 3 Pcs. The Assumed Length Of The Dn100 Water Supply Network In Kamie In Individual Sections Is (See Annex No. 2 After This Pfu): (Road In Plot No. 959/4, 961/3, 962/4) Approx. 120.0 M + Flanged Gate Valve Dn100 + Hydrant Hp80 1 Pc. (Road In Plot No. No. 923/6, 923/12, 924/4, 957/2, 961/1, 962/10) Approx. 105.0 M + Dn100 Flanged Gate Valve + Hp80 Hydrant 1 Pc. (Road In Plot No. 921/3, 923 /9, 923/15, 924/2) Approx. 105.0 M + Dn100 Flanged Gate Valve + Hp80 Hydrant 1 Pc. Note: All Parameters Given Above Should Be Treated As Expected And Indicative Values, And The Final Values Will Be Determined In Time Execution Of A Construction Project. The Final Arrangement Of The Elements Of The Water Supply And Sewage Network Should Be Designed In Accordance With The Arrangements Obtained From The Investor, The Road Owner And The Managers Of Individual Networks.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.