GTR 78636486

Tenders Are Invited For Reconstruction Of Bathrooms At The Primary School In Garbowo. As Part Of The Project: School In Garbowo For Everyone

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
78636486
Tendering Authority
Subscribe to view
Tender No
ZP.2710.PL-SPGAR.4.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Reconstruction Of Bathrooms At The Primary School In Garbowo. As Part Of The Project: School In Garbowo For Everyone
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
10-04-2024 Closed
Work Detail
Reconstruction Of Bathrooms At The Primary School In Garbowo. As Part Of The Project: School In Garbowo For Everyone 1. The Subject Of The Investment Is The Reconstruction Of Bathrooms In The Building Of The Primary School In Garbowo: 1. Scope And Characteristics Of Construction Works Resulting From Providing A Toilet In The Basement For Disabled People: To Make One Of The Two Toilets Existing In The Basement Available , For Disabled People, The Reconstruction Of Toilets (Womens And Mens) Was Planned, Consisting In Enlarging The Womens Toilet To Dimensions Consistent With The Regulations And Connecting It With A Toilet For Disabled People, And Reducing The Size Of The Mens Toilet. Carrying Out The Reconstruction As Above Requires Demolishing The Partition Wall Between The Existing Toilets And The Partition Wall With The Entrance Door To The Toilets And Constructing New Walls Made Of Plasterboards With New Door Openings Of Appropriate Width. Reconstruction Of The Walls As Above Will Require Reconstruction Of The Electrical Installation In Both Toilets. Due To The Planned Reconstruction, It Is Necessary To Remove The Existing Floors And Wall Coverings In Both Toilets And Rebuild Them, As Well As To Build A Suspended Ceiling To Mask The Under-Ceiling Sanitary Installations. The Plan Included The Dismantling Of Existing Toilet Bowls And Washbasins And The Installation Of New Ones, Along With The Reconstruction Of Installation Approaches (Water Supply And Sewage). Washbasins And Toilet Bowls For Disabled People Should Be Of A Special Design And Should Be Equipped With Appropriate Handles And Handrails. 2. Scope And Characteristics Of Construction Works Resulting From The Provision Of A Toilet On The Ground Floor For Disabled People: In Order To Make The Two Existing Toilets On The Ground Floor Of The School Accessible To Disabled People, The Reconstruction Of Toilets (Womens And Mens) Was Planned, Consisting In The Construction Of A Toilet Cubicle Adapted For Disabled People In Each Of Them. . Carrying Out The Reconstruction As Above Requires Demolishing The Partition Wall Separating The Vestibule From The Toilet Cabins And Brick Toilet Cabins In Both Toilets And Constructing New Partition Walls Made Of Plasterboards With New Door Openings Of Appropriate Width And Separating Toilet Cabins With Hpl System Partitions. Reconstruction Of The Walls As Above Will Require Reconstruction Of The Electrical Installation In Both Toilets. Due To The Planned Reconstruction, It Is Necessary To Remove The Existing Floors And Wall Coverings In Both Toilets And Rebuild Them, As Well As To Build A Suspended Ceiling To Mask The Under-Ceiling Sanitary Installations. The Plan Included The Dismantling Of Existing Toilet Bowls And Washbasins And The Installation Of New Ones, Along With The Reconstruction Of Installation Approaches (Water Supply And Sewage). Washbasins And Toilet Bowls For Disabled People Should Be Of A Special Design And Should Be Equipped With Appropriate Handles And Handrails. 3. Scope And Characteristics Of Construction Works Resulting From The Provision Of Toilets On The First Floor For Disabled People: In Order To Make The Two Existing Toilets On The First Floor Of The School Accessible To Disabled People, The Reconstruction Of Toilets (Womens And Mens) Was Planned, Consisting In The Construction Of A Toilet Cubicle Adapted For Disabled People. Carrying Out The Reconstruction As Above Requires Demolishing The Partition Wall Separating The Vestibule From The Toilet Cabins And Brick Toilet Cabins In Both Toilets And Constructing New Partition Walls Made Of Plasterboards With New Door Openings Of Appropriate Width And Separating Toilet Cabins With Hpl System Partitions. Reconstruction Of The Walls As Above Will Require Reconstruction Of The Electrical Installation In Both Toilets. Due To The Planned Reconstruction, It Is Necessary To Remove The Existing Floors And Wall Coverings In Both Toilets And Rebuild Them, As Well As To Build A Suspended Ceiling To Mask The Under-Ceiling Sanitary Installations. The Plan Included The Dismantling Of Existing Toilet Bowls And Washbasins And The Installation Of New Ones, Along With The Reconstruction Of Installation Approaches (Water Supply And Sewage). Washbasins And Toilet Bowls For Disabled People Should Be Of A Special Design And Should Be Equipped With Appropriate Handles And Handrails. 4. Scope And Characteristics Of Construction Works Resulting From Making The Toilet At The Gymnasium Available For Disabled People: In Order To Make One Of The Two Toilets Existing At The Gymnasium Accessible To Disabled People, The Womens Toilet Was Rebuilt, Which Involved Enlarging It To Dimensions Consistent With The Regulations By Adding A Part Of The Cleaning Room. Carrying Out The Reconstruction As Above Requires The Demolition Of The Partition Wall Between The Existing Womens Toilet And The Cleaning Room As Well As The Partition Wall With The Entrance Door To This Toilet And The Construction Of New Walls Made Of Plasterboards With New Door Openings Of Appropriate Width. Reconstruction Of The Walls, As Above, Will Require Reconstruction Of The Electrical Installation In The Rebuilt Toilet And The Installation Of Mechanical Ventilation Located Under The Ceiling Of The Cleaning Room. Due To The Planned Reconstruction, It Is Necessary To Remove The Existing Floor And Wall Cladding In The Rebuilt Toilet And Rebuild Them, As Well As To Build A Suspended Ceiling To Mask The Sanitary And Ventilation Installations Under The Ceiling. The Plan Included The Dismantling Of Existing Toilet Bowls And Washbasins And The Installation Of New Ones, Along With The Reconstruction Of Installation Approaches (Water Supply And Sewage). Washbasins And Toilet Bowls For Disabled People Should Be Of A Special Design And Should Be Equipped With Appropriate Handles And Handrails. Construction Works Will Be Carried Out During The Schools Operation And During Classes, Therefore They Should Be Organized In Such A Way As To Minimize Disruption To The Schools Work. While Work Is Being Carried Out, At Least One Bathroom Should Be Available To Students And School Staff. Execution Of Construction Works In Accordance With The Description, Drawings And Bill Of Quantities, Technical Specifications For The Execution And Acceptance Of Works, Constituting Annex No. 11 To This Swz.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
9b63c26a-acd0-4530-a99c-283a57aca28a.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders