Quotation Are Invited For E-Station Energy Fog Skid Header Replacement For Two Unit Re-Erect The New Header Parallel To The Existing Suction Header And Connect It To The Existing Pump Suction Piping And Other Instruments

Tender Detail

78599063
2332400815
Self-Funded
Quotation Are Invited For E-Station Energy Fog Skid Header Replacement For Two Unit Re-Erect The New Header Parallel To The Existing Suction Header And Connect It To The Existing Pump Suction Piping And Other Instruments
ICB
Asia
Arab World,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
29-03-2024

Work Detail

Quotation are invited for E-Station Energy Fog Skid Header Replacement for Two Unit Re-Erect the New Header Parallel to the Existing Suction Header and Connect it to the Existing Pump Suction Piping and Other Instruments. SCOPE OF WORKS1.#PROVIDING NEW SUCTION HEADER FOR THE FOGGING PUMPS OF GTE#1 ANDGTE#3.-#FABRICATE NEW HEADER FOGGING PUMPS USING 6# SS316L, SCH-10 OR BETTER.-#THE HEADER TO BE PROVIDED WITH SUCTION NOZZLES FOR EACH PUMP AS PERTHE EXISTING FOGGING PUMP ARRANGEMENT. -#EXISTING SUCTION ISOLATION VALVES COULD BE RE-USED FOR THE NEWHEADER.-#HEADER SHALL BE PROVIDED WITH NEW # VENT AND DRAIN WITH IS OLATIONVALVES ROUTED TO SKID DRAINS.-#RE-ERECT THE NEW HEADER PARALLEL TO THE EXISTING SUCTION HEADER ANDCONNECT IT TO THE EXISTING PUMP SUCTION PIPING AND OTHER INSTRUMENTS.-#DISCONNECT EXISTING PUMP SUCTION HEADER FROM THE DM WATER SUPPLY LINEAND RE-CONNECT THE NEW HEADER.-#HYDRO TEST NEW HEADER AT 10BARG.-#ALL PIPING, FITTINGS, FLANGES, VALVES, BLINDS REQUIRED FOR THE JOBSHALL BE MADE OF SS 316L MATERIAL AND NEEDS TO BE PROVIDED BY CONTRACTOREXCEPT FOR THE SUCTION ISOLATION VALVES WHICH CAN BE RE-USED FROMEXISTING HEADER .-#AN 1# NOZZLE WITH ISOLATION FOR FUTURE CONNECTION.-#RATING OF ALL FITTINGS TO BE NOT LESS THAN #150LBS-#CLEANING AND RE-PAINTING OF THE FOGGING PUMP SKID INCLUDING ALLPIPING AND EQUIPMENT#S AS APPLICABLE.-#FLUSH & CLEAN PIPING INTERNALLY.2.#ALL MANPOWER, ENGINE ERING, SUPERVISING REQUIRED FOR THE ABOVE JOBSINCLUDING ALL TOOLS, TACKLES, AND EQUIPMENT#S.3.#ALL PIPING USED FOR THE ABOVE WOKS SH ALL BE SS316L SEAM LESS PIPEAND STRUCTURAL STEEL SHALL BE HOT DIP GALVANIZED CARBON STEEL. Qty: 1 E-Station Energy Fog Skid Header Replacement for Two Unit Re-Erect the New Header Parallel to the Existing Suction Header and Connect it to the Existing Pump Suction Piping and Other Instruments Also. Bidders should Provide Technical Data Sheet, Material Catalogue, without Certifed Doccuments, Offer are not Acceptble. For Further Details, Please Contact Asm Mynuddin (0503620814) mynuddin.hossain@dewa.gov.ae /Marwan Al Mheiri (0501136322) (marwan.al Mheiri@dewa.gov.ae) STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332400815)/$value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail