Construction Work For Water And Sewage Pipelines 1000811 S r sen Etp 4. The Project S r sen Stage 4 Mainly Involves Separating Surface Water And Wastewater, And Renovation Of Municipal Pipelines With Pipe Transport, Blocking Out And Drawings. Stages 1-3 Have Been Carried Out. The Builder S Phase Plan Is Based On The Extent Of The Work Shown On The Plan/Profile Drawings Gh200-Gh216. The Available Site Belt And Area Set Aside To Guide Soft Road Users Past The Site Area Are Shown In The Drawings W100-W147. Divided Into Sub-Stretches With Different Execution Or Trench Cross Sections, The Total Extent Is The Following: B rumsveien: Ringstabekkveien:Oreligrenda/Flatveien:Well Danger:Underhaugsveien:Bjerkelundsveien:Grav Skolevei:
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.