GTR 78151248
Tenders Are Invited For Renovation Of The Sanitary Facility On The 1St And 2Nd Floors, Toilets For Staff - 3Rd Floor, Along With The Replacement Of The Sewage Pipes Of The Sanitary Facilities In The Zsp At 7 Sobieskiego Street In Koszęcin.
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
78151248
Tendering Authority
Subscribe to view
Tender No
GKZ.271.7.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Renovation Of The Sanitary Facility On The 1St And 2Nd Floors, Toilets For Staff - 3Rd Floor, Along With The Replacement Of The Sewage Pipes Of The Sanitary Facilities In The Zsp At 7 Sobieskiego Street In Koszęcin.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
02-04-2024
Closed
Work Detail
The Subject Of The Order Is The Renovation Of Sanitary Facilities Located On The 1St, 2Nd And 3Rd Floors Of The Building, In The School And Kindergarten Complex At Ul. Sobieskiego 7 In Koszęcin. The Renovation Of Sanitary Facilities And The Replacement Of Sewage Pipes Do Not Change The Structure Of The Building. The Renovation Works Consist Of A Comprehensive Renovation Of The Sanitary Facilities On The 1St And 2Nd Floors, The Renovation Of The Staff Bathroom On The 3Rd Floor And The Replacement Of The Sewage Pipes On The 1St-3Rd Floors With Connection To The Vent Pipeline In The Attic. A) Existing Condition: The Building Was Built Using Traditional Technology. The Load-Bearing Walls Are Made Of Solid Brick. Partition Walls Made Of Perforated Bricks. Tile Floors. The Walls Are Covered With Ceramic Tiles Up To A Height Of 2.00 M. The Ceilings Are Made Of Cement And Lime Plaster. Sewage Stacks Partially Covered With Plasterboards. B) Design Status - Demolition Works: It Is Planned To Remove Existing Wall Coverings (Ceramic Tiles, Cement-Lime Plasters), Demolition Of Partition Walls, Removal Of Floor Layers (Stoneware Tiles, Cement Floors), Replacement Of Water And Sewage Installations. In The Sanitary Rooms On The First Floor Covered By The Study. It Is Planned To Be Connected To The Sewage System Below The Sanitary Facilities On The First Floor, To Replace Cast Iron Pipes With Pvc Pipes In The Risers And Branches On Floors I-Iii And To Be Connected To The Pvc Pipeline In The Attic. C) Designed Condition - Cladding And Assembly Works: I. Floors - Clean The Substrate And Prime It With A Primer. Make A Cement Screed And Cover With Stoneware Tiles; Ii. Walls - Clean The Substrate And Prime With A Primer. Make The Cladding With Gkbi Plasterboards On Adhesive Mortar. Construction Of Water And Sewage Shafts. Made Of Gkbi Plasterboards On A Metal Frame With Acoustic Filling Made Of Mineral Wool, Thickness. 5 Cm. Facing Walls With Ceramic Tiles.Iii. Ceilings - Suspended With A Metal Structure Filled With Mineral Fiber Boards. D) Door Joinery - Internal Doors Meeting The Technical Requirements For Bathroom Doors. E) Lighting - Arrangement Of Lamps According To Drawing P2f) Installations: I. Hot Water Installation - Replacement Of The Existing Steel Pipe Installation With Pp Pipes. Approaches Under Washbasins, Toilet Bowls, Urinals According To Drawing No. P1ii. Sewage Installation - Replacement Of The Existing Sewage System From Cast Iron Pipes With Pvc Pipes. Approaches To Washbasins, Toilet Bowls, Urinals According To Drawing No. P1.Iii. Central Heating Installation - Modification Of Approaches Under The Radiator Iv. Electrical Installation – Replacement Of The Existing Electrical Installation. Diagram Of Lighting And Electrical Sockets According To Drawing P3. All Materials Used During The Task Must Have Appropriate Hygienic And Sanitary Certificates. The Installation Of Fittings And Accessories Is To Be Performed In Accordance With The Manufacturers And Suppliers Instructions.• List Of Rooms To Be Renovated:1.1. 1St Floor - Sanitary Facilities 1St Floor (In The Scope Of The Study) 77.19 No. Room Total [M2]1. Vestibule (Girls Bathroom) 2,312. Girls Bathroom 21,923. Staff Bathroom 5,034. Vestibule (Boys Bathroom) 3,245. Boys Bathroom 16,511.2. 2Nd Floor - Sanitary Facilities 2Nd Floor (In The Scope Of The Study) 77.19 No. Room Total [M2]1. Vestibule (Girls Bathroom) 2,312. Girls Bathroom 21,923. Staff Bathroom 5,034. Vestibule (Boys Bathroom) 3,245. Boys Bathroom 16,511.3. 3Rd Floor - Sanitary Facilities 3Rd Floor (In The Scope Of The Study) 5.03 No. Room Total [M2]1. Staff Bathroom 5,031.4. All Renovated Premises No. Room Total [M2]1. Renovated Rooms 159.41 The Detailed Scope Of Works Should Be Performed In Accordance With The Design Documentation, Bill Of Quantities And Stwiorb (Appendix No. 8 To Swz).
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
c58c76e3-7901-42a5-99ec-878968e01f09.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.