Tenders Are Invited For Works For Complete Or Part Construction And Civil Engineering Work Design And Construction Of The Wastewater Treatment Plant Bijelo Polje (Wwtp Bijelo Polje
Tenders Are Invited For Works For Complete Or Part Construction And Civil Engineering Work Design And Construction Of The Wastewater Treatment Plant Bijelo Polje (Wwtp Bijelo Polje
Works For Complete Or Part Construction And Civil Engineering Work Design And Construction Of The Wastewater Treatment Plant Bijelo Polje (Wwtp Bijelo Polje. This Contract Includes The Design And Construction Of: - The Wastewater Treatment Plant - Wwtp Connection To The Water Supply System - Wwtp Connection To The Power Supply System The Contractor Is Required To Design Wwtp For The Capacity Of 30,000 P.E. (Phase Ii Capacity). The Preliminary Treatment Facilities And The By-Pass Line Shall Also Be Constructed Under This Contract For The Phase Ii Capacity, While Other Facilities (Biological And Sludge Treatment) Shall Be Constructed For Phase I Capacity (20,000 P.E.). The Wastewater Treatment Process Shall Be Based On The Activated Sludge Process With Nutrients Removal And Treated Effluent Disinfection. Sludge Treatment Shall Include Sludge Pre-Thickening, Aerobic Sludge Stabilization And Dewatering. The Contract Will Also Include The Design And Construction Of The Wwtp Connection Lines To The Water Supply System For An Approximate Length Of 975 M And To The Power Supply System For An Approximate Length Of 2.000 M.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.