GTR 77274278

Tenders Are Invited For Bzp.261.3.2024 Execution Of Works Adapting The Building To Current Fire Safety Regulations In The Wcześniak Student Dormitory Of The Warsaw University Of Technology In Płock At Ul. Dobrzyńska 5 - Stage Vi

ICB — International Competitive Bid Closed Central Europe
Tender Information
GTR Reference
77274278
Tendering Authority
Subscribe to view
Tender No
BZP.261.3.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Bzp.261.3.2024 Execution Of Works Adapting The Building To Current Fire Safety Regulations In The Wcześniak Student Dormitory Of The Warsaw University Of Technology In Płock At Ul. Dobrzyńska 5 - Stage Vi
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
12-03-2024 Closed
Work Detail
The Subject Of This Order Is: Carrying Out Works To Adapt The Building To Current Fire Safety Regulations In The Wcześniak Student Dormitory Of The Warsaw University Of Technology In Płock At Ul. Dobrzyńska 5 – Stage Vi. A Detailed Definition Of The Scope Of The Subject Of The Contract Is Included In Chapter Iv Of The Swz. Smoke In Escape Routes At The Warsaw University Of Technology, Branch In Płock, Ul. Łukasiewicza 17, 09-400 Płock The Ordering Party Determines The Scope Of This Procedure: I. Works In The Electrical Industry • Installation Of A Zk2+P Switchgear On The Buildings Facade. • Equipping The Zk2+P Switchgear With 400A Protection Bases, Overvoltage Current Transformers And Voltage Protection. • Power Supply From Zk+P On The Buildings Facade To The Newly Built Rg-Ppoż In The Buildings Basement. Based On Technical Conditions.• Connection From Rg-Ppoż To Rg Building • Transfer Of Administrative Electricity Meter No. 1 From The Existing Switchboard To Rg-Poż (Under The Supervision Of The Power Plant) • Liquidation Of Electricity Meter No. 2 From The Existing Switchboard To Rg-Poż • Making Connections At The Place Of Dismantling The Existing Meters In The Rg Of The Building • Overvoltage Of The P.Poz Power Supply Circuits From The Temporary Switchgear • Overvoltage Of The Wlz Of The Ppoż Elevator Power Supply To The Rg Of The Ppoż • Power Supply Of The Dso Cabinet • Disassembly Of Disconnected Elements Such As Transformers, Base Switches That Are Unused From The Existing Rg Of The Building • Carrying Out Measurements And Commissioning Tests • Preparing A Post-Assembly Diagram And As-Built Documentation • Dismantling Elements Disconnected From The Power Supply, Such As The Old Zk On The Buildings Facade, Measuring Systems In The Old Rg Switchgear Of The Building, The Old Connection From The Zk To The Rg Of The Building. All Works Must Be Carried Out In Consultation And Under The Supervision Of Energa Operator, The Bidder Will Take Into Account All Costs Resulting From This Supervision. Ii. Works Of The Telecommunications Industry The Scope Of Execution Works Includes: Ssp Control • Installation Of Control Loop Modules • Installation Of 22 Sets Of Actuators For Release Windows • Connection Of Actuators To The Prepared Cabling • Installation Of Control And Control Modules For Controlling And Monitoring Fire Flaps Of The Smoke Exhaust System • Assembly Of Control And Control Modules For Control And Monitoring Of The Smoke Exhaust System Discharge Windows • Installation Of Control And Control Modules To Control And Monitor The Smoke Exhaust System Control Panel • Connection Of The Fire Alarm Central With The Voice Warning System Central. • Checking The Interaction Of Actuators With The Smoke Exhaust System • Development Of As-Built Documentationdsow Due To Technological Development And New Requirements, The Ordering Party Decided To Change The Alarm And Warning Methods Developed On The Basis Of Signaling Devices With Voice Messages To The Dso System. The Dso System Will Enable The Transmission Of Messages As In The Designed System Based On Acoustic Sirens With A Message And Will Additionally Allow For Extension With Messages In Many Languages. Due To The Decision To Change, The Scope Of Work Is: • Preparation Of The Technical Design Of The Dso System • Agreement On The Technical Design With The Fire Protection Expert • Installation Of The Dso System Cabling • Installation Of The Dso Loudspeakers • Installation Of The Dso Cabinet • Cabling Measurements • Measurements Of Sound Intensity And Speech Intelligibility • Preparation Of As-Built Documentation. Estimated Number Of Elements Of The Dso System. The Exact Number Of Elements Must Result From The Developed And Agreed Design And Technology Of The System Used. All Elements Used To Build The Dso System Must Have Valid Cnbop Certificates.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
e5f51792-7a9a-41eb-bc51-74db48857aad.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders