GTR 77274212
Tenders Are Invited For Improving Social Services By Modernizing Social Infrastructure In Lubasz
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
77274212
Tendering Authority
Subscribe to view
Tender No
RG.V.271.1.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Improving Social Services By Modernizing Social Infrastructure In Lubasz
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
19-03-2024
Closed
Work Detail
1. Name Of The Procedure: Improving Social Services Through Modernization Of Social Infrastructure In Lubasz 2. The Subject Of The Order Is Construction Work Consisting In The Reconstruction Of The Commune Office Building, Including The Removal Of Architectural Barriers (Construction Of An Elevator Shaft, Delivery And Installation Of An Elevator - Examination And Approval For Use By The Office Technical Inspection In Accordance With Applicable Regulations, Ramp, Emergency Exit, Sanitary Facility For The Disabled), In Accordance With Building Permit No. 552/2021 Of August 10, 2021. Renovation Construction Works And Functional Reconstruction Of The Building Of The Commune Office In Lubasz - Land Development: Earthworks , Cutting Down Trees, 4 Pcs., Replacement Plantings, 4 Pcs., Construction Of A Retaining Wall, Construction Of A Fence On The Retaining Wall And Plinth, Construction Of The Surface Of The Parking Lot, Walkways And Sidewalks Along With Substrates (Replacement Of The Asphalt Surface On The Northern Side Of The Building And The Concrete Pavement On The Eastern Side Building Is Not The Subject Of The Order), Renovation Of Lawns, Construction Of A Parking Space For The Disabled, Construction Of A Charging Station For Electric Cars With A Culvert With An Arota Pipe, Installation Of Benches With Backrests And Armrests, Relocation Of Waste Bins And Bicycle Racks, - Construction Of A Photovoltaic Installation On The Building Office And In The Garage And Warehouse Building, - Liquidation Of The Solar Hot Water Installation. Including Disposal Of Installations And Glycol, - Installation Of Air Conditioning In Rooms And Installation Of Air Conditioners, - Dismantling Of The Kitchen Core In The Basement, - Dismantling And Construction Of New External Stairs Of The Main Entrance To The Building With A Polycarbonate Roof (Stainless Steel Handrails And Balustrades, Existing Ones To Be Retained) ,- Moving The Automatic Doors To The Outer Side Of The Beam And Installing An Air Curtain,- Separating The Staircase According To The Fire Protection Zone With Smoke Removal And Hydrants,- Making New Ceramic Cladding On A Bond Layer On Terrazzo: Corridors, Staircase And Rooms No.: 306, 320 - 2Nd Floor, - Replacement Of Door Joinery In Existing Openings In The Corridors - Door Opening Directions In Accordance With The Design Towards The Interior Of The Offices (Measurement Of The Dimensions Of Door Openings Is Necessary Before Ordering Carpentry), - Construction Of A Social Room On The 2Nd Floor, - Construction Of Partition Walls For A New Functional Layout With Installation Of Joinery And Painting And Construction Of Floors From At Least Ac5 Panels In New Offices, - Construction Of A Bathroom On The Ground Floor Next To The Boiler Room With Z-Type Ventilation, - Replacement Of Floors In The Basement - Basement, - Construction Of New Sewage Installations Under The Floor In The Basement - Basement, - Replacement Of Radiators Including Valves In The Basement, - Replacement Of Rainwater Pipelines, - Replacement Of Led Lighting In The Basement, - Implementation Of Electrical Installation In The Archive In Accordance With The Electrical Industry Design, - Implementation Of Electrical Installation: Call System, Smoke Removal System, Photovoltaic Pv, - Installation Of Emergency Lighting And Evacuation, - Installation Of Ventilation And Air Conditioning Power Supply, - Monitoring, - Installation Of A Water Supply Connection, - Installation Of A New Copper Structured Cabling Installation To Power Computer Devices, Ip Telephony, Cctv Installation, Wi-Fi Devices And A Dedicated Electrical Installation. All Works Should Be Performed In Accordance With: Technical Design - Land Development, Technical Design - Supplementation, Land Development, Technical Design For The Construction Industry (Underpinning The Foundations Is Not The Subject Of The Order), Technical Design For The Electrical Installations Industry, Technical Design For The Sanitary Industry, Executive Design - Network Construction Structural Lan, Cctv In The Renovated Building Of The Lubasz Commune Office And The Principles Of Construction Art. The Detailed Scope Of Works Is Described In The Design Documentation Constituting Annex No. 1 To The Swz And In The Technical Specifications For The Execution And Acceptance Of Works Constituting Annex No. 2 To The Swz And Also Includes All Works Not Specified Directly In These Documents, But Without Which The Order Cannot Be Performed.3. The Ordering Party Pursuant To Art. 95 Section 1 Of The Public Procurement Law Requires That The Contractor Or Subcontractor Employs, Under An Employment Contract, Persons Performing Activities Related To The Execution Of The Contract, The Performance Of Which Consists In Performing Work In The Manner Specified In Art. 22 § 1 Of The Act Of June 26, 1974 - Labor Code (Journal Of Laws Of 2023, Item 1465). In Particular: 1) The Ordering Party Requires That The Contractor Or Subcontractor Employ, Under An Employment Contract, Persons Performing The Activities Indicated Below During The Execution Of The Order: Construction Works Performed By Workers On The Basis Of Design Documentation - Operators Of Earthworks Machines, Construction Workers Performing Works Specified In The Bill Of Quantities Works.2) During The Execution Of The Order, The Ordering Party Is Entitled To Perform Inspection Activities Towards The Contractor Regarding The Contractors Or Subcontractors Compliance With The Requirement Of Employing Persons Performing The Activities Indicated In Point 1 Under An Employment Contract. The Ordering Party Is Entitled In Particular To: A) Request Declarations And Documents Confirming Compliance With The Above-Mentioned Requirements. Requirements And Assessing Them, B) Requesting Explanations In Case Of Doubts Regarding Confirmation Of Compliance With The Above-Mentioned Requirements. Requirements, C) Carrying Out On-Site Inspections Of The Performance Of The Service.3) During The Execution Of The Order, At Each Request Of The Ordering Party, Within The Deadline Specified In The Request, The Contractor Will Submit To The Ordering Party The Evidence Indicated Below In Order To Confirm The Fulfillment Of The Requirement Of Employment Under An Employment Contract By The Contractor Or Subcontractor Of Persons Performing Activities During The Execution Of The Order Indicated In Point 1: • Declaration Of The Contractor Or Subcontractor On The Employment Under An Employment Contract Of Persons Performing The Activities Referred To In The Ordering Partys Request. This Declaration Should Include In Particular: Precise Identification Of The Entity Submitting The Declaration, Date Of Submission Of The Declaration, Indication That The Activities Covered By The Request Are Performed By Persons Employed Under An Employment Contract, Together With An Indication Of The Number Of These Persons, Their Names And Surnames, The Type Of Employment Contract And The Salary. Full-Time Position And The Signature Of The Person Authorized To Submit A Declaration On Behalf Of The Contractor Or Subcontractor. The First Declaration Will Be Submitted To The Ordering Party No Later Than 7 Days After The Conclusion Of The Contract, The Subsequent Declarations In Accordance With The Provisions Contained Above.4) Due To The Failure Of The Contractor Or Subcontractor To Meet The Requirement Of Employing Persons Under An Employment Contract Performing The Activities Indicated In Point 1, The Ordering Party Provides For A Sanction In The Form Of The Contractors Obligation To Pay A Contractual Penalty In The Amount Specified In The Relevant Provisions Of The Public Procurement Contract. Failure By The Contractor To Submit The Evidence Requested By The Ordering Party To Confirm That The Contractor Or Subcontractor Has Met The Employment Requirement Under The Employment Contract Within The Deadline Set By The Ordering Party Will Be Treated As The Contractors Or Subcontractors Failure To Meet The Requirement To Employ Persons Performing The Activities Indicated In Point 1 Under The Employment Contract. 4. In Case Of Justified Doubts As To Compliance With Labor Law By The Contractor Or Subcontractor, The Ordering Party May Request An Inspection By The National Labor Inspectorate.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
bd279249-20a7-46c4-9c66-5d8e97685323.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.