GTR 77274088
Tenders Are Invited For Construction Of A Sanitary Sewage System In Węgrów - Stage I
ICB — International Competitive Bid
Closed
Central Europe
Tender Information
GTR Reference
77274088
Tendering Authority
Subscribe to view
Tender No
FEiZP.271.1.2.2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A Sanitary Sewage System In Węgrów - Stage I
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Central Europe
Political Region
European Union
Last Date of Bid Submission
12-03-2024
Closed
Work Detail
The Subject Of The Order Is The Construction Of A Sanitary Sewage Network In Węgrów - Stage I, Carried Out On The Basis Of The Documentation Entitled Construction Of A Sanitary Sewage System In The Area Of The Streets: Nowiny, Szamoty, Grudzie Iii In Węgrów - Stage I Enabling The Discharge Of Sanitary Sewage Into The Collective Sewage System From Properties Located In The Town Of Wegrów In The Area Of The Streets: Nowiny And Urocza. The Scope Of Works For The Investment In Question Includes:1 . Construction Of The Main Sanitary Sewer From Solid-Wall Pvc-U Sn8 Dn200 Pipes Connected With A Rubber Gasket On A Sand Bed Of Thickness 15 Cm With A Total Length - L = 2071.9 M With Side Branches Made Of Solid-Wall Pvc-U Pipes Sn8 Dn160 Connected With A Rubber Gasket On A Sand Bed Of Thickness. 15 Cm With A Total Length L = 462.0 M.2. Equipping The Sanitary Sewer With Inspection Chambers Ø1000 - 24 Pcs., Inspection Chambers Ø425 - 47 Pcs. And Duct Ventilators - 3 Pcs.;3. Construction Of A Sanitary Pressure Channel From Pe100 Pn10 Sdr17 Dn110x6.6 Pipes On A Sand Bed With A Thickness Of 15 Cm, Connected By Electrofusion Welding, Total Length L = 546.4 M;4. Arming The Discharge Channel With Channel Cleaners Ø1000 – 1 Set, Expansion Chambers Peø1000 – 3 Pcs.5. Made Of One Complete, Maintenance-Free Pp-3 Tank Sewage Pumping Station Along With The Infrastructure Of The Pumping Station Area. Attention! The Pumping Station Control And Data Transmission System Must Be Compatible With The Program Currently Used By The Sewage Network Operator To Visualize The Operation Of Network Sewage Pumping Stations. As Part Of The Task, The New Sewage Pumping Station Must Be Attached To The Existing Visualization. Therefore, It Is Recommended To Select The Pumping Station After The Operators Approval. As Part Of The Execution Of The Subject Of The Order, The Following Should Also Be Performed: 1. Geodetic Determination Of The Route, Elevations, Etc. Attention! The Design Documentation Was Prepared In The Then Applicable Kronsztadt 86 Elevation System. Currently, The Applicable Elevation System Is The Amsterdam System And Elevation Elevations Should Be Marked In Accordance With It When Carrying Out Network Works. According To This Arrangement, As-Built Documentation Should Also Be Prepared, Including An Inventory.2. Marking Of Works;3. Delivery Of Materials;4. Carrying Out Preparatory Works, Including Demolition Of Existing Surfaces, Test Excavations And Suspension Of External Installations;5. Execution Of Excavations, Including Strengthening The Walls Of The Excavation And Its Possible Drainage;6. Laying Sewage Pipes, Branches, Installation Of Protective Pipes, Sewage Manholes (Attention! If The Manhole Covers Provided For In The Design Documentation Will Have A Manhole Closure With Screws, Only Acid-Resistant Steel Screws Should Be Used - Resistant To The Aggressive Sewage Environment) , Channel Ventilators, Expansion Wells, Channel Cleaners;7. Backfilling And Compacting The Excavation With Dismantling The Reinforcements Of The Excavation Walls;8. Execution Of Part Of The Works Using The Directed Drilling Method - Details, Design Documentation - Iv. Technical Design,9. Restoring The Surface After The Works;10. All Auxiliary And Accompanying Works That Are Necessary For The Proper Performance Of The Works Included In The Cost Estimate, Including Works Resulting From Technical Specifications And Design Documentation,11. All Other Works, Works, (Laboratory) Tests, Activities, Obligations And Requirements Arising From This Specification (Contract, Technical Specification, Design Documentation, Bill Of Quantities), Surveying Services, Greenery Protection, As-Built Surveying Inventory, Tightness Tests, Pressure Tests, Camera Recording , Temporary Traffic Organization Design, Works Organization Design. 12. In Matters Not Regulated In This Specification, The Applicable Technical Conditions For The Execution And Acceptance Of Construction Works, Polish Standards And European Standards, If Applicable In Poland, And Construction Law Provisions Should Be Observed. Note! The Scope Of The Investment Implementation Excludes The S22 Well Along With Sections: S22 Towards A11 16 Ms22 Towards A5 20 Ms22 To S 22.1 Transverse Crossing, Marked In The Design Documentation. Above The Scope Of Works Has Already Been Performed During The Implementation Of Another Investment. The Contractor Is Obliged To: 1) Perform The Subject Of The Contract In Accordance With The Submitted Offer, Design Documentation, Stwiorb, The Provisions Of The Act Of July 7, 1994 Construction Law (Consolidated Test, Journal Of Laws Of 2020, Item 1333, As Amended), Implementing Provisions Of This Act, Other Applicable Legal Provisions, Including Those Relating To Environmental Protection And The Principles Of Sound Technical And Construction Knowledge, 2) Taking Over The Construction Site In Terms Of The Subject Of The Order, Its Protection And Marking , Construction Of Construction Facilities And Their Removal After Completion Of The Works, Implementation Of Safety And Traffic Maintenance Elements, Construction Boards, Execution Of Preparatory Works Necessary For The Comprehensive Implementation Of The Task, And Other Requirements (Including Securing Geodetic Control Points And Restoring Them At Their Own Expense In Case Of Damage Along With Preparation Of Documentation), 3) Analysis Of Design Documentation, Stwiorb And Making Arrangements And Fulfilling Provisions Regarding The Subject Of The Contract At Its Own Expense, Purchase And Delivery Of Materials, Structures And Devices Necessary To Perform The Subject Of The Contract. 4) Securing The Construction Site Against Access Unauthorized Persons, Ensuring Constant Supervision Of The Works By An Authorized Person, Coordinating And Supervising The Works That Are The Subject Of The Contract, Compliance With Occupational Health And Safety And Fire Protection Regulations. And Ensuring Order Around Workstations And On The Construction Site, Restoring Temporarily Occupied Areas To The Condition On The Day They Were Taken Over And Repairing Any Damage Caused By The Implementation Of Works On Access Roads To The Construction Site And Areas And Buildings Adjacent To The Construction Site, Conducting And Organizing Works In A Way That Allows Access To Properties Adjacent To The Site Of Works. In The Event Of Destruction Or Damage To The Property Of Third Parties During The Performance Of Works For Reasons Attributable To The Contractor Or Subcontractors - The Contractor Is Obliged To Restore The Previous Condition And Repair The Resulting Damage, 5) Provide Certificates, Technical Approvals, Declarations Of Conformity And Declarations Of Performance Allowing Materials/Devices Intended For Installation, In Accordance With The Construction Law And Applicable Regulations, To Be Used By Designated Investor Supervision Inspectors 7 Days Before Their Installation/Installation, 6) Removal And Disposal Of All Construction Waste In The Manner Specified In Applicable Regulations And Incurring The Related Costs Related, 7) Felling Of Trees, Removal Of Wood, Removal Of The Effects Of Damage Caused By The Forces Of Nature (E.G. Tipping And Scrap), 8) Implementation Of The Recommendations Of The Investor Supervision Inspectors Entered In The Construction Log. The Contractor Is Obliged To Obtain All Information That May Be Necessary To Prepare The Offer. The Contractor Will Bear All Costs Related To The Preparation And Submission Of The Offer. The Contractor Is Obliged To Be Liable For Damages And Consequences Of Accidents Involving Employees And Third Parties Arising In Connection With The Works Carried Out, Including The Movement Of Motor Vehicles. For This Purpose, It Is Advisable For The Contractor To Insure His Business Against Civil Liability, Secure The Construction Site And Mark The Works In The Road Area In Accordance With The Regulation. Minister Of Infrastructure Of September 23, 2003 On Detailed Conditions For Road Traffic Management And Supervision Over This Order (Consolidated Text: Journal Of Laws No. 2017, Item 784 Of March 24, 2017). The Contractor Is Obliged To: 1) Submitting A Schedule Of Material And Financial Execution Of The Works (According To The Template), An Offer Cost Estimate Before Signing The Contract.2) To Ensure Continuous Supply Of Utilities To Properties Located Within The Works.3) During The Execution Of The Works, To Enable Temporary Access To Properties Located Within The Works. Bill Of Quantity Works Constituting An Annex To The Swz Is An Auxiliary Document For Preparing The Price Calculation By The Contractor. The Offer Price Should Include The Solution And Removal Of All Conflicts Included And Not Included In The Bill Of Quantities (And Included In The Design Documentation) And All Other Works Necessary To Achieve The Result Of The Contract. Co-Financed Task From The Resources Of The Government Fund Polish Order: Strategic Investment Program.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
2617605b-9ca8-4ec2-808e-105476a7cce6.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.