GTR 77217053
Tenders Are Invited For Construction-Site Supervision Services - Selection Of A Contractor For The Preparation Of A Compliance Assessment And Implementation Of Construction Supervision During The Execution Of A Site: Engineering - Design, Authors Supervision And Cmr For A Site: Replacement Of Existing Water Supply And Building Diversions On Sakar Street Mountain In The Section From Macedonia Street To Vasil Levski Street In The Town Of Harmanli
ICB — International Competitive Bid
Closed
Eastern Europe
Tender Information
GTR Reference
77217053
Tendering Authority
Subscribe to view
Tender No
119988-2024
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction-Site Supervision Services - Selection Of A Contractor For The Preparation Of A Compliance Assessment And Implementation Of Construction Supervision During The Execution Of A Site: Engineering - Design, Authors Supervision And Cmr For A Site: Replacement Of Existing Water Supply And Building Diversions On Sakar Street Mountain In The Section From Macedonia Street To Vasil Levski Street In The Town Of Harmanli
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
Eastern Europe
Political Region
Balkans,European Union,G20
Last Date of Bid Submission
03-04-2024
Closed
Work Detail
Construction-Site Supervision Services - Selection Of A Contractor For The Preparation Of A Compliance Assessment And Implementation Of Construction Supervision During The Execution Of A Site: Engineering - Design, Authors Supervision And Cmr For A Site: Replacement Of Existing Water Supply And Building Diversions On Sakar Street Mountain In The Section From Macedonia Street To Vasil Levski Street In The Town Of Harmanli. The Subject Of This Public Procurement Includes The Provision Of Consulting Services Under Art. 166, Para. 1 Of The Zut - Exercise Of Construction Supervision And Preparation Of A Compliance Assessment Report For A Site: Engineering - Design, Authors Supervision And Smr For A Site: Replacement Of Existing Water Pipe And Building Diversions Along Sakar Planina Street In The Section From Macedonia To Vasil Levski Street In The Town Of Harmanli The Total Estimated Value Of This Public Procurement Is Bgn 4,000.00 (Four Thousand) Excluding Vat. The Deadline For The Execution Of The Order Is From The Date Of The Start Of The Execution Of The Contract Until The Completion Of All Undertaken Commitments, As Follows: Deadline For Preparation Of The Investment Project Compliance Assessment And Complex Report - 7 (Seven) Calendar Days From The Handover Of The Investment Project To The Object. Deadline For Implementation Of The Construction Supervision: The Deadline Begins To Run From The Date Of Signing Of The Protocol No. 2 For The Opening Of A Construction Site And Determination Of The Construction Line And Level, According To Regulation No. 3 Of 31.07.2003 For Drawing Up Acts And Protocols On During The Construction And Is Until The Date Of Signing Of The Constitutive Act To Establish The Suitability For Acceptance Of The Construction, Sample 15 Of Ordinance No. 3 Of 2003 For Drawing Up Acts And Protocols During The Construction. Deadline For Preparation Of The Final Report, Technical Passport - In 7 Calendar Days, After Signing Of Act No. 15 And After The Issuance Of Written Opinions By The Specialized Control Bodies On The Lawful Execution Of The Construction And On Its Readiness For Commissioning, To Prepare And Submit To The Contractor A Final Report Within The Meaning Of Art. 168, Para. 6 Of The Zut And Technical Passport Of The Site. The Deadline For Removing Omissions, Remarks And Comments On The Submitted Documentation Is 3 (Three) Calendar Days, Counted From The Receipt Of A Letter With The Described Omissions, Remarks And Comments. The Public Order Is Financed With Funds From The Harmanli Municipality Budget. The Indicated Estimated Value Of The Order Is The Maximum Financial Resource Available To The Contracting Authority. Bids Of Participants That Exceed The Above-Defined Maximum Value And/Or The Maximum Values Of Some Of The Activities Will Be Removed From Participation In The Procedure As Not Meeting The Previously Announced Conditions Of The Contracting Authority. The Price Offer Includes All Costs Related To The Quality Performance Of The Order In The Type And Scope Described In The Technical Specifications. The Execution Of The Contract Is Assigned Under The Terms Of Art. 114 Of The Public Procurement Law - At The Time Of The Opening Of The Public Procurement, No Funding Was Provided. In Connection With The Latter, The Present Public Procurement Is Opened Under The Condition That The Implementation Of Its Subject Will Begin After Securing Funding, Of Which The Contracting Authority Notifies The Contractor In Writing. Pursuant To Art. 114 Of The Civil Code, Each Of The Parties May Request Termination Of The Contract After A 3-Month Period From Its Conclusion. Cog
Key Value
Tender Value
400,000 - BGN
Tender Documents
Global Tender Document
873c306d-2e0d-45cf-83bf-c972739ca8df.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.